Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-346/79-16
ML19259D605
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/11/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
References
NUDOCS 7910250157
Download: ML19259D605 (1)


Text

_

d.

/ va asouq'o, UNITED STATES

,

E'

NUCLEAR REGULATORY COMMISSION

,

o

.

[

$

E REGION 111

799 ROOSEVELT ROAD GLEN ELLYN. ILLINOIS 60137 o

.....

OCT 11 1979 I

I Docket No. 50-346 Toledo Edison Company ATTN:

Mr. Richard P. Crouse Vice Presidet.t Energy Supply Edison Plaza 300 Maiison Avenue Toledo, OH 43652 Gentlemen:

Thank you for your letter dated September 20, 1979, informing us of the steps you have taken to correct the noncompliance identified in our letter dated Sdptember 5, 1979. We will examine your corrective action during a future inspection.

Your cooperation with us is appreciated.

Sincerely,

'

t

,

A. B. Davis, Chief Fuel Facility and Materials Safety Branch cc:

Mr. T. D. Murra;,

Station Superintendent cc w/ltr dtd 9/20/79:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio i 2 i.7;

.; 3 'I 7910250157

  • e g

h4

.

TDLEDO September 20, 1979 EDISON Docket No. 50-346 License No. NPF-3 Serial No. 1-92 Mr. A. B. Davis, Chief Fuel Facilities and Safety Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

.

Dear Mr. Davis:

Toledo Edison acknowledges receipt of your September 5, 1979 letter and report enclosure 79-16, referencing an apparent item of noncompliance to Davis-Besse Nuclear Power Station Unit No. 1 commitment to the NRC listed as an " Infraction" under the heading of " Notice of Violation".

Following a thorough examination of this item, Toledo Edison herein offers information regarding the item of roncompliance.

Infraction: Technical Specification 6.8.2 requires that procedures, includ-ing the applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, be reviewed by the SRB and approved by the Station Superintendent prior to implementation. Appendix

"A" of Regulatory Guide 1.33 lists the solid radwaste system as an activity which should be covered by written prccedures.

Contrary to the above, the procedures for operation of a port-able radwaste solidification system, in use on numerous occasions during 1978 and 1979 to date, had not been reviewed by the SRB and approved by the Station Superintendent.

Response:

1.

Regulatory Guide 1.33, Appendix A, Section 7.b(1) specif-ically lists " spent resins and filter sludge" on " solid waste system".

The type of material solidified was evaporator bottoms and the procedure was not reviewed by the SRB.

On August 7, 1979, the SRB changed the classification of Procedure SP 1104.28 (Solid Radwaste Disposal) so that it will be reviewed by the SRB.

2.

On September 4, 1979, a major modificatioc to SP 1104.28 was prepared which included the vendor's procedure for solidification received by the Station on August 29, 1979.

The revised procedure waa submitted to the B for review.

%

7 7 /$ // p 7Ls?

f THE TOLEDO EDISON COMPANY EDISON PLAZA 300 M ON AVENUE TOLEDO. OHIO 43652 SEP 2 61979 12l3 335

...

,

  • o.

,

.

Mr. A. B. Davis, Chief Docket No. 50-346 Serial No. 1-92 September 20, 1979 Page 2 3.

The. revised procedure is expected to be reviewed by the SRB and approved by the Station Superintendent by September 28, 1979.

Yours very truly, f f !

_.

.

Richard P. Crouse Vice-Presi h t, Energy Supply TDM/DWB/ daw 1213