U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION I
Report No.
50-334/79-19 Docket No.
50-334 License No.
R-66 Safeguards Group IV Licensee:
Duquesne Light Company 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Facility Name:
Beaver Valley Power Station, Unit 1 Inspection At:
Shippingport, Pennsylvania Inspection Conducted:
August 27-28, 1979 Date of Last Material Control and Accounting Inspection:
December 7, 1977 Type of Inspectionb Unannounced Material Control & Accounting idf15-! 7 9 Inspectors: /
/,
t G$ith,Auditork n/ac n
'date i
R. Sommers, Auditor Idate date
-
Approved by:
w-[
/o [? r /77 J. Hj Joge, Chipf, Nuclear Material Control 4 ate /
port 3ection, Safeguards Branch Inspection Summary:
Areas Inspected:
Material Control and Accounting. The inspection involved 24 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.
Results:
The licensee was found to be in compliance with NRC requirements in the areas examined.
1631 115 Region I Form 166 (August 1979)
791220053p
REPORT DETAILS 1.
Key Persons Contacted
- W. Marquardt, Station Office Manager
- H. Williams, Chief Engineer
- D. Williams, Results Coordinator
- L. Hutchinson, Station Quality Assurance
- J. Scott, Refueling Coordinator
- A. Mosso, Quality Assurance
- D. Batina, QA Engineer
- F. Lipchick, Station Quality Assurance
Denotes those present at the exit interview.
2.
Licensee Action on Previous Inspection Findings There were no items of noncompliance noted on the previous inspection.
(Report 77-34)
3.
Exit Interview The inspectors met with licensee representatives (denoted in paragraph 1)
at the conclusion of the inspection on August 28, 1979.
The inspector summarized the scope and the findings of the inspection.
4.
Unresolved Items There were no unresolved items noted.
5.
Independent Inspection Effort The inspectors made a walk through tour of the plant observing plant operations, specifically plant security and health safety practices.
6.
MC 851028 - Material Control and Accounting No items of noncompliance noted.
The inspection results were attained through a review and evaluation of all phases of the licensee's material control and accounting program, discussions with licensee management, and a tour of the facility observing plant operations.
The review and eval-uation covered:
(a) Inventory Practices - It was noted that the licensee has conducted physical inventories at the required frequencies.
The initial core loading was still in use.
There was no storage of spent fuel.
New fuel was verified by piece count.
Also, the core chart listing was checked to the element history file.
There were no discrepancies noted.
See Exhibits I and II for the inventory (Material Balance)
as of March 31, 1979.
1631 116
- e
(b) Records and Report - An audit of the licensee's Form NRC-741s and Form NRC-742s for the inspection period April 1, 1977 to March 31, 1979 was conducted.
The forms were reviewed for proper signature, timeliness, format and accuracy.
During the review no discrepancies were noted.
(c) Internal Controls - The licensee had designated the Reactor Core, New Fuel Storage Area, and the Spent Fuel Pool as one ICA and no internal transfer documents are used.
However, control is maintained by various charts and the element history file.
(d) Reports on Production and/or Depletion of SNM - The licensee uses a computer program (" TOTE") to calculate production / depletion of SNM.
The program integrates thermal output to determine burnup for each element.
The data is reported on Form NRC-742.
1631 117
..
EXHIBIT I Period:
4/1/77 to 3/31/79 Material Balance Summary Enriched Uranium RIS:XGD Grams Element Isotope Beginning Inventory @ 4/1/77 71959156 1730006 Receipts 24673697 788374 Material to Account For 96632853 2518380 Removals:
Burn-up 1191065 687953 Total Removals 1191065 687953 Ending Inventory @ 3/31/79 95441788 1830427 Material Accounted For 96632853 2518380 1631 118
.,.,
EXHIBIT II Period:
4/1/77 to 3/31/79 Material Balance Summary Plutonium RIS:XGD Grams Element Beginning Inventory @ 4/1/77 79764 Production 339318 Material to Account For 419082 Total Removals:
Ending Inventory @ 3/31/79 419082 Material Accounted For 419082 1631 119