Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-346/79-05
ML19276G040
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/25/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Grant
TOLEDO EDISON CO.
Shared Package
ML19276G041 List:
References
NUDOCS 7905150113
Download: ML19276G040 (1)


Text

T TIC

-

g ** %4 UNITED ST ATES f.

t NUCLEAR REGULATORY COMMISSION

,

f,'l (fi i j REGloN 111 g a,,) g e

799 ROoSE VE LT RO AD s,., j m~ m m,u,so,,em,

.....

APR 2 61T/9 Docket No. 50-346 Toledo Edison Company ATTN:

Mr. James S. Grant Vice President - Energy Supply Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

Thank you for your letter dated April 3, 1979, informing us of the steps you have taken to correct the noncom-pliance identified in our letter dated March 14, 1979.

We examined your corrective action during a recent inspection.

Your cooperation with us is appreciated.

Sincerely, R. F. Heishman, Chief Reactor Operations and Nuclear Support Branch cc:

T. D. Murray, Station Superintendent cc w/ltr dtd 4/3/79:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Ohio Power Siting Commission 7005150ll3