IR 05000341/1979016

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-341/79-16
ML19254E852
Person / Time
Site: Fermi 
Issue date: 10/22/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19254E853 List:
References
NUDOCS 7911020406
Download: ML19254E852 (1)


Text

[

'o UNITED STATES E \\* g (',j NUCt. EAR REGULATORY COMMISSION

,E r

elEGION lli g,* '

,8 799 ROOSEVELT ROAD

'

o,% '%#

b, GLEN ELLYN, ILLINOIS 60137

-

,*..* o OCT 2 21979

,

Docket No. 50-341

.

The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 6entlemen:

Thank you for your letter dated September 28, 1979, informing us of the steps you have taket. to correct the items of noncompliance which we brought

,

to your attention in Inspection Report No. 50-341/79-16 forwarded by our letter dated August 28, 1979. We will examine these matters during a sub-sequent inspection.

Your cooperation with us is appreciated.

Sincerely, Gaston Fiorelli, Chief Reactor Construction and Engir.i'ing Support Branch cc w/1tr dtd 9/28/79:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas Jr., Attorney 1252 033

u

'

006 7911020