IR 05000334/1979010
| ML19246C436 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 05/25/1979 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dunn C DUQUESNE LIGHT CO. |
| Shared Package | |
| ML18081B340 | List: |
| References | |
| NUDOCS 7907240609 | |
| Download: ML19246C436 (2) | |
Text
.
(Mdgu
.
c
-
UNITED STATES
[paato, n
o, NUCLEAR REGULATORY COMMISSION
[
'n
REGION I
.. k 631 PARK AVENUE Q
$
KING OF PRUSSI A, PENNSYLV ANIA 19406
%...../
25 ggy 797g Docket No. 50-334 Duquesne Light Company ATTN: Mr. C. N. Dunn Vice President Operations Division 435 Sixth Avenue rittsburgh, Pennsylvania 15219 Gentlemen:
-
Subject:
Inspection 50-334/79-10 This refers to the inspection conducted by Mr. J. P. Durr of this office on April 18-20,1979 at Beaver Valley Power Station, Unit No.1, Shippingport, Pennsylvania of activities authorized by NRC License No. DPR-66 and to the discussions of our findings held by Mr. Durr with Mr. J. J. Carey of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Offic.e of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, measurements made by the inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which addresses with specificity the items which will be considered by the Comission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be inenrporated as far as possible into a s2parate part of the affidavit.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
,.
,
7907'240609 Jo2 236
-
.
..
.
Duquesne Light Company
No reply to this letter is required; however, should you have any questions concerning this inspection, we wili be pleased to discuss them with you.
Sincerely,
.,
(A6
'
C Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch Enclosure:
Office of Inspection and Enforcement Inspection Report Number 50-334/79-10 cc w/ encl:
F. Bissert, Technical Assistant Nuclear R. Washabaugh, QA Manager J. Werling, Station Superintendent G. Moore, General Superintendent, Power Stations Department J. J. Carey, Nuclear Technical Assistant bNA lb?