IE Mgt Meeting Repts 50-354/81-17 & 50-355/81-18 on 811112. No Noncompliance Noted.Major Areas Discussed:Results of 811020 Board Convened to Evaluate Licensee Performance for Jul 1980-June 1981
ML20038C985
Person / Time
Site: Hope Creek  PSEG icon.png
Issue date: 12/01/1981
From: Bateman W, Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20038C984 List:
References
50-354-81-17, 50-355-81-18, NUDOCS 8112140318
Download: ML20038C985 (2)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-354/81-17 and 50-355/81-18 Docket No.10-354 and 50-355 License No. CPPR-120 and CPPR-121 Licer.see: Public Service Electric and Gas Company 80 Park Plaza - 17C Newark, New Jersey 07101 Facility Name: Hope Creek Generating Station Meeting at:

Hancock's Bridge, New Jersey Meeting Conducted:

November 12, 1981 Inspectors:

f% p

/

P. H. Bateman, Senior Resident Reactor Inspector Jate aigned date signed date signed Approved by:

Ch b 61<

(n i t.l i / E!

'

E. G. Greenman, Chief, Reactor Projects Section date signeo No. 2A, Projects Branch No. 2, DRPI Meeting Summary:

Meeting on November 12, 1981 (Combined Report Nos. 50-354/81-17 and 50-35_5/81-18)

Scope:

Special, announced management meeting to discuss the results of the Region I board convened on October 20, 1981, to evaluate the licensee's performance from July 1, 1980, to June 30, 1981, as part of the NRC's SALP program. Areas addressed included:

Quality Assurance; Site Preparation and Foundations; Containment Structures; Safety-Related Structures; Piping and Hangers; Safety-Pselated Components; Elec*rical; Instrumentation; Fire Protection; Corrective Actions and Reporting; Procurement; Design and Design Changes; and Training.

Results: A summary of the licensee performance evaluation was presented.

Region I Form 12 8112140318 811202 (Rev. April 77)

PDR ADOCK 05000354 G

PDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

_ _ - _

_. _.

.

t DETAILS 1.

Licensee Attendees V. J. Blenx, Construction Manager R. Bravo, Principal Construction Engineer A. E. Giardino, Project QA Engineer P. Landrieu, Project Manager E. A. Liden Manager, Nuclear Licensing E. C. Logan, General Manager, Construction T. J. Martin, Vice President, Engineering and Construction R. L. Mitti, General Manager, Corporate Quality Assurance A. Nassman, Manager, QA Engineering and Construction B. A. Preston, Project Licensing Engineer, Hope Creek A. C. Smith, Assistant Project Manager 2.

Bechtel Power Corporation M. A. Drucker, Lead Site QA Engineer G. B. Jones, Project Manager G. Moulton, Project QA Engineer L. E. Rosetta, Field Construction Manager 3.

NRC Attendees J. Allan, Deputy Regional Administrator W. H. Bateman, Senior Resident Inspector, Hope Creek R. Gilbert, Licensing Project Manager, NRR E. G. Greenman, Chief, Reactor Projects Section 2A, DRPI R. W. Starostecki, Director, Division of Resident and Project Inspection, Region 1

Discussion A brief summary of the Systematic Appraisal of Licensee Performance (SALP)

Program was presented to explain the basis and purpose of the evaluation.

The NRC Region I evaluation board meeting was discussed, including the appraisal period, performance data and the results of the board's evaluation.

The licensee will provide comments, concerning the evaluation, to the Senior Resident Inspector within 2 weeks.

The SALP Cycle 2 evaluation report will be issued and distributed subsequent to NRC management's approval of SALP program changes which implement the Commission's guidance of October 20, 1981. This guidance is documented in NRC report NUREG-0834, "NRC Licensee Assessments."

,

,..