gpss REGII, Mp.0 o-I n
C O
lih
~+*++
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Report Nos.
50-400/80-27',
50-401/80-25, 50-402/80-25 and 50-403/80-25 Licensee:
Carolina Power and Light Company 411 Fayetteville Street Raleigh,,
NC 27602 Facility Name:
Shearon Harris Nuclear Power Plant License Nos.
CPPR-158, CPPR-159, CPPR-160 and CPPR-161 Inspection a, 'i near Raleigh, NC InspectoI:
M. P.
leinsorg Approved by:
A. R. Herdt,. Section Chief, RCES Branch SUMMARY e/S/
Date Si ned
>P 8'ate Signed Inspection-on.,December 2.-5,, 1980 I
Areas, Inspected.
This routine, unannounced 'inspection. involved 30.inspector-hours-on site in the areas of licenseeaction on "previous* inspection findings;,.safety-related piping and licensee identified. items.
Results:
Of the three areas inspected, no. violations or. deviations were identified in one area; one'iolation was found in each of two areas (Violation - Failure to take effective corrective actions for reinforcing steel storage - paragraph 3.a, Violation - Inadequate procedure for welder qualification - paragraph 6.b.(3)(c).)
One uncorrected item of noncompliance was identified - "Failure to'ollow reinforcing steel storage procedure--
paragraph 3.a.
$3P:4gRP
DETAILS 1,.
Persons Contacted Licensee Employees
"S. D. Smith, Vice President, Construction
"P.
W. Howe, Vice President, Technical Services
"N. J. Chiangi, Manager; Engineering and Construction QA
- R M. Parsons, Site. Manager
"A. M. Lucas, Sr. Resident Engineer G; L. Forehand, Principal QA Specialist
"R.. Hanford, Principal Engineer, Melding/Metallurgy
- C. R. Osman, Project QA Specialist'G; M; Simpson, Principal'onstruction Specialist
"E. E. Millett, Principal Engineer-Mechanical Other-licensee employees contacted included construction craftsmen, inspec-tors, mechanics, security force members, and office personnel.-
Other Organizations P
- B. B. Isom Daniels Construction Company, C'onstruction Manager NRC"Resident Inspector."
- G.. F. Maxwell
"Attended. exit. interview.
2.
Exit Interview The inspection scope and findings were summarized on December 5,
1980 wi.th those persons indicated, in Paragraph.
1, above.
The inspector discussed the uncorrected item of noncompliance concerning reinforcing steel'storage, the two new violations and the new unresolved item in detail.
No dissenting comments were received from the Licensee.
M AYE 3.
Licensee. Action on Previous Inspection Findings a 0 (Open) I'nfraction 400/80-15-02',
401, 402, 403/80-13-02:
Failure to Follow Reinforcing" Steel Storage Procedure".
3 his item concerns the licensee's failure to store reinforcing steel in Level D conditions.
This item was reported to the Licensee by NRC letter dated July 24, 1980..
The.
Licensee.
stated in their letter dated August 19, 1980, reinforcing bars were no longer in contact with mud or water.
The Licensee 'further stated in the.,
same letter, that full complia'nce is considered to have been achieved on August 4, 1980.
NRC Report 40/80-23, 401, 402, 403/80-21 stated that the inspectors noted no
b..
4.
Unresolved. Items r
change in reinforcing steel storage conditions.
The above was discussed at length by RII supervisory personnel with the CP&L. Vice President, construction and the CP&L Vice President, Technical Services
'uring-the exit interview on October 3, 1980.
On December 3,
1980 this inspector noted no apparent change in rein-forcing steel storage conditions.
- The inspec'tor discussed-the above with. the Licensee's Site Manager.
The inspector stated the (1)
Corrective steps taken"and results achieved, (2) Corrective steps taken to avoid further noncompliance and (3) the date when full compliance wil:1'e achieved,.
as stated in the Licensee's August 19, 1980 letter-;
could., not, be substantiated.
by the present reinforcing steel storage conditions.
Fai'lure to establish adequate measures to assure that conditions adverse to quality, such as deficiencies are promptly corrected is. in violation of 10 CFR 50 Appendix B, Criterion XVI.
By 12':00,p.m.,
Decembe'r 4",
1980the unacceptable reinforcing steel storage-condition had been corrected.
The Licensee committed to provide. a.,supplemental response-to Item B'f CP&L letter of August
.19,'980, to the RII. office by, December 25, 1980..
P wl This: item will remain open pending the receipt of the supplemental response and'ubsequent-examination in this area.
I'n additf'on to'he above,,'
new: violation is opened; 400/80-27-01, 401',
402; 403'/80-25-01:
"Failure to take. effective corrective. action for-reinforcing steel'.storage!'.
(Open)
I'nfraction 400/80-23-02, 401, 402,. 403/80-21-02:
"Weld Rod Control." This item concerns. the; Licensee's. failure to control welding filler materials.
NRC Report. 400/80-25, 402, 403-80-23 reported an example of 'continued noncompliance in the area of Weld Rod Control.
Thi's. i'nspection observed an-abandoned.
welder pouch adjacent to Weld Joint. 2SW-168-SW-1.,
The above is contrary to. CP&L internal memo. dated..
October.,
1980 and Daniel Memo dated November 11, 1980.
The above was discussed with Site Principal Engineer, Welding/Metallurgy.
This item
= remains open..
Unresolved. items are matters about which more information is required to determine whether they are acceptable or may involve noncompliance or deviations..
New unresolved'tems-identified during this inspection are discussed in Paragraph 6a(l).
Independent, Inspection Effort (Units 1, 2, 3 and 4)
The inspector conducted a general inspection of'he power block construction site,, the pipe fabrication shop, the pipe storage area and the main and west auxiliary dams to observe. construction progress and construction activties
h
such as welding, nondestructive examination, material handling and control, housekeeping and storage.
Within.,the areas examined, no violations or deviations were identified.
6'.
Safety-Related Piping The inspector observed non-welding and welding work activities..for safety-realted piping as described below to determine whether applicable, code and procedure requirements were being met'.
The applicable code for safety-related, piping is the ASME B and PV Code, 1974 edition with addenda through winter 1976'.
a ~
Unit HP-05 Rev.
MP-06,Rev.
MP-07 Rev: 7 WP-112 Rev.
Observation of Non Welding Activities Observation of specific work activities were conducted-to determine conformance; where. applicable, with the following; inspection and/or work procedures, record keeping,. installation specifications or plans, specified materials, specified.NDE, cal'ibration and us'e of proper test equipment.and qualified inspection and NDE. personnel.
System or
~Activit
~Con onent Procedure Marking Various.
1 5,2 Handling.'arious 12 MP-07 Rev.7 WP-102 Rev.
WP-21 Rev.
Protection
-.-'-
Various '--
Preservation" Various 1. 5. 2.
'1,52
. WP-21
'Rev.
2,.
WP-112 Rev.
WP-113 Rev.
WP-112 Rev.
WP-1'13 Rev.
MP-07 Rev.
WP-102 Rev.
(1)
With regard to the. above inspection, the inspector was. informed, by several piping supervisors, that their men used'i'ed pencils to make temporary fitting marks on stainless steel piping.
CP5L Pro-cedure: WP-112, Rev..
1 "Control of Materials and Equipment That May be Harmful to Stainless Steel" with Attachment PGD-005, Rev.
3,, is the CP5L procedure that specifies approved marking materials for stainless steel.
Red'encils are not included in PGD-005.
The inspector noted that very little safety-related'tainless..
steel piping has been worked at. the site.
.The licensee indicated
that they would look further into the matter to determine whether safety related work is involved.
The inspector stated that the
'bove would be an unresolved item and identified 400/80-27-03, 401, 402, 403/80-25-03:
"Unauthorized Marking Materials Used on Stainless Steel".
b.
Observation of Welding Activities The inspector observed in-process welding activities of safety-related piping field welds as described below to determine whether applicable
code and procedure requirements were being met.
(1)
Welding The below listed welds were examined in process to determine whether work was conducted in accordance with travelers;. welder identification and-location; welding procedure; WPS assignment welding technique and sequence; materials identify; weld geometry; fit-up; temporary attachments; gas purging; preheat; electrical characteristics; shielding gas; welding equipment condition; interpass temperature; interpass cleaning; process control systems;. identity of welders; qualification of inspection person-nel; and weld history records.
Joint No.
SW-99" FW61'4 SW-62"FW289A SW-151-FW536 SW-168-SW1
. Uni,t.
1'
2-Size 1s~ll 1'4II
] 2lli 8ll Stage of Fabrication Tack Welding Out Welding Out Fit-up to Welding Out
~Sstem.
Service Water Service Water Service Water Service Water (2)
Wel'd Heat-'reatment The. inspector reviewed the. CP5L program for weld heat treatment for compliance with QA procedure and Code requirements.
The welds listed in paragraph 6b(1)
were examined in process relative to weld joint preheating to determine; procedures available; proce-dures specify acceptable.
preheating method; procedures provide monitoring and.recording requirements and procedure compliance.
(3)
Welding Qualification The inspector reviewed the CP&L program for qualification of welders and welding operators for compliance with QA procedures and ASME Code requirements.
Welder Qualification is controlled by CPKL Procedure MP-02, Rev. 6,
"Qualification of Welders and Welding Operators".
(a)
The following welder qualification status records and
"Records of Performance gualification Test." were reviewed
-'elative to the. weld. joint listed in'Paragraph 6b(l).
W~ld Unit
'A74
"=-=
-
'
C-.56'.
B-.10-
.
C'"53 -
(b)
The inspector observed 'in process performance, qual ificati on testing. for the below listed Welders:.
Welder I.D. No.
ualification Test 66 -456',
SB4'6
" 1497'
'
,
SB2.
32 " 591
,
,
1A2.
'c)..., The inspector-examined side. bend specimens from qualification.
test assemblies for the. below listed welders.
Welder ID'o.
II E
66;-'489
.--
32',
590; w
Wi'th regard-to the above inspection
. the inspector noted following:.
I'--. The bend specimens of paragraph 6b(3)(c)
above varied
,. from. 0.262.".'o 0.363"'hick.,
As referenced by CP5L Procedure MP-02,. ASMEection IX, (figure gW 462.2(a))
.and AWS Dl. 1 (figure 5. 10.3j) both specify that side
- bend speciments.shall be 3/8" thick.
2.'he Li'censee. stated that they had no procedural require-
. ment'for bend specimen-thickness tolerence.
3),
The: bend 'specimens of paragrapgh 6b(3)(c)
were not marked. so it could not be determined which specimens
- went with which welder.
MP-02 does not required bend
'pecimens to be marked'.,
The above condition caused, a
loss of control of specimen identity.
MP-02 requires qualificati'on test assemblies to be marked with welder identification upon completion of welding. 'ailure to mark quali.fication test assemblies
with welder identification and position of the test assembly prior to the commencement of welding, could result in loss of control of.the welder taking the test and the position in which the test was administered.
Therefore, procedure MP-02 is inadequate in that it does not provide effective 'control of bend specimen thick-ness, bend specimen identity, and welder qualification test assembly identity.
Failure to prescribe activities affecting quality by documented procedures or instructions is in violation of 10CFR50, Appendix B Criterion V.
The inspector stated that the above violation would be identified 400/80-27-02, 401, 402, 403/80-25-02:
"Inadequate Procedure for Welder gualification".
(4)
The inspector reviewed the CP8L program for control of welding materials to determine whether materials are being purchased, accepted, stored and handled in accordance with gA procedures and applicable code requirements.
The following specific areas were examined:
Purchasing, receiving, storing, distributing and hand-ling, procedures; material identification; and inspection of welding material issuing stations.
Welding material purchasing and receiving records for the foll'owing materials were reviewed for conformance with applicable procedures and code requirements:
Process*
~Te 'ize Heat SMAW SMAW GTAW 7018 7018 70S6.
1/8"'/32" 3/32" 61493 4221C4761.
661C107
"SMAW - Shielded Metal Arc Welding GTAW Gas Tungsten Arc Welding Within the areas.
examined,,
no violations-or deviations except described in Paragraph 6b(3)(c). were identified.
7..
Licensee Identified Items Prior to the inspection, the licensee identified the following items under 10. CFR 50.55(e)."
(Open) Item'400/80-27-04'.
"Defective*Welds on Tornado Protection Dampers"
Eleven out of eleven tornado protection dampers to 'be used in the ventila-tion. system for the reactor auxiliary building were received on site with defective welds.
The units were fabricated by equality Air Design, Cincinnati, Ohio.
This matter will be examined during subsequent inspec-tions;