Forwards IE Insp Rept 50-346/80-03 on 800214-15 & 0313. No Noncompliance Noted
ML19323C755
Person / Time
Site: Davis Besse 
Issue date: 04/09/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19323C756 List:
References
NUDOCS 8005190138
Download: ML19323C755 (2)


See also: IR 05000346/1980003

Text

.- ..

.

-

--

8u051g0/3V

'

,

k

/

'o

UNITED STATES

8"

E

g/

NUCLEAR REGULATORY CVMMISSION

h[h [o

/

E

REGION lli

$

'

6

J

799 ROOSEVELT ROAD

o,

b

GLEN ELLYN,ILLINOls 60137

/

o

  • ...

gRS

N

-

Docket No. 50-346

Toledo Edison Compan/

ATTN:

Mr. Richard P. Crouse

Vice President - Nuclear

Edison Plaza

,

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. K. D. Ward of this cffice

on February 14-15 and March 13, 1980, of activities at Davis-Besse Nuclear

Power Station Unit No. 1, authorized by NRC Operating, License No. NPF-3

and to the discussion of our findings with Mr. T. Murray at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

1

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

!

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

i

Room, except as follnws.

If this report contains information that you

or your contractors believe to be proprietary, you must epply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

. - .

.

-

. . - . - - .

. - . . . .

.

.

Toledo Edison Company

-2-

gpg g

)$$Q

We will gladly discuss any questions you have concerning this

-

inspection.

,

Sincerely,

,

5

AWk

G. Fiorelli, Chief

Reactor Construction and *

Engineering Support Branch

Enclosure:

IE Inspection

Rpt No. 50-346/80-03

cc w/ encl:

T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio Power

Siting Commission

Helen W. Evans, State

of Ohio

1

,

,

,

e *-

3-

-- -