IR 05000341/1979016
| ML19254E852 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/22/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML19254E853 | List: |
| References | |
| NUDOCS 7911020406 | |
| Download: ML19254E852 (1) | |
Text
[
'o UNITED STATES E \\* g (',j NUCt. EAR REGULATORY COMMISSION
,E r
elEGION lli g,* '
,8 799 ROOSEVELT ROAD
'
o,% '%#
b, GLEN ELLYN, ILLINOIS 60137
-
,*..* o OCT 2 21979
,
Docket No. 50-341
.
The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 6entlemen:
Thank you for your letter dated September 28, 1979, informing us of the steps you have taket. to correct the items of noncompliance which we brought
,
to your attention in Inspection Report No. 50-341/79-16 forwarded by our letter dated August 28, 1979. We will examine these matters during a sub-sequent inspection.
Your cooperation with us is appreciated.
Sincerely, Gaston Fiorelli, Chief Reactor Construction and Engir.i'ing Support Branch cc w/1tr dtd 9/28/79:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas Jr., Attorney 1252 033
u
'
006 7911020