Exam Rept 50-395/93-31 on 931119.Exam Results:Operators Passed Exams
ML20058P510
Person / Time
Site: Summer 
Issue date: 11/30/1993
From: Baldwin R, Lawyer L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20058P496 List:
References
50-395-93-31, NUDOCS 9312270165
Download: ML20058P510 (3)


Text

p y.

.

UNITED STATES L

fp nacq4 NUCLEAR REGULATORY COMMISSION

'

-

,

p*,)3([4, o

REGloN ll l

-

..

S 101 MARIETTA STREET, N.W., SUITE 2900

,.

-3 49

- 'N E

ATLANTA, GEORGIA 30323-0199

- s Q % }t

-- g ss4je

I

!

Report No.: 50-395/93-301 Licensee: South Carolina Electric & Gas Company

Columbia, S*,

29218

!

Docket No.: 50-395 License No.:

NPF-12

!

Facility Name:

V. C. Summer Nuclear Station

,

Examination Conducted: November 19, 1993

"'

Chief Examiner:

'

Richard S. Baldwin Date Signed

%O l

Approved By:

Y Lawrence L. Lawyer, Chief Date Signed i

Operator Licensing Section 1'

Operations Branch Division of Reactor Safety

,

SUMMARY

.

Scope:

An NRC examiner conducted regular, announced operator licensing requalification retake examinations on November 19, 1993. The

!

examiner administered examinations under the guidelines of the Examiner Standards (ES), NUREG-1021, Revision 7.

Two Senior

Reactor Operators (SR0s) received a walk-through' examination.

l Results:

Operator Pass / Fail:

SR0 R0 Total Percent Crews Percent

Pass

0

100%

N/A N/A Fail

0

0%

N/A N/A

-

There was no requalification program evaluation made due to the small sample

'

size of operators.

  • No violations or deviations were identified.

)

.

9312270165 931203 PDR ADOCK 05000395 i

V pyg I

-

.,

..

.

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • K. Woodward, Manager, Nuclear Training
  • T. Matloz, Supervisor, Operator Training j

R. Quick, Senior Instructor Other licensee employees contacted included instructors, engineers, technicians, operators, and office personnel.

NRC Personnel i

  • R. Baldwin, Examiner
  • Attended exit interview 2.

Discussion a.

Scope l

An NRC examiner conducted regular, announced operator licensing

requalification retake examinations on November 19, 1993. The-examiners administered examinations under the guidelines of the j

Examiner Standards (ES), NUREG-1021, Revision 7.

Two Senior Reactor

Operators (SR0s) received a walk-through examination.

b.

Results

Both operators passed the examinations. There was no requalification

~

program evaluation made due to the ; mall sample size of operators.

c.

Proposed Examinations The propo:ad examinations met the guidelines of NUREG-1021,

.

'l Revision 7.

The licensee proposed Job Performance Measures (JPMs)

that were vritten at a level consistent with NRC requirements. These JPMs provided valid testing of an operator's ability to demonstrate

'

kruiedge of plant systems and procedures. The NRC revised one JPM in order to accomplish the task using an alternate path. The proposed i

JPMs delineated some steps as critical that had.no measurable

performance standard. These steps required only verification of an

.,

indication without a measurable action. The examination team modified'

'

these steps to noncritical.

j d.

Administration

-]

During the performance of the in-plant JPMs, the plant-experienced a problem in the reactor trip breakers. The NRC modified the examination to delete a reactor trip breaker JPM and to substitute an-

additional simulator JPM for one of the operators.

i

,

, - -. - _. -

,

,.

.

l

.

l-Report Details-

L.

'

3.

Exit Interview At the conclusion of the site visit, the examiners met with representa-tives of the plant staff listed in paragraph 1 to discuss the results of the examinations. The licensee did not. identify as proprietary any material.provided to, or reviewed by the examiners. Dissenting comments-

were not received from the licensee.

,

.i

+.

.,

,

1l'

i i

..

l I

i l

$

l

..

l l

l

.-