Forwards IE Insp Repts 50-400/80-28,50-401/80-26, 50-402/80-26 & 50-403/80-26 on 801201-26.No Noncompliance Noted
ML18017B332
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 01/30/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML17198A126 List:
References
NUDOCS 8103040074
Download: ML18017B332 (4)


Text

Cy

~i 0O I

+

~O UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N,W., SUITE 3100 ATLANTA,GEORGIA 30303 Jtw,N 30 1981 Carolina Power and Light Company ATTN: J. A. Jones Senior Executive Vice President and Chief Operating Officer

- 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:

Subject:

Report Nos. 50-400/80-28, 50-401/80-26, 50-402/80-26 and 50-403/80-26 This refers to the routine safety inspection conducted by G. F. Maxwell of this office on December 1-26, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-158, CPPR-159, CPPR-160 and CPPR-161 for the Shearon Harris facility, and to the discussion of our findings held with S.

D. Smith and R.

M. Parsons at the conclusion of the inspecti'on.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

.report will be placed in the NRC's Public Document Room. Ifthis report contains any" information that you (or your contractor) believe to be proprietary, it is necessary that you make a written appl'ication within 20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the-application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report willbe placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, C. E. Murp y, Chic Reactor Construction and Engineering Support Branch Enclosure:

(See Page 2)

810804007/I

Carolina Power and, light Company Enclosure:

Inspection Report Nos. 50-400/80-28, 50-401/80-26, 50-402/80-26 and 50-403/80-26 cc w/encl:

R. Parsons, Site Manager

'V 0