Text
April 28, 2020
SUBJECT:
MCGUIRE NUCLEAR STATION - INTEGRATED INSPECTION REPORT 05000369/2020001 AND 05000370/2020001
Dear Mr. Ray:
On March 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at McGuire Nuclear Station. On April 20, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Frank J. Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects
Docket Nos. 05000369 and 05000370 License Nos. NPF-17 and NPF-9
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000369 and 05000370
License Numbers:
Report Numbers:
05000369/2020001 and 05000370/2020001
Enterprise Identifier: I-2020-001-0076
Licensee:
Duke Energy Carolinas, LLC
Facility:
McGuire Nuclear Station
Location:
Huntersville, North Carolina
Inspection Dates:
January 01, 2020 to March 31, 2020
Inspectors:
G. Hutto, Senior Resident Inspector
B. Griman, Project Engineer
B. Collins, Senior Reactor Inspector
R. Kellner, Senior Health Physicist
M. Schwieg, Reactor Inspector
Approved By:
Frank J. Ehrhardt, Chief
Reactor Projects Branch 1
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at McGuire Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near 100 percent rated thermal power (RTP) for the entire inspection period.
Unit 2 began the inspection period at or near 100 percent RTP. On March 21, 2020, the unit was shutdown for a scheduled refueling outage and ended the inspection period in Mode
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. From January 1 - March 19, 2020, the inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; and observed risk significant activities when warranted. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In the cases where it was determined the objectives and requirements could not be performed remotely, management elected to postpone and reschedule the inspection to a later date.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather (tornado warning), on February 7, 2020.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1 "A" train containment spray system,on January 8, 2020
- (2) Unit 2 2A diesel generator, on January 28, 2020
- (3) Unit 1 diesel building ventilation system, on February 20, 2020
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 1 cable spreading room, on January 9, 2020
- (2) Unit 2 component cooling (KC) pumps and KC heat exchange area, on January 9, 2020 (3)1A 4160 essential switchgear room, on January 9, 2020
- (4) Unit 1 ETB switchgear room, on March 30, 2020
- (5) Unit 2 spent fuel pool cooling area, on March 30, 2020
71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)
The inspectors evaluated pressurized water reactor non-destructive testing by reviewing the following examinations from March 23 - 27, 2020:
(1)03.01.a - Nondestructive Examination and Welding Activities.
1. Ultrasonic Examination (UT)
a. 3" reactor coolant system tee-to-pipe weld (2NC2FW49-18), ASME Class 1 (reviewed)b. 6" service water system pipe-to-pipe weld (RN2F1495), ASME Class 3 (weld sample; reviewed)c. reactor vessel head penetration #35 weld, ASME Class 1 (reviewed)
2. Liquid Penetrant Examination (PT)
a. 6" service water system pipe-to-pipe weld (RN2F1495), ASME Class 3 (weld sample; reviewed)
3. Radiographic Testing (RT)
a. 6" service water system pipe-to-pipe weld (RN2F1495), ASME Class 3 (weld sample; reviewed)
The inspectors reviewed the licensee's boric acid corrosion control program performance.
The inspectors reviewed the licensee's justification for skip-cycle approach on steam generator ISI activities.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 shutdown for a refueling outage on March 21, 2020.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated active simulator exam ASE-17, which involved a loss of spent fuel pool cooling, followed by an inadvertent start of the turbine driven auxiliary feedwater pump, and a large break loss of cooling water accident, on February 12, 2020.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Nuclear Condition Report (NCR) 2312581, E instrument air compressor tripped approximately 24 seconds after start
- (2) McGuire Nuclear Station Maintenance Rule (a)(3) Assessment (August 1, 2019)
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed;
- (1) Equipment protection plan for the 1B charging pump out of service (OOS) for shaft alignment, on January 6, 2020
- (2) Equipment protection plan for the 2B containment spray (NS) pump OOS for motor electrical preventive maintenance (PM), on January 6, 2020
- (3) Elevated risk plan for 2A diesel generator maintenance activities, on January 20, 2020
- (4) Equipment protection plan for the E instrument air compressor OOS due to a starter failure, on January 27, 2020
- (5) Elevated risk plan for 1B diesel generator maintenance activities, on February 12, 2020
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (2) NCR 2314944, Standby nuclear service water pond temperature instrument failed, on February 19, 2020
- (3) NCR 2317410, Failed Unit 2 pressurizer heater, on February 24, 2020
- (4) NCR 2316299, Emergency diesel generator fuel pump - rust found in pump removed from 1B cylinder 3R, on March 3, 2020
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modification:
- (1) Engineering Change (EC) 411099, "Add Instrument Manifold to U1 CA Pump Suction Valve Auto-Swap Pressure"
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
- (1) PT/1/A/4350/002 B, "Diesel Generator 1B Operability Test," following fluid check, on January 7, 2020
- (2) PT/1/A/4208/001 B, "1B NS Pump Performance Test," following motor electrical PMs, on January 9, 2020
- (3) PT/2/A/4350/002 A, "Diesel Generator 2A Operability Test," following hot web deflection measurements, on January 21, 2020
- (4) PT/1/A/4350/002 B, "Diesel Generator 1B Operability Test," following fuel tank cleaning and inspections, on February 13, 2020
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)
- (1) The inspectors evaluated refueling outage M2R26 activities from March 20, 2020 to March 31, 2020.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) PT/1/A/4350/002 A, "Diesel Generator 1A Operability Test," on January 29, 2020
- (2) PT/2/A/4252/001 A, "2A CA Pump Performance Test," on January 31, 2020.
- (3) PT/2/A/4600/003 B, "Daily Surveillance Items," on March 5, 2020
- (4) PT/2/A/4206/015 A, "2A Safety Injection Pump Head Curve Performance Test and Acceptance Testing of Various NI Check Valves," on March 23, 2020
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) PT/2/A/4208/001 B, "2B NS Pump Performance Test," on January 8,
RADIATION SAFETY
71124.05 - Radiation Monitoring Instrumentation
Calibration and Testing Program (IP Section 03.02) (20 Samples)
The inspectors evaluated the calibration and testing of the following radiation detection instruments:
- (1) Canberra Model ARGOS-5PB, S/N 1112-210, EnRad ID#: 08002, 08/14/2018 and 08/12/2019
- (2) Canberra Model ARGOS-5PBZ, S/N 1112, EnRad ID#: 03813, 08/30/2018 and 02/13/2020
- (3) Canberra Model CRONOS-4 Small Article Monitor, S/N 1411-236-CR0400G, EnRad ID#: 12602, 06/18/2018 and 06/10/2019
- (4) Canberra Model CRONOS-4 Small Article Monitor, S/N 1411-239-CR0400G, EnRad ID#: 12754, 06/19/2018 and 06/10/2019
- (5) Canberra Model CRONOS-4 Small Article Monitor, S/N 1411-235, EnRad ID#: 12799, 08/30/2018 and 02/13/2020
- (6) Canberra Model GEM-5 Personnel Contamination Monitor, S/N 1905-106, EnRad ID#: 13289, 08/06/2019
- (7) Canberra Model GEM-5 Personnel Contamination Monitor, S/N 0605-051, EnRad ID#: 12352, 08/30/2018, 10/24/2018, and 10/23/2019
- (8) Canberra Model GEM-5 Personnel Contamination Monitor, S/N 0511-024, EnRad ID#: 12354, 04/24/2018, 10/25/2018, and 10/23/2019
- (9) Canberra Model iCAM Continuous Air Monitor, S/N 5661, EnRad ID#: 13201, 12/18/2018, 01/08/2020 and 02/24/2020
- (10) Ludlum Model 3 Frisker, S/N 235498, EnRad ID#: 02470, 08/17/2018, 10/16/2019 and 02/10/2020
- (11) Ludlum Model 3 Frisker, S/N 320494, EnRad ID#: 12879, 07/31/2019 and 02/10/2020
- (12) Ludlum Model 177 Frisker, S/N 312609, EnRad ID#: 13101, 09/28/2018, and 11/05/2019
- (13) Ludlum Model 177 Frisker, S/N 312622, EnRad ID#: 13105, 09/28/2018 and 11/05/2019
- (14) Ludlum Model 3030 Smear counter, S/N 323015, EnRad ID#: 07945, 09/21/2017 and 09/19/2019
- (15) Ludlum Model 9-3 Ion Chamber Dose Rate Meter, S/N 279891, EnRad ID#: 10235, 12/18/2017, 9/21/2018, and 07/22/2019
- (16) Mirion Model AMP-100 Underwater GM Probe, Serial Number (S/N) 5011-004, EnRad ID#: 13161, 11/12/2018 and 01/03/2020
- (17) Mirion Model AMP-100 Underwater GM Probe, Serial Number (S/N) 5004-049, EnRad ID#: 01756, 09/18/2018 and 01/03/2020
- (18) Mirion Model TelePole Telescoping GM Meter, S/N 6613-134, EnRad ID#: 12223, 02/08/2018 and 07/15/2019
- (19) Mirion Model TelePole Telescoping GM Meter, S/N 6613-1115, EnRad ID#: 12230, 09/18/2018 and 11/28/2018
- (20) Thermo-Eberline Model SAM-12 Small Article Monitor, S/N 169, EnRad ID#: 03606, 08/14/2018, 10/25/2018, and 10/23/2019
Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (5 Samples)
The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:
- (1) U-1 Containment High Range Radiation Monitor (CHRRM), 1EMF-51A, Work Order (WO) 20128618-01, 10/8/2017 and WO 20258151-01, 04/5/2019
- (2) U-1 Containment High Range Radiation Monitor (CHRRM), 1EMF-51B, WO
===20128648-01, 10/3/2017 and WO 20258016-01, 04/5/2019
- (3) Main Control Room Radiation Monitor, 1EMF-12, WO 02042783-01, 09/04/2013 and WO 20315513-01, 09/03/2019
- (4) Liquid Radioactive Waste Radiation Monitor, 0EMF-49L, WO 20101497-01, 08/17/2017 and WO 20309402-01, 08/02/2019
- (5) Unit Vent Hi Hi Range Radiation Monitor, 1EMF-36HH, WO 01928624-01, 08/24/2011 and WO 02141103-01, 05/06/201
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
- (1) Unit 1 (January 1, 2019 - December 31, 2019)
- (2) Unit 2 (January 1, 2019 - December 31, 2019)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)
- (1) Unit 1 (January 1, 2019 - December 31, 2019)
- (2) Unit 2 (January 1, 2019 - December 31, 2019)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)
- (1) Unit 1 (January 1, 2019 - December 31, 2019)
- (2) Unit 2 (January 1, 2019 - December 31, 2019)
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)10CFR21.21(b) Notification of Licensee to Perform Defect Determination Related to Various Eaton Relays (AR 2295456)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 20, 2020, the inspectors presented the integrated inspection results to Tom Ray and other members of the licensee staff.
- On March 27, 2020, the inspectors presented the ISI Exit Meeting inspection results to Tom Ray, Site Vice President and other members of the licensee staff.
- On March 31, 2020, the inspectors presented the RP Radiation Monitoring Instrumentation Inspection inspection results to Tom Ray, Site VP and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Drawings
MC-1579-01.00
Diesel Building Ventilation System (Unit 1)
MCFD-1563-01.00
Flow Diagram of Containment Spray System (Unit
1)
Procedures
OP/2/A/6350/002
Diesel Generator
Fire Plans
CSD-MNS-PFP-AB-0750-
001
Units 1 & 2 Auxiliary Building Elevation: 750
MFSD-009
1ETB - 733"
MFSD-015
1ETA - 750'
MFSD-019
Unit 1 - 750' aux cable room
Miscellaneous
MCS-1465.00-00-0008
Design Basis for Fire Protection
Procedures
AD-EG-ALL-1520
Transient Combustible Control
Calibration
Records
FlawTech Material Test Report: UT Calibration
Block Specimens
2016.10.15
Ray-Check Mfg. Inc. Certificate of Compliance: UT
Calibration Blocks (SN 16-4207 through -4226)
10/21/16
654414
Standards Laboratory Instrument Certification:
Thermometer, Infrared (ID MCNDE40127)
8/14/2018
Corrective Action
Documents
236874
Non-Active, Dry Boron Found During M2R25
Containment Walkdown
10/11/2018
2321617
M2R26 Mode 3 Walkdown Issues (Shutdown)
3/21/2020
Engineering
Evaluations
McGuire Unit 2 Steam Generator M2R26 Skipped
Inspection Cycle Outage Review
Miscellaneous
Duke Energy Certificate of Method Qualification: PT
II-N (Sanders)
8/14/2018
Duke Energy Visual Acuity Record (Sanders)
9-14-17
Magnaflux Certification: Ultragel II Couplant
04/14/2016
Magnaflux Certificate of Certification: Spotcheck
Developer SKD-S2
08/19/2015
Magnaflux Certification: Spotcheck Cleaner SKC-S
08/31/2016
Sonic Systems International, Inc. Certificate of
Qualification: UT II-PDI (Regan)
8/8/2018
Sonic Systems International, Inc. Vision Acuity
09/05/2018
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Record (Regan)
Duke Energy Certificate of Method Qualification: RT
II-N (Sherrill)
7/30/2018
Duke Energy Visual Acuity Record (Sherrill)
4-5-18
DEM_RN2F1495_20180912 Duke Energy Radiographic Technique Record
(RN2F1495)
9/12/2018
NDE Reports
180-9308218-000
McGuire, Unit 2 2R26 Reactor Vessel Closure
Head (RVCH) Penetration Ultrasonic Examination
000
30023
Duke Energy Liquid Penetration Examination
Report (RN2F1495)
9/6/2018
BOP-UT-18-002
Duke Energy UT Calibration/Examination Record
(RN2F1495)
9/15/2018
Procedures
AD-EG-PWR-1611
Boric Acid Corrosion Control Program -
Implementation
AD-MN-ALL-0006
Fluid Leak Management
MP/0/A/7700/080
Inspection, Assessment and Cleanup of Boric Acid
on Plant Materials
23
NDE-NE-ALL-4101
Liquid Penetrant Examination
001
NDE-NE-ALL-5101
Radiographic Examination
000
NDE-NE-ALL-6102
Utilization of PDI-UT-2 Generic Procedure for the
Ultrasonic Examination of Austenitic Pipe Welds
2
NDEMAN-NDE-640
NDE Procedures Manual - Volume 4 - Ultrasonic
Examination Using Longitudinal Wave and Shear
Wave, Straight Beam Techniques
PD-EG-PWR-1611
Boric Acid Corrosion Control Program
PT/0/A/4150/046
Containment Walkdown
005
71111.11Q Miscellaneous
Active Simulator Exam
ASE-17
Procedures
AD-EG-ALL-1209
System, Component and Program Health Reports
and Programs
AD-EG-ALL-1210
Self-
Assessments
291978
MNS Maintenance Rule (a)(3) Assessment
Procedures
AD-OP-ALL-0201
Protected Equipment
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AD-OP-ALL-0204
Plant Status Control
AD-WC-ALL-0204
On-line Risk Management Process
Procedures
AD-EG-ALL-1211
System Performance Monitoring and Trending
AD-OP-ALL-0102
Operability Decision Making
AD-OP-ALL-0105
Engineering
Changes
411099
Add Instrument Manifold to U1 CA Pump Suction
Valve Auto-Swap Pressure
10/21/2019
Procedures
IP/0/A/3002/009
Procedures
AD-EG-ALL-1155
Post Modification Testing
PT/1/A/4208/001 B
1B NS Pump Performance Test
PT/1/A/4350/002 B
Diesel Generator 1B Operability Test
PT/2/A/4350/002 A
Diesel Generator 2A Operability Test
Work Orders
20357073
1B DG Fluid Check
Miscellaneous
M2R26
McGuire M2R26 Refueling Outage Schedule
Procedures
AD-WC-ALL-0430
Outage Risk Review
OP/2/A/6100/003
Controlling Procedure for Unit Operation
OP/2/A/6100/SD-16
Preparing for NC System Drain
OP/2/A/6100/SD-20
Draining the NC System Level
Self-
Assessments
M2R26 Outage Risk Review
Procedures
AD-EG-ALL-1202
Preventive Maintenance and Surveillance Testing
Administration
AD-EG-ALL-1720
In-service Testing (IST) Program Implementation
PT/1/A/4350/002 A
Diesel Generator 1A Operability Test
PT/2/A/4206/015 A
2A Safety Injection Pump Head Curve Performance
Test and Acceptance Testing of Various NI Check
Valves
PT/2/A/4208/001 B
2B NS Pump Performance Test
PT/2/A/4252/001 A
2A CA Pump Performance Test
PT/2/A/4600/003 B
Daily Surveillance Items
April 2020
Calibration
Records
Serial Number 8241
Calibration Certificate, J.L. Shepherd & Associates
Model 89-400 Calibrator S/N 8241
08/19/1991
Serial Number 006
General Atomics Calibration Report, RT-11 High
11/08/1981
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Range Radiation Monitor Calibrator, Serial No. 006
Serial Number 59364-48
Analytics Certificate of Calibration, Cs-137 Source
S/N 59364-48
03/24/2000
Serial Number 59365-48
Analytics Certificate of Calibration, Cs-137 Source
S/N 59365-48
03/24/2000
Serial Number 59366-48
Analytics Certificate of Calibration, Ba-133 Source
S/N 59366-48
03/24/2000
Serial Number 59367A-48
Analytics Certificate of Calibration, Ba-133 Source
S/N 59367A-48
03/24/2000
Serial Number 8241
Verification of J.L. Shepherd & Associates Model
89-400 Calibrator S/N 8241, ENRAD # 01564,
Calibration Certificate
01/08/2020
Serial Number 8245
Calibration Certificate, J.L. Shepherd & Associates
Model 89-400 Calibrator, S/N 8245
04/10/2015
Corrective Action
Documents
AR02235596, AR02242573, AR02249030,
AR02252971, AR02257905, AR02261752,
AR02269257, AR02289710, AR02298290,
AR02306819, AR02307016, and AR02315076
Various
Corrective Action
Documents
Resulting from
Inspection
AR02322403, 2020 RP Baseline Inspection, lost
documentation [RT-11 Source S/N 006]
03/26/20
Miscellaneous
CSD-RP-ALL-4004
McGuire Passive Whole Body Sensitivity Study
CSD-RP-ALL-7009
Source Check Frequencies for Instruments Used
for Contamination Monitoring at RCA and
Restricted Area Exit Points
CSD-RP-ALL-7013
Optimizing the Source Check Frequency of
Portable Survey Instruments
CSD-RP-ALL-7016
Radon Progeny Rejection
Self-
Assessments
275484-5
Self-Assessment Number: 02275484-5, Fleet
Radiation Protection (RP) Instrument Program
06/20/2019
71151
Procedures
AD-LS-ALL-0004
NRC Performance Indicators and Monthly
Operating Report
Corrective Action 22295456
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Engineering
Evaluations
299984