Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/96-14
ML20147G603
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/24/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9703280205
Download: ML20147G603 (4)


Text

{{#Wiki_filter:. k p* '8 G UNITED STATES

* %,It f. .,  NUCLEAR REGULATORY COMMISSION h  $   REGloN IV
*k t S f6   611 RYAN PLAZA DRIVE. SUITE 400
%, ' 0'f  AR LINGToN. T EMAS 760118064
*"**

MAR 241997 I i

       ,

Charles M. Dugger, Vice President Operations - Waterford 3 Entergy Operations, In ! P.O. Box B Killona, Louisiana 70066 SUBJECT: NRC INSPECTION REPORT 50-382/96-14 Thank you for your letter of March 10,1997, in response to our letter and Notice of Violation dated February 7,1997. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your

corrective actions during a future inspection to determine that full compliance has been j achieved and will be maintaine

Sincerely, N Thomas P. Gwy , Dir tor Division of Rea or Pr jects Docket No.: 50-382 License No.: NPF-38 i cc: Executive Vice President and Chief Operating Officer Entergy Operations, In P.O. Box 31995 Jackson, Mississippi 39286-1995 I f

      ' h(
      '

Vice President, Operations Support Entergy Operations, In P.O. Box 31995 Jackson, Mississippi 39286-1995

     [[

. 9703280205 970324

^o " '

- So" 8J* _ mapsppp.RPP5

F

.
:
.

Entergy Operations, In Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

I P.O. Box B ! Killona, Louisiana 70066-Manager - Licensing Manager Waterford 3 SES Entergy Operations, In P.O. Box B Killona, Louisiana 70066

   '

[ l Chairman l Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Director, Nuclear Safety & Regulatory Affairs Waterford 3 SES Entergy Operations, In P.O. Box B Killona, Louisiana 70066 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana - 70884-2135 t l Parish President l St. Charles Parish P.O. Box 302 ' Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814

  ,

.

Entergy Operations, In Winston & Strawn 1400 L Street, Washington, D.C. 20005-3502 l

 - _

I

.
        )

l . Entergy Operations, In MAR 2 41997 bec to DCD (IE45) bec distrib, by RIV: Regional Administrator Resident inspector DRP Director DRS-PSB 1 Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) l

        ,

l l l

        ;

l

        )
        !

I DOCUMENT NAME: R:\ WAT\WT614AK.LAK l To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy I PE:D,RP)@ C:DRP/D ,Q D:DRP y l GE @ hg) tare PHHar$p W TPGwynn (/Q' l 03/)t /97 03/t) / 03/gf/97 l

   \ OFFICIAL RECORD COPY    l
        )

l

       ,

l

       !

Entergy Operations, In MAR 2 41997 bec to DCDM bec distrib. by RIV: Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS)

'OCUMENT NAME: R:\_WAT\WT614AK.LAK To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:D,RPjqq  C:DRP/D ,Q D:DRP A/

GE@W PHHa4pW TPGwynn Q' 03/)l /97 03/p / 03/2 7/97

  \ OFFICIAL RECORD COPY

- -

 - . --  .  . ..

r , b_ Ent:rgy

-

eege-a .iac.

- Operations [@ n

. i P

y

   .

n .

     W3F1-97-0039 N49 j Ig
   ,
 (   e A4.05
    '/  PR March 10,1997   N
    .

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 l Subject: Waterford 3 SES Docket No. 50-382 j

      '

License No. NPF-38 NRC Inspection Report 96-14 Reply to Notice of Violation Gentlemen: In accordance with 10CFR2.201, Entergy Operations, Inc. hereby submits in l Attachment 1 the response to the violations identified in Enclosure 1 of the subject I Inspection Repor ; I Waterford 3 acknowledges the two concerns expressed in the cover letter to the inspection report: (1) the inadequate procedure for the calibration of the hydrogen analyzers indicates a lack of rigor during the development of the procedure in that a number of vendor recommended tests were not followed, and (2) failure to follow procedures regarding reporting of security lighting deficiencies indicates a continuing l problem with procedural compliance among station personne , Regarding the first concern, Waterford 3 has an initiative in place to improve plant procedures. The purpose of this initiative is to enhance the procedure processes and content to support safe and reliable plant operations at Waterford 3. A multi-discipline procedure quality action team has been developed as an initial step in this proces Regarding the second concern, Waterford 3 continues to take comprehensive corrective actions to address this matter. The comprehensive corrective actions are

V k gyo~ , 9F oTts

'
:

l .,' Reply to Notice of Violation (IR 96-14) W3F1-97-0039

     {

Page 2  ! March 10,1997- I detailed in letter W3F1-96-0213 dated December 13,1996. As part of the corrective actions committed to in that letter, Waterford has been reemphasizing procedural _ adherence and self-checking techniques in plant safety and "All Hands" meeting Actions taken to date, in concert with the corrective actions delineated in the attached response, will help prevent similar occurrences, if you have any questions concerning this response, please contact me at (504) 739-6666 or Jeff Thomas at (504) 739-653 Very truly yours, j r m GM T.J. Gaudet Acting - Director , Nuclear Safety & Regulatory Affairs I TJG/GCS/tjs Attachment cc: L.J.' Callan (NRC Region IV), C.P. Patel (NRC-NRR), . R.B. McGehee, N.S. Reynolds, NRC Resident inspectors Office I i

     !

I i

F ,,

.

Attachment to

:

W3F1-97-0039 Page 1 of 5 ATTACHMENT 1 ENTERGY OPERATIONS, INC. RESPONSE TO THE VIOLATION IDENTIFIED IN ENCLOSURE 1 OF INSPECTION REPORT 96-14 VIOLATION NO. 50-382/9614-02 Technical Specification 6.8.1.a states, in part, that written procedures shall be maintained covering surveillance and test activities of safety-related equipmen Contrary to the above, procedures were not maintained covering surveillance activities of safety-related equipment in that Procedure Ml-003-431, " Containment Hydrogen Analyzer Functional Test and Calibration," did not provide adequate instructions for the testing of the hydrogen analyzer This is a Severity Level IV violation (Supplement I) 50-382/9614-0 RESPONSE (1) Reason for the Violation Entergy believes that the root cause of this violation is a lack of rigor and a questioning attitude in the development and review of Ml-003-431,

" Containment Hydrogen Analyzer Functional Test and Calibration HRAIA3800 A or B." During the development of Mi-003-431, adjusting flow instruments
      !

prior to recording "as found" values was not considered preconditioning of l equipmen l Inspection Report 96-14 stated that Waterford 3 did not implement vendor recommended testing. It should be noted that, while we agree we were not verifying all operating parameters described by the vendor, the manual states that the subject testing is "neither necessary nor desirable to be performed on

. a routine basis." Waterford 3 performed flow testing on the analyzers and while slight adjustment of the flows has been shown to not have a significant effect on sampling capability, we believe performance of the periodic testing ;

described in the vendor manual is pruden (2) Corrective Steps That Have Been Taken and the Results Achieved The current revision of procedure Ml-003-431 was approved on April 17, 1992. Since that time Waterford 3 management has emphasized the expectations of having a self-critical and questioning attitude along with

     - _ .I

_ _ _ _ . . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ ._ _._ N Attachm:nt to W3F1-97-0039

a Paga 2 of 5

,. . l developing a " defense-in-depth" barrier mentality. All-hands and departmental , {

meetings were conducted to emphasize these expectation ' ! ' ' Testing was performed to determine if the flow and pressure were set at the vendor recommended values. The following results were achieved:

4 , j . Flow and pressure setpoints on the Hydrogen Analyzers were set to  :

recommended values in the vendor manua i

l . Sample flow rate was varied while monitoring sample response time, i

         '

l return flow rate back to containment, and the hydrogen concentration of ! the sample. Results showed that changing the sample flow rate had little { or no effect on these parameters.

, . Procedure Mi-003-431, was performed satisfactorily as a retes : ! ] . (3) Corrective Steps Which Will Be Taken to Avoid Further Violations I > 1. This event will be discussed with I&C personnel at departmental meetings.

i Emphasis will be placed on Waterford 3 guidelines for procedure  ; i improvements. Also emphasized will be the need to scrutinize I&C l l procedures for possible preconditioning of equipment prior to testin e

         .

f 2. All three maintenance disciplines at Waterford 3 will review their respective i survWilance procedures to ensure potential preconditioning instructions do j not exist.

! l 3. Procedure Mi-003-431, " Containment Hydrogen Analyzer Functional Test l and Calibration HRAIA3800 A or B," wil! be revised as follows:  ! ! . "As found" flow and pressure data will be taken before purging the ! ! analyzer. An acceptance range will be used to determine if  :

corrective actions are warranted. This range will not be used as

, acceptance criteria for the calibration procedure. It will be solely a j mechanism for " fine tuning" the analyzer flow and pressure as l necessary.

I . The "as found" data will be recorded and used for trending j purpose , j '

   . There will be no flow or pressure adjustments prior to recording "as found" data. This will eliminate the potential for preconditioning during the calibration procedure,

} j 4. A task will be generated for each analyzer periodically test the solenoid ! valves inside the control panel. This test will ensure proper operation of

[    the solenoid valves in both the open and closed directio . The solenoid valves will be de-energized and connected to a test l     panel from which each valve can be powered individually.

I 1

..    . _ _ .  . -__,

j

__ . . _ . . _ _ _ _ _ . _ . _ _ _ _ _ . . . . . . _ _ . _ . _ . _ _ . _.._.._..___....m ._

.

Atttchm:nt to

W3F1-97-0039

;j         Page 3 of 5

l . Each solenoid valve will be energized and de-energized separately I

;
'    from the test panel with the analyzer in different configurations to ensure each valve operates properly in both the open and closed

] direction ! 5. A task has been generated to periodically perform pressure and flow tests j of each analyzer in accordance with the vendor manual. This test will ensure that pressure regulators are set properly and flows are adjusted

correctly.
(4) Date When Full Compliance Will Be Achieved i -

i Tasks have been generated to periodically perform pressure and flow testing of the analyzers. Revisions to Mi-003-431 and the generation of periodic tasks to perform solenoid valve testing will be completed by April 11,1997 at . which time Waterford 3 will be in full compliance.

i i

a 't I ! l, I

)
         )

i

         !
        .

_ _ _ _ _ _ _ __ _ _ _ ._ _ _ . _ ..__ _

--

Attachment to W3F1-97-0039 ,

      '
!      Page 4 of 5 ATTACHMENT 1
*

ENTERGY OPERATIONS, INC. RESPONSE TO THE VIOLATION IDENTIFIED IN l ENCLOSURE 1 OF INSPECTION REPORT 96-14 ' VIOLATION NO. 9614-04 ) Technical Specification 6.8.1.a requires, in part, that written procedures shall be implemented covering applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Appendix A, Sections 1 and 9, require that the licensee have administrative and ma'intenance procedure Administrative Procedure PS-012-102, " Protective Lighting," Revision 6, Section 5.3.2, required, in part, that in the event of a protective lighting system deficiency or failure is observed when lighting is needed, the reporting officer will i immediately notify the central or secondary alarm statio Contrary to the above, on December 17,1996, a security patrol officer observed a protective lighting system deficiency when lighting was needed and did not immediately notify the central or secondary alarm statio This is a Severity Level IV violation (Supplement 1) 50-382/9614-04.

i l RESPONSE } (1) Reason for the Violation The reason for the violation is personnel error in that the security officer did ! not follow the requirements of administrative procedure PS-012-102. The ! security officer did not follow the procedure which states upon the discovery of l a temporary lighting deficiency, the Central Alarm Station (CAS) and the ! Secondary Alarm Station (SAS) will be notified. The officer made another

personnel error by failing to notify the shift supervisor of the lighting deficiency 1 as required by the procedure. The officer did, however, note the lighting j discrepancy on the security department patrol log and the security lighting
survey form.
(2) Corrective Steps That Have Been Taken and the Resulte Achieved  ;
      !

} l Corrective action document, Condition Report 96-1971 was generated to  ;

! address this concem. A memo was issued to all security personnel on  l

' ' , December 23,1996 stressing the requirement to adhere to plant procedures.

l In addition, the security officer and the supervisor were counseled.

'

  *

l

.

U ',

.

Attichmsnt to

,     W3F1-97-0039
,

Page 5 of 5 i

     !
     !
     !
     !
(3) Corrective Steps Which Will Be Taken to Avoid Further Violations Security is performing a review on their procedures in an effort to improve j procedure understanding and complianc lI I
(4) Date When Full Compliance Will Be Achieved Waterford 3 is in full compliance. The review of. the security procedures will be completed by 12/31/9 l