U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION'AND ENFORCEMENT Region I
'
Report-No. 50-355/81-17'
&
Docket No. 50-355 License No. CPPR-121 Priority
--
Category B
Licensee: Public Service Electric and Gas Co.
~80 Park Plaza - 17C Newark, New Jersey 07101 Facility Name:~ Hope Creek Generating Station, Unit 2
'
Inspection at: Hancock's Bridge, New Jersey Inspection conducted: November 13' 1981 Inspectors:
[2. A
<P'/
W. A. F.ekito Reactor Inspector d6te ligned
,
12--2-81
. S..L-Pullanf f Reactor Insper-tor date signed
/2_/ M 6/
' Approved by:
- ~-
L.'H..Bettenhausen, Ph.D., Chief date signed
~
Test Program Section, Engineering Inspection Branch Inspection Summary:
Inspection on November 13,1981 (Report No. 50-355/81-17)
i Areas Inspected: Routine, unannounced inspection of construction testing including Primary Containment Structural Integrity Test procedure review and tour of containment. The inspection involved 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> on site by two region based NRC-inspectors.
Results: No items of noncompliance or deviations were identified.
g%
'
G~
~
,
.
1.
Persons Contacted Public Service Electric and Gas Company (PSE&G)
A.D.'Barnabei, Q.A. Engineer
-
J. Cicconi, Startup Manager
D. Constantine, PCD
A.E. Giardino, Project QA Engineer
K. McJenkin, PCD.
- Bechtel Power Corporation (Bechtel)
M.A.'Drucker, LSQAE'
M.C. Henry,-PFE
M.' Lombardi, FCE
. G. Moulton, PQAE
D.K. Sakers, Asst. PCQCE
J. Serafin, APFE
Pittsburgh - Des Moines Steel Company (PDM)
M. Stiger, QA Manager
R. Watson, Project Manager
U.S. Nuclear Regulatory Commission W.H.' Bateman, Senior Resident Inspector
,
'
The inspector also talked with and interviewed other licensee and contractor employees during the-inspection.
,
- Denotes those present at the exit interview.
2.
Containment Structural Integrety Test (CSIT)
'
a.
Documents Reviewed p
,
'
--PDM Test Procedure PTP-1, Revision D, Field Test of Primary l-Containment Vessel.
,
I
4 i
- re v s
,
,
.-
--Bechtel Specification
_
_.
10855-C-152 (Q),: Revision 18-(10-29-81),
Design Specification;for Furnishing, Designing, Detailing, Fabrication, Delivery and Erection of Primary Containment
--PSE&G Review Comments on.Bechtel specification 10855-C-152(Q) and Transmittal Letter to Bechtel, dated 7-9-74
--PSE&G-Approval Letter dated-2-25-76'for PDM contract.
.
--ASME B&PV Code,Section III, Division 1, Article NE-6000, 1974.
Edition-through the Winter 1974' Addenda.
--PSE&G Hope Creek Startup Administrative-Manual.
--Regulatory Guide 1.68,- Revision 2 ~
Initial Test Programs for Water-Cooled Reactor Power Plants, b.
Scope of Review i
The inspector. examined Test Procedure--PTP-1 to verify compliance with applicable code and specification technical' requirements.
The procedur~e was also reviewed to verifyf that' administrative.
~
controls were consistent with regulatory guidance and licensee
. commitments for the Preoperational Testing Program.
Some key aspects verified included:.
--Management review and approval;-
--Test objectives clearly stated;
--Prerequisites identified;
L
--Procedure format and detail;-
,
--Special test equipment requirements including calibrated F
Linstrumentation;
--Acceptance criteria exactness; and,
--Independent verification of critical steps or parameters; The inspector also discussed the status of.. test preparations with personnel responsible for the conduct and acceptance of the test. The'
licensee representative explained how inspection teams are being
-
___
-
.. _
..
-
formed; personnel are being qualified; and.AS BUILT weld map drawings are being finalized for use during the leakage inspections. The licensee plares to conduct this series of tests (overpressure, weld examination, overall leakage measurement) on November 19 - 22, 1981.
Based on the above review, the inspector identified the. following-concerns and discussed them with licensee management.
1)
The inspector noted that Regulatory Guide 1.68 lists the primary containment overpressure test requirement and provides guidance for preparation, review, approval of test procedures, and acceptance of test results. Because the Final Safety. Analysis Report (FSAR)
is not yet developed, the inspector could not fully ascertain the licens<2e commitments for this test or administrative controls for.
the preoperational test program.
Review of Startap Administrative Procedure No. l' revealed delegation of responsibility for construction verification. tests to the-l Bechtel Construction Department. The licensee identified his l
approval of the test procedure-through review and approval of Bechtel Specification-10855-C-152(Q) which included an outline of
~
the test procedure. This was documented in licensee's letters to Bechtel dated 7-9-74 and 2-25-76. :The licensee stated that i
I conformance with regulatory-guidance is assured through the above and participation by PSE&G QA and Startup personnel with Bechte1~
and PDM personnel for witnessing of the test and approval of the Test results.
The information above satisfied the inspector's concern for conformance with applicable regulatory guidance.
2)
The inspector confirmed with the licensee that the hole burned through both plies of a containment vent line bellows reported earlier by the licensee and temporarily patched will be treated as an exception to the CSIT, will be permanently repaired after the CSIT, and the affected bellows will be tested. separately.
The inspector's concerns were satisfied..The inspector had no further questions at this time.
3.
Tour of the Containment
~
- The inspector.made a tour of.the containment and the test' equipment panel.
During this tour, the inspector observed and discussed with.
the: licensee personnel the general status of the containment with respect to its readiness for the test. The licensee personnel confirmed that all prerequisites, as identified in the test procedure, including removal of all combustibles, will be completed prior to the test.
,
n
......
....
.... _
.
,,,
_ _ _ _
.
.
No unacceptable conditions were found.
4.
Exit Interview The inspector niet with licensee management representatives (see Section 1 of this report for attendees) at the conclusion of the inspection on November 13, 1981. The inspector summarized the scope and findings of the inspection at that time.
..