Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/97-04 & NOV
ML20141D261
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/23/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
50-382-97-04, 50-382-97-4, NUDOCS 9706270064
Download: ML20141D261 (4)


Text

.. _ _ _ _ _ . _ . . _ _ _ _

_ __ _ __ _ _ _ _ . _ _ . _ _ _ . _ . . . _ . _ _ _ _ _ _

a *

"%g UNITED STATES

-

3- t, NUCLEAR REGULATORY COMMISSION

REoloN iv 611 RYAN PLAZA drive. SulTE 400

'g+9

'"**

  1. [ AR LINGToN, TEXAS 76011-8064 JUN 2 31997 Charles M. Dugger, Vice President Operations - Waterford 3 Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066

3 SUBJECT: NRC INSPECTION REPORT 50-382/50-382/97-04

Dear Mr. Dugger:

!

r Thank you for your letter of June 4,1997, in response to our letter and Notice of l

i Violation dated May 5,1997. We have reviewed your reply and determined that your

letter specified that your interim corrective action had restored compliance to requirements.  ;

However, you did not provide a date, as required by 10 CFR 2.201(a)(3), by which full  !

.

compliance will be achieved. As discussed with Mr. Early Ewing of your staff, we understand that a supplemental response will be forthcoming to specify the required j completion dates.

Sincerely, L ^

JM Thomas P. Gwynn, ir tor Division of Reactor Pr jects Docket No.: 50-382 License No.: NPF-38 cc:

Executive Vice President and Chief Operating Officer {

Entergy Operations. Inc.

P.O. Box 31995 (

Jackson, Mississippi 39286-1995

! !!!!h!!,!!!!!!,l!!!f!!! !!!

9706270064 970623 PDR ADOCK 05000302 G PDR

,

A

. _ _ _ __ .. __ _ _ _ _ _ . _ _ . _ _ _ _ - . . _ . _ , _ _ _ _ - _

. .

Erstergy Operations, Inc. -2-Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 .

Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 Manager - Licensing Manager Waterford 3 SES Entergy Opera @ns, Inc.

P.O. Box B Killona, Louisiana 70066 i

Chairman l Louisiana Public Service Commission  !

One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Director, Nuclear Safety &

Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 William H. Spell, Administrator i Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President  !

St. Charles Parish l P.O. Box 302 l Hahnville, Louisiana 70057 I

. = _ .. . . . . . - . . _ - . .. ---__ . ~ . . = . . . - - - . , _ _ . . . . .

.I 2;

. .

'

i

.' Entergy' Operations, Inc. -3-i Mr. William A. Cross

Bethesda Licensing Office

3 Metro Center i Sulte 610

'

Bethesda, Maryland 20814

'. Winston & Strawn

' "

1400 L Street, N.W.

Washington, D.C. 20005-3502 i

!

!

i I

4

}

l

!

1

5 I

.

_ .. . . ._ _ . _ _ . _ - . . _. . ~__.__._ _. _ . . . , _ . - . __

. -

Entergy Operations, Inc. 4- M 2 319J/

.

j-bec to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator Resident Inspector i DRP Director DRS-PSB

'

Branch Chief (DRP/D) MIS System Project Enginen (DW/D) RIV File Branch Chief (DRP/TSS)

'

I l

l I

DOCUMENT NAME: R:\_WAT\WT704AK.LAK To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" e Copy with enclosures "N" = No copy RIV:PE:DRP/D , C:DRP/D, n D:DRP iJ l GAPick;df @' PHHarre% TPGwynn (/)*'7 '

6po/97 6pp/97 N 6/J7/97 OFFICIAL RECORD COPY

. . - _ .. - . . . .._._. _ _._- .- - .- . . _ . . . _ . _ . - . . . . .-

,

l t *

i

'

Entergy Operations, Inc. 4- JUN 2 31997 I

l l

.

l 1bec to DCD (IE01) I

! bec distrib. by RIV- l Regional Administrator Resident inspector  !

DRP Director DRS-PSB l Branch Chief (DRP/D) MIS System  ;

Project Engineer (DRP/D) RIV File . i Branch Chief (DRP/TSS) i l

i

,

)

l l

l l

l l

l l

l

DOCUMENT NAME: R:\_WAT\WT704AK.LAK To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/D , C:DRP/D, . 7 D:DRP l rJ l l GAPick;df @' PHHarre% TPGwynn ([/$'J'

'

6pc/97 6pp/97 V 6/f7/97 l OFFIC.AL RECORD COPY l

!

l

_ _ _ _ _ _ _ _ . _ _ _

-

. . . . - . . - ,

. . . .~ . . . ~ , . . - _ . - ..- _ _ . - .~ .~ ~ . _ . ~ - , ..~-.-. .~..~ .-

'

..

y Enti gy Operati1ltne. Inc.

l Kiifora LA 70066 l. TM 504 7396242 Early C. Ewing. ill i c ea Sa'ety & Reqfavy A%rs AaMord 3 l

W3F1-97-0125

. l

.c' _' ". ' ., A4.05

)

/ . , PR

.

,

Say ,

June 4,1997 .n \

j N

/

,

'%

%

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 i

Subject: Waterford 3 SES Docket No. 50-382 i License No. NPF-38 NRC Inspection Report 97-04 Reply to Notice of Violation Gentlemen: ,

!

In accordance with 10CFR2.201, Entergy Operations, Inc. hereby responds to the notice of violation enclosed in the subject inspection Report.

According to the notice of violation, our response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required -

response. Licensee Event Reports (LERs) 97-012-01,97-010-00 and 97-001-00

. meet that criterion. LER 97-012-01 adequately addresses violation 9704-01. LER 97-010-00 adequately addresses violation 9704-02 and LER 97-001-00 adequately

.

addresses violation 9704-06. Attached for your review are LERs 97-012-01, 97-001-C and 97-010-00.

The first violation, 9704-01, concerns a failure to comply with the Technical Specification requirements for the use of overtime. The requirements of the

- Technical Specification and the working hour policy have been reemphasized to management and supe: 'sory personnel. In addition, the working hour procedure will be revised to clarify requirements. Detailed corrective actions are included in LER 97-012-01.

.

The second violation,9704-02, concerns a failure to recognize that Shield Building Ventilation (SBV) Train B failed its Technical Specification surveillance for maximum air flow. Also, the surveillance review process allowed the surveillance failure to go

_ct? c>c n Omc y f 7- /Ay0

_ _. . . _

. - - - - _.. . . . . . _ . - . . . . . - - _ - . . - . - --. -.- . .-_.._-

,

4 . - . I il Reply to Notice of Violation (IR 97-04)

j W3F1-97-0125 t Page 2 June 4,1997 4:

undetected greater than the Technical Specification allowed outage time. The SBV .

L flow rate was adjusted to be within Technical Specification range and the  !

! surveillance test was re-performed. Detailed corrective actions are included in LER l - 97-010-00.

l The third violation, 9704-06, concerns inadequate 10 CFR 50.59 evaluations which

resulted in crediting an EFW Flow Control Valve for containment isolation, without j having position indication as required by RG 1.97. An instance was identified which

exceeded the allowed outage time of TS 3.3.3.6 " Accident Mooitoring

{ Instrumentation", resulting in a violation of the TS. The Technical Requirements i~ Manual and the Final Safety Analysis Report were revised to address this issue.

l

,

Detailed corrective actions are included in LER 97-001-00.

k'

[' -

Waterford 3 is currently in full compliance with the requirements referenced in each violation.

i . .

Should you have any questions regarding this response, please contact me at (504)
- 739-6242 or Tim Gaudet at (504) 739-6666.

l - Very truly yours,

-

i, l .

~

i

E. . Ewing Director, j Nuclear Safety & Regulatory Affairs

ECBGCShjs 1 Attachments t

'

(w/ Attachments)

cc: E.W. Merschoff (NRC Region IV)

C.P. Patel (NRC-NRR).

') (w/o Attachments)

. J. Smith i N.S. Reynolds

NRC Resident inspectors Office

.

I y 7- - . 9- - - - -

-.n-. e -, . __ -

r. -, m . .-.,, .c-.-4 % -.+ .