MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20243012024-02-27027 February 2024 NRC Initial Operator Licensing Examination Approval 05000313/2024301 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230102023-09-20020 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000313/2023010 and 05000368/2023010 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 IR 05000313/20220062023-03-0101 March 2023 Annual Assessment Letter for Arkansas Nuclear One Units 1 and 2 (Report 05000313/2022006 and 05000368/2022006) IR 05000313/20220042023-01-26026 January 2023 Integrated Inspection Report 05000313/2022004 and 05000368/2022004 - 4th Quarter IR 05000313/20220032022-11-0909 November 2022 Integrated Inspection Report 05000313/2022003 and 05000368/2022003 and Exercise of Enforcement Discretion ML22301A1532022-11-0909 November 2022 Notice of Violation NRC Inspection Report 05000313/2022011 and 05000368/2022011 IR 05000313/20220112022-11-0909 November 2022 Notice of Violation NRC Inspection Report 05000313/2022011 and 05000368/2022011 ML22308A1912022-11-0606 November 2022 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000313/2023401 and 05000368/2023401 IR 05000313/20224012022-10-20020 October 2022 Security Baseline Inspection Report 05000313/2022401 and 05000368/2022401 IR 05000313/20220502022-09-26026 September 2022 Special Inspection Reactive Report 05000313 2022050 and 05000368 2022050 Cover Letter Only ML22208A1282022-08-0404 August 2022 (2nd Quarter) Inspection Report 2022 002 IR 05000313/20224032022-06-23023 June 2022 Security Baseline Inspection Report 05000313/2022403 and 05000368/2022403 IR 05000313/20223012022-06-15015 June 2022 NRC Examination Report 05000313/2022301 IR 05000313/20210132022-05-17017 May 2022 License Renewal Phase 4 Inspection Report 05000313/2021013 IR 05000313/20220012022-05-10010 May 2022 Integrated Inspection Report 05000313/2022001 and 05000368/2022001 IR 05000313/20220102022-03-14014 March 2022 Triennial Fire Protection Inspection Report 05000313/2022010 and 05000368/2022010 IR 05000313/20210062022-03-0202 March 2022 Annual Assessment Letter for Arkansas Nuclear One, Units 1 & 2 (Report 05000313/2021006 and 05000368/2021006) ML22047A2702022-02-23023 February 2022 Security Baseline Inspection Report 05000313/2022403 and 05000368/2022403 IR 05000313/20210042022-02-0404 February 2022 Integrated Inspection Report 05000313/2021004 and 05000368/2021004 ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 IR 05000313/20210102022-01-13013 January 2022 Biennial Problem Identification and Resolution Inspection Report 05000313/2021010 and 05000368/2021010 IR 05000313/20210032021-11-0505 November 2021 Integrated Inspection Report 05000313/2021003 and 05000368/2021003 IR 05000313/20210112021-09-23023 September 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000313/2021011 and 05000368/2021011 IR 05000313/20214012021-08-10010 August 2021 Security Baseline Inspection Report 05000313/2021401 and 05000368/2021401 IR 05000313/20210022021-08-0909 August 2021 Integrated Inspection Report 05000313/2021002 and 05000368/2021002 IR 05000368/20213012021-05-17017 May 2021 NRC Examination Report 05000368/2021301 IR 05000313/20210012021-05-0606 May 2021 Integrated Inspection Report 05000313/2021001 and 05000368/2021001 ML21095A3162021-04-13013 April 2021 ANO 2021402-Non SGI Rcl 2024-09-09
[Table view] Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 ML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000313/LER-2024-001, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20243012024-02-27027 February 2024 NRC Initial Operator Licensing Examination Approval 05000313/2024301 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV 2024-09-09
[Table view] |
Text
rch 26, 2019
SUBJECT:
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC FIRE PROTECTION BASELINE INSPECTION REPORT (NRC INSPECTION REPORT 05000313/2019010 AND 05000368/2019010)
Dear Mr. Anderson:
On February 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Arkansas Nuclear One, Units 1 and 2. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Frances C. Ramirez, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
Enclosure:
Inspection Report 05000313/2019010 and 05000368/2019010
Inspection Report
Docket Numbers: 05000313 and 05000368 License Numbers: DPR-51 and NPF-6 Report Numbers: 05000313/2019010 and 05000368/2019010 Enterprise Identifier: I-2019-010-0000 Licensee: Entergy Operations, Inc.
Facility: Arkansas Nuclear One, Units 1 and 2 Location: Russellville, Arkansas Inspection Dates: January 27, 2019, to February 14, 2019 Inspectors: J. Mateychick, Senior Reactor Inspector S. Alferink, Reactor Inspector B. Correll, Reactor Inspector C. Stott, Reactor Inspector Approved By: Frances C. Ramirez, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Arkansas Nuclear One,
Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified during the inspection.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.05XT - Fire Protection - NFPA 805 (Triennial) 02.01a Fire Protection Inspection Requirements
Main article: IP 71111.05
The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones in Unit 1:
- (1) Fire Area B-1
- Fire Zone 120-E, "Boric Acid Addition Tank and Pump Room"
- Fire Zone 149-E, "Upper North Electrical Penetration Room"
- (2) Fire Area G
- Fire Zone 97-Z, "Cable Spreading Room"
- Fire Zone 129-F, "Control Room"
)
- (3) Fire Area F, Fire Zone 110-L, "South Battery Room"
)
- (4) Fire Area I-1, Fire Zone 98-J, "Uncontrolled Access Corridor" 02.03 B.5.b Inspection Activities (1 Sample)
The inspectors evaluated the following B.5.b Mitigating Strategy: Unit 1 S/G Fill Using B.5.b Portable Pump and Fire Water
INSPECTION RESULTS
The NRC inspectors did not identify any finding or violation of more than minor significance.
EXIT MEETINGS AND DEBRIEFS
On February 14, 2019, the inspector presented the triennial fire protection inspection results to Mr. R. Anderson, Site Vice President, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
71111.05XT - Fire Protection - NFPA 805 (Triennial)
Condition Reports
CR-ANO-1-2016-02865 OE-NOE-2017-00369 CR-ANO-C-2019-00481*
CR-ANO-1-2019-00331* CR-ANO-C-2019-00138* CR-ANO-C-2019-00330*
CR-ANO-C-2019-00334 CR-ANO-C-2019-00338* CR-ANO-C-2019-00356*
CR-HQN-2019-00229* CR-ANO-C-2006-00048 CR-ANO-1-2017-02151
CR-ANO-C-2016-03917 CR-ANO-C-2016-05172 CR-ANO-C-2017-01899
CR-ANO-C-2017-03649 CR-ANO-C-2018-01485 CR-ANO-2-2019-00396*
CR-ANO-C-2019-00544* CR-ANO-C-2019-00330* CR-ANO-1-2017-00366
CR-ANO-C-2016-01065 CR-ANO-C-2016-01798 CR-ANO-C-2016-01802
CR-ANO-C-2016-01924 CR-ANO-C-2016-02693 CR-ANO-C-2016-02845
CR-ANO-C-2016-03534 CR-ANO-C-2017-00634 CR-ANO-C-2017-00938
CR-ANO-C-2017-01171 CR-ANO-C-2017-01185 CR-ANO-C-2017-01186
CR-ANO-C-2017-01622 CR-ANO-C-2017-03749 CR-ANO-C-2017-04485
CR-ANO-C-2017-04825 CR-ANO-C-2018-03184 CR-ANO-C-2018-03392
CR-ANO-C-2019-00303 CR-ANO-C-2019-00334* CR-ANO-1-2019-00350*
- Issued as a result of inspection activities.
Work Orders
2555301 52672873 52781840 52784156 52797460 52799637
2318884 52668906 52561254 52636369 52652493 52656026
2670078 52791217 52791217 407051-01 52740987 52750973
2759849 52768936 52780282 52789883 52800501
Procedures
Number Title Revision or Date
COPD-024 Risk Assessment Guidelines 67
EN-DC-115 Engineering Change Process 26
EN-DC-127 Control of Hot Work and Ignition Sources 20
EN-DC-128 Fire Protection Impact Reviews 12
EN-DC-161 Control of Combustibles 18
EN-DC-179 Preparation of Fire Protection Engineering Evaluations 5
EN-DC-329 Engineering Programs Control and Oversight 6
EN-DC-330 Fire Protection Program 5
EN-DC-357 NFPA 805 Monitoring Program 3
1000.125 ANO Fire Impairment Program 25
1003.005 Fire Prevention Inspection 19
1003.014 ANO Fire Protection Program 9
1003.015 ANO NFPA 805 Monitoring Program 1
1063.02 Fire Brigade Training Program 17
1104.032 Fire Protection Systems 90
1106.007 Common Feedwater System 5
203.002 Alternate Shutdown 0
203.049 Fires in Areas Affecting Safe Shutdown 14
1305.016 Safe Shutdown Instrumentation and Equipment Periodic 28
Testing
1306.005 Unit 1 Fire Door Inspection 28
Procedures
Number Title Revision or Date
1306.014 Unit 1 Control Room and Auxiliary Control Room Halon 31
Fire System Inspection
1306.015 Unit 1 Fire Hose Station Testing and Hydrostatic Test 35
1306.035 Fire Damper Surveillance Test 9
1307.012 Unit 1 Fire Detection Performance Test 63
1405.016 Unit 1 Penetration Fire Barrier Visual Inspection 25
2105.014 Safety Parameter Display System Operation 18
203.014 Alternate Shutdown 36
203.034 Fire or Explosion 22
203.048 Security Event 36
EN-DC-359 Fire Risk Management During Non-Power Operations 2
for NFPA 805 Plants
203.002 Alternate Shutdown 29
1015.002 ATT J Decay Heat Removal and LTOP System Control - Protected
Area and Interconnecting System Valve Control 3/25/18
1015.002 ATT J Decay Heat Removal and LTOP System Control - Protected
Area and Interconnecting System Valve Control 4/01/18
1015.002 ATT J Decay Heat Removal and LTOP System Control - Protected
Area and Interconnecting System Valve Control 5/01/18
1015.048 ATT F Shutdown Operations Protection Plan - SOPP for Unit 1 3/27/18
Shutdown Condition 6
1015.048 ATT F Shutdown Operations Protection Plan - SOPP for Unit 1 5/0318
Shutdown Condition 6
1015.002 ATT A Decay Heat Removal and LTOP System Control 3/04/18
1015.002 ATT A Decay Heat Removal and LTOP System Control 4/01/18
1015.002 ATT A Decay Heat Removal and LTOP System Control 5/01/18
Drawings
Number Title Revision
E-1, Sheet 3 Common Feedwater 4.16KV Swgr Bus A-15 and A19 0
E-20, Sheet 3 Common Feedwater 480V AC Power Distribution Panels 0
PP51 and PP91
E-4, Sheet 2 Common Feedwater 4.16KV Swgr Bus A-15 0
E-4, Sheet 3 Common Feedwater 4.16KV Swgr Bus A-19 0
E-17, Sheet 4 Common Feedwater 125V DC Power Distribution Panel 0
D-151 and D-191
E-4, Sheet 1 Meter & Relay Diagram 4160V System Main Supply 32
E-1, Sheet 1 Station Single Line Diagram 62
E-199, Sheet 2 Reactor Coolant Pressurizer ERV Isolation Valve 15
CV1000
E-416, Sheet 1 Intake Structure Sluice Gate (SG-1) 13
E-416, Sheet 4 Intake Structure Sluice Gate (SG-5) 11
E-182, Sheet 1C Reactor Building Sump to Pump P34B Block Valve 3
CV-1406
E-216, Sheet 1B Letdown Coolers E-29A/B Isolation Valve CV-1221 3
E-195, Sheet 1 Limit and Torque Switch Development for MOVs and SOVs 8
E-76, Sheet 1 Typical Circuit Breaker 6900V and 4160V Switchgear 17
E-310, Sheet 3 Common Feedwater Control Valve CV-2660A 0
E-2942, Sheet 2 EP Communication Block Diagram 0
Drawings
Number Title Revision
FP-101 Lower Level Piping 4
FP-102 Upper Level Piping 4
FP-104 FP-104 LL North Piping 4
FP-105 FP-1054 LL & UL South Piping 4
M-219, Sheet 1 Piping and Instrument Diagram Fire Water 91
M-2219, Sheet 1 Piping and Instrument Diagram Fire Water 65
M-2219, Sheet 2 Piping and Instrument Diagram Fire Water 71
M-2219, Sheet 5 Piping and Instrument Diagram Unit One/Unit Two 54
Outside Fire Water Loop
M-2219 Sheet 5A Piping and Instrument Diagram AAC Generator Building 0
Fire Water System
Miscellaneous Documents
Number Title Revision or Date
ASB 1203.002 Alternate Shutdown Procedure Basis Document 29
ER-ANO-2004-0195-000 ANO-1 & 2 Alternate Shutdown Communication System 0
010149 Adequacy of Portable Radios during an Alternate 0
Shutdown Scenario
ULD-0-SYS-09 ANO Fire Protection System 7
ULD-0-T02-A Fire Protection NFPA 805 Topical 2
Fire Service Mutual Aid Agreement - Pope County, April 2010
Arkansas
Letter of Agreement between Entergy Operations, Inc. 12/13/18
and London Rural Volunteer Fire Department
Unit 1 Fire Hazards Analysis 18
Unit 1 Safety Analysis Report 29
Unit 1 Technical Requirements Manual 66
Vendor Document
Number Title Revision
TDL0150050 Non 1E Switchgear Backup DC Control Power System 1
Modifications
Number Title Revision
EC46524 Resolve NFPA-805 Information Notice 92-18 Issues and Spurious 0
Operation of ANO-1 MOVs CV-1221, CV-1405, CV-1406, SG-1,
SG-2, SG-3, SG-4
EC58985 ANO-1 Electrical Penetration Room Sprinkler Modifications 0
In Accordance With NFPA 805
EC66040 ANO-1 Fire Damper Upgrade 0
EC73886 ANO-1 Fire Barrier Upgrade for Redefined Fire Area Boundaries 0
EC 57037 CV-1404 P34A/B Reactor Coolant Decay Heat Suction Isolation 0
Valve - Install Inhibit Circuit to Prevent Spurious MOV Operation
- Unit 1 NFPA 805 LAR Item S1-35
EC49871 H1 & H2 Switchgear Control Power Upgrade (Child EC) NFPA 805 0
ANO Unit 1 Items S1-5 and S1-6
EC54998 A2 Switchgear Control Power Upgrade (Child EC) NFPA 805 0
ANO Unit 1 Item S1-3
EC47521 Child EC for EC46524 - Resolve IN 92-18 Issues and Spurious 0
Modifications
Number Title Revision
Operation of ANO-1 MOV CV-1406
EC48709 Unit 1 and Unit 2 Switchgear Control Power Upgrade 1
Engineering Reports
Number Title Revision
PSA-ANO1-03 ANO-1 Fire Probabilistic Risk Assessment (FPRA) 5
Summary Report
PSA-ANO1-01-SC-02 ANO-1 MAAP 4.0.5 Analysis to Support the Fire PRA 0
PSA-ANO1-03-FSS ANO-1Fire PRA Scenario Report 0
PSA-ANO1-03-HRA ANO-1 Fire PRA Human Reliability Analysis (HRA) Notebook 0
Calculations
Number Title Revision
CALC-10-E-0023-01 ANO-1 Fire Area B-1@120-E Risk Evaluation 0
CALC-10-E-0023-17 ANO-1 Fire Area F Risk Evaluation 0
CALC-10-E-0023-18 ANO-1 Fire Area G Risk Evaluation 0
CALC-10-E-0023-20 ANO-1 Fire Area I-1 Risk Evaluation 0
CALC-83-E-0063-13 Summary Calculation - Flooding Depths due to Fire 4
Protection Discharges and Known Elevations of Safety-
Related Electrical Equipment
CALC-85-E-0072-05 Time to Core Uncovery Following Opening of the ANO-1 0
Electromatic Relief Valve with No Makeup Available
CALC-85-E-0086-01 SSCA Safe Shutdown Capability Assessment 10
CALC-85-E-0086-02 Manual Action Feasibility Methodology and Common Results 6
CALC-85-E-0086-18 Safe Shutdown Equipment List Methodology 4
CALC-09-E-0008-01 ANO-1 NFPA 805 Non-Power Operations Assessment 2
CALC-ANO1-FP-08-00001 Radioactive Release Transition Report 5
CALC-ANO1-FP-16-00002 ANO-1 NFPA 805 Monitoring Program Phase 2: Screening 1
Using Risk Criteria and Phase 3: Risk Target Value
Determination
CALC-ANOC-FP-14-00001 Evaluation of Dose Consequences from Fire in a 0
Radwaste Container Stored in an Outside Area
ML19085A430
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JMM Yes No Publicly Available Sensitive NRC-002
OFFICE RI:EB2 RI:EB2 RI:EB1 SRI:EB2 BC:EB2 BC:DRPD BC:EB2
NAME SAlferink BCorrell CStott JMateychick FRamirez NOKeefe FRamirez
SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/
DATE 3/1/2019 3/4/2019 3/5/2019 3/18/2019 3/19/2019 3/22/2019 3/26/2019