ML18017B191

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/80-14,50-401/80-12, 50-402/80-12 & 50-403/80-12 on 800609-13.No Noncompliance Noted
ML18017B191
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 07/09/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017B190 List:
References
NUDOCS 8008050111
Download: ML18017B191 (4)


See also: IR 05000400/1980014

Text

'(

P~

~8 AEay

+4

~o

o0

+w*e+

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUL 09 Isso

In Reply Refer To:

RII:TDG

50-400/80-14

50"401/80-12

50-402/80-12

50;,403/80-12

Carolina Power and Light Company

ATTN

J. A. Jones

Senior Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

This refers

to the

inspection

conducted

by T.

D.

Gibbons of this office on

June

9 through 13,

1980 of activities authorized

by NRC Construction Permit Nos.

CPPR-158,

CPPR-159,

CPPR-160,

and

CPPR-161 for the Shearon Harris facility, and

to the discussion of our findings held with Mr. Howe and Mr. Smith at the conclu-

sion of the inspection.

Areas

examined

during

the inspection

and

our findings

are

discussed

in the

enclosed

inspection

re'port.

Within these

areas,

the inspection

consisted

of

selective

examieations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title

l0, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information

from public disclosure.

Any such application

must

include

a full statement of the reasons

on the basis of which it is claimed that.

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained

in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

)

/

Ig

Carolina Power and Light Company

JUL 09fsso

Sh'ould you have any questions

concerning this letter,

we will be, glad to discuss

them with you.

Sincerely,

C. E. Murphy,

ie

Reactor Construction

and Engineering

Support Branch

En'closure:

Inspection Report Nos. 50-400/80-14,

50-401/80-12,

50-402/80-12,

and 50-403/80-12

cc w/encl:

R. Parsons,

Site Manager