IR 05000341/1979010
| ML20062H187 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/12/1979 |
| From: | Hines E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Foirelli G DETROIT EDISON CO. |
| Shared Package | |
| ML19259C339 | List: |
| References | |
| NUDOCS 7906140601 | |
| Download: ML20062H187 (2) | |
Text
I~
'.
POR
.
j/
UNITED STATES 4,
,fy
.t NUCLEAR REGULATORY COMMISSION
.
,
j,
,' '
j REGloN IH f
799 RooSE VELT ROAo
$
r GL EN E LL VN ILLINOIS 60137 1.....
APR 12 579 Docket No. 50-341
-
Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
This refers to the inspection conducted by Mr. C. Williams of this office on March 29-30, 1979, of activities at Enrico Fermi, Unit 2,
'
authorized by NRC Construction Permit No. CPPR-87 and to the discus-sion of our findings with Mr. R. Costello and the Fermi 2 staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room, except as follows.
If this report contains information that you or your contractors believe to be proprietary, you must apply in writing to this office, within twenty days of your receipt of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the information is considered proprietary, and should be prepared so that proprietary information identified in the application is contained in an enclosure to the application.
79061406(31
,
. -
.
,
.
APR 121979
.
Detroit Edison Company-2-b'e will gladly discuss any questions you have concerning this inspection.
Sincerely, M
T M'
,
Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch Enclosure:
IE Inspection
Report No. 50-341/79-10 cc w/ encl: