IR 05000400/2016406

From kanterella
Jump to navigation Jump to search
NRC Material Control and Accounting Inspection Report 05000400/2016406
ML16299A095
Person / Time
Site: Harris 
Issue date: 10/25/2016
From: Steven Rose
NRC/RGN-II/DRP/RPB4
To: Faulk L
Progress Energy Carolinas
References
IR 2016406
Download: ML16299A095 (5)


Text

October 25, 2016

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000400/2016406

Dear Mr. Faulk:

On September 30, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Shearon Harris Nuclear Power Plant, Unit 1. On October 18, 2016, the NRC inspectors discussed the results of this inspection with Mr. Waldrep and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Steven D. Rose, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Docket No.: 50-400 License No.: NPF-63

Nonpublic Enclosure:

NRC MC&A IR 05000400/2016406 w/Attachment: Supplemental Information

cc w/ enclosure: See page 3 cc w/o enclosure: Distribution via ListServ

ML16299A089 (Cover letter w/ enclosure)

ADAMS ACCESSION NUMBER: ML16299A095 (Cover letter)

Entire Report:

SUNSI Review Complete By: Steven D. Rose Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

MD 3.4 Non-Public A.3 Cover Letter Only:

SUNSI Review Complete By: Steven D. Rose Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

SUNSI Review Complete OFFICE RII: DRP RII: DRP RII: DRP RII: DRP

NAME MRiches DJackson JDodson SRose

SIGNATURE MJR4 via email DXW4 JSD via email SDR2

DATE 10/14/2016 10/14/2016 10/13/2016 10/21/2016 cc:

Mr. Edward T. ONeil Director Nuclear Protective Services Duke Energy Corporation 526 South Church Street (M/C EC 5ZD)

Charlotte, NC 28202 Letter to Linwood Faulk from Steven D. Rose dated October 25, 2016

SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000400/2016406

DISTRIBUTION:

M. Kowal, RII S. Price, RII S. Maxey, RII RIDSNRRDIRS OE Mail RidsNrrPMShearonHarris Resource PUBLIC