IR 05000400/1980014
| ML18017B192 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/08/1980 |
| From: | Conlon T, Gibbons T, Merriweather N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML18017B190 | List: |
| References | |
| 50-400-80-14, 50-401-80-12, 50-402-80-12, 50-403-80-12, NUDOCS 8008050120 | |
| Download: ML18017B192 (8) | |
Text
~S RE0y
Cy
D$
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Report Nos. 50-400/80-14, 50-401/80-12, 50-402/80-12 and 50-403/80-12 Licensee:
Carolina Power and Light Company 411 Fayetteville Street Raleigh, NC 27602 Facility Name:
Shearon Harris Nuclear Plant Docket Nos. 50-400, 50-401, 50-402 and 50-403 License Nos.
CPPR-158, CPPR-159, CPPR-160, and CPPR-161 Inspection at Harris site near Raleigh, North Carolina Inspectors:
T.
.
ibbons Da e
igned
. Merriweather Approved by:
. E.
onion, Section ie
,
RCES Branch D te igned
fv ate Signed SUGARY Inspection on June 9-13, 1980 Areas Inspected This resident, announced inspection involved 64 inspector-hours on site in the areas of Containment (Structural Concrete), Electrical raceway, Fire Prevention/
Protection, and Electrical procedures.
Results Of the areas inspected, no items of noncompliance or deviations were identified.
8 00805 0 IP-Q
DETAII,S Persons Contacted Licensee Employees-P.
W.
""S. D.
""R. M.
"'N. J.
-G. L.
'"A. M.
'"G. M.
"'A. B.
"L. I.
Howe, Vice President (VP), Technical Services Division Smith, VP, Construction Parsons, Site Manager Chiangi, Engineering and Construction QA Manager Forehand, Principal, QA Specialist Iucas, Senior Resident Engineer Simpson, Principal Construction Specialist - Insp.
Cutter, Manager, Nuclear Power Plant Engineering Loflin, Manager, Harris Plant Engineering Section Other Organizations
>'W. D.
Goodman, Project Manager, Daniel Construction Company
"Attended exit interview
'.
Exit Interview The inspection scope and findings were summarized on June 13, 1980 with those persons indicated in Paragraph 1 above.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort The inspector performed a tour of general plant areas and observed the installation of cable raceway and raceway supports; part of concrete placement 1WPXWP278001A; level B
storage and care of safety-related electrical switchgear, motor and motor control centers; and work activities in progress at the west damn, main dam, service water structure, containment structure and auxiliary buildings.
The inspector selected the following Quality Control Instructions (QCI), Quality Assurance Procedures (CQA),
Quality Control Procedures (WP)
and Quality Assurance Instructions (QAI)
for review:
QCI - 13.1, Concrete Compressive Strength Testing CQA - 1, Personnel Training and Qualification CQA - 6, Concrete Monitoring
CQA - 7, Fire Protection Monitoring CQA - 13, Electrical Equipment Installation Monitoring CQA - 1, Tool and Measuring Device Control CQA - 6, Receiving Inspection CQC - 13, Concrete Control TP - 15, Concrete Placement Inspection TP - 17, Construction Inspection Non-Conformance Control TP-40, Training and Qualification of Construction Inspection Personnel TP
-, 42, Inspection of Safety-Related or Seismically Installed Electrical Raceways and Components QAI " 12, Personnel Qualifications Requirements for Non-Special Process QA/QC activities QAI - 13.1, Electrical Installation Monitoring Guide for Rigid and Flexible Conduit QAI - 13.2, Electrical Installation Monitoring Guide Electrical Duct.
QAI - 13.3, Electrical Installation Monitoring Guide for Setting Electrical Equipment QAI - 13.4, Electrical Installation Monitoring Guide for Electrical Cable Tray Within the areas examined, there were no items of noncompliance identified.
Containment (Structural Concrete) - Observation of Work and Work Activities The inspector observed concrete placement 1CBXW336001 to assure that the requirements of the PSAR and QAH were being complied with in the areas of form installation, batch plant operation, site concrete testing, delivery and placement.
The inspectors examined the forms for proper placement, leak tightness and cleanness.
The batch plant was inspected for material control, temperature control, generation and control of batch records, inspection, testing, moisture control and mix design.
The concrete testing laboratory was inspected to assure that concrete cylinders were properly received, marked, cured and tested in accordance with procedural require-ments by qualified personnel and that test equipment was calibrated.
The inspectors also observed the preplacement inspection, construction joints, mix specified and delivered, duration of concrete mixing, observed the meter counts of the agitating trucks, piping material for pumping concrete, temperature control, slump test, air test, test frequency, acceptance criteria, adequacy of crew, equipment, techniques of inspection and qualification of inspection personnel.
Within the areas examined, there were no items of noncompliance identified.
Fire Prevention/Protection
- Observation of Work and Work Activities The inspectors attended a fire brigade training session.
The instructor was a state qualified firefighter and a former captain in a city fire department.
The instructor conducted a turn-out drill and loading of equipment in the van.
The instructor observed and timed the drill to assure that the proper equipment was loaded, the turn-out gear was properly worn and that the air-packs were properly utilized.
After. the drill the air-pack masks were cleaned and the tank pressure checked. It was identified that there is a fire brigade on each shift and weekly training on each shift.
During the plant walk-through inspections the inspectors verified that fire suppression equipment was available at the designated locations, in apparent good condition, accessable, and that inspections are current.
The inspector observed a cleaning operation using solvents for cleaning.
The solvent was in an approved container, the area roped off, no smoking signs, fire extinguishers and a fire watch was available.
Metal fire retardant cabinets were used to store flammables within specially designated areas in the plant.
Within the areas examined, there were no items of noncompliance identifie 'lg