IR 05000346/1979015
| ML19242C889 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/17/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| References | |
| NUDOCS 7908140092 | |
| Download: ML19242C889 (3) | |
Text
""G
,p.5 "
W,'o,
,,
UNITED STATES
- E'
/ ',
NUCLEAR REGULATORY COMMISSION 3.,.,,, f '
REGION 111
\\.h. E
' - ' -
,8 799 ROOSEVELT ROAD
'
o,
+'
/
GLEN E LLYN. lLLINOIS 60137
- ..*
July 17, 1979 Mr. L. E. Roe, Vice President, Facilities Development Toledo Edison Company i
Edison Plaza 300 Madison Avenue Toledo, Ohio 43652
Dear Mr. Roe:
This letter confirms the resolution of the Fire Prevention Program issues for Davis-Besse Nuclear Power Station, Unit No. 1, as discussed with you on July 5, 1979, by members of my staff.
The issues involved are briefly described in the attachment to this letter.
The details are included in Inspection Report No. 50-346/79-15.
We would be happy to discuss this matter further with you if you so desire.
Sincerely
,
jk)
+-
James !-. Kcpp er Director Enclosure: Fire Prevention Program Issues cc w/ encl:
T. D. Murray, Station Superintendent Central Files Reproduction Unit NRC 20b PDR Local FDR NSIC TIC Harc1d W. Kohn, Power Siting Commission nan c
.uu
,
7 9 0 814 009;L
.
.
ISSUE RESOLUTION AD 1828.20 needs to list the requirement to Commitment to make procedure changes by October 25, perf orm at least one drill per year on a "Back 1079.
Shift" for each fire brigade.
AD 1828.20 needs to list the requirement to Commitment to wake procedure changes by October 25, perform a suf ficient number of unannounced 1979.
drills.
AD 1810.01 needs to provide for additional Commitment te make procedure changes by October 25, portable suppression equipment for transi-1979.
ent fire loads.
AD 1810.01 needs to list the restrictions Commitment to make procedure changes by October 25, prohibiting smoking in safety-related areas.
1979.
..
NOTE: The above resolutions are consistent with the facility license to have the Fire Protection Program completely implemented by the first refueling.
. -
~
.)
O
.-
-2-
,
v
.
ISSUE RESOLUTION Failure to review and approve f ire protection Commitment to review and approve all pre-plans program implementation procedures.
(Pre-plans)
distributed by October 25, 1979.
Failure to establish, implement and maintain Commitment to make identified procedure changes adequate procedures covering fire protection to administrative controls by October 25, 1979.
program implementation.
Fire emergency procedure EP1202.35 needs to Commitment to make procedure changes by July 31, be changed to guide Control Room personnel to 1979.
the fire pre-plans in event of fire.
Service water emergency procedure EP1202.19 needs Conmitment to make procedure changes by July 15, to be changed to include a valve line-up check 1979.
sheet and return to normal.
All fire brigade members need to be qualified Commitment to qualify all fire brigade members by on respiratory training.
October 25, 1979.
AD 1810.00 needs to list the physical exam-Commitment to make procedure changes by October 25, ination requirements for each fire brigade 1979.
member.
AD 1810.00 needs to list the minimum Commitment to make procedure changes by October 25, eligibility requirements of a fire protec-1979 tion engineer position.
AD 1828.20 needs to provide for classroom Commitment to make procedure changes by October 25, instruction program to be repeated over a 1979.
o two year period.
AD 1828.20 needs to provide for practice Commitment to make procedure changes by October 25, sessions under strenuous conditions 1979.
..
A k