U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-341/79-12
Docket No. 50-341 License No. CPPR-87 Licensee: Detroit Edison Company 2000 Second Avenue Deuroit, MI 48226 lacility Name: Enrico Fermi 2 Inspection At: Monroe Michigan Site May 1-4 Inspection Conducted: Y ?' T / & [, 1979 Inspectors: H. M.,Wescott 4/-N ,0 lf ((,tW ^ , [ - - 7 7 H es h/bi,uLhe'-- - d 7#f p E. W. K. Lee / n' C - ( l' , Approved By: R. C. Knop, C ef (,. '/- / 7 Projects Section Inspection Summary Inspection on May 1-4, 1979 (Report No. 50-341/79-12) Areas Inspected: Follow-up of previously identified noncompliances/ unresolved items; 50.55e reports; independent inspection; torus modification; reactor pressure boundary piping records; safety related piping records; electrical work activities; electrical records; electrical procurement.
The inspection involved 69 inspector-hours onsite by three hPC inspectors.
Results: Of the ten areas inspected, no items of noncompliance or deviations were identified.
, -, I66 nd t 79072 6ol6o . .
. . DETAILS - Persons Contacted Detroit Edisen Corrany
- W.
M. Adair, Field Engineer '
- A.
Alexiou, Assistant Project Manager
- R. W. Ba rr, Proj ect QA Director
- W.
H. Buchanan, Field Engineer G. Carter, QA Engineer P. Cribbs, QA Engineer
- T.
H. Dickson, Assistant Project Manager
- E.
Hines, Assistant Vice President QA
- C.
J. Miller, Senior QA Engineer
- G.
V. Vangoff, Field Engineer *H.
- A.
Walker, Site Project QA Engineer Daniel International Corporation
- C.
B. Bliesener, Administration Assistant to Project Manager hJ. T. Blixt, QC Manager kJ. G. Bolt, QA Manager
- J.
G. Conner, Electrical Manager
- G.
King, QA Engineer
- M. Mujumder, Piping Engineer hD. E. Siefert, Project Manager
- R. Tietz, Manager Piping / Mechanical
- D.
L. Vandergrift, QC Engineer Reactor Controls N. Sne11ings, QC Siti: Supervisor Comstock
- E.
K. Graybill, Project Manager Hartford Steam Boiler Insurance Company C. Fiallo, ANI
- Denotes those attending the exit interview.
-2-gE4 << 40b <J
. Licensee Action on Prefious inspection Findings (Closed) Unresolved Item (341/78-02-07): There was no follow-up audit by the licensee of Daniel International.
The inspector reviewed Detroit Edison's audit of Daniel International, (Clcsed) Noncompliance (341/78-05-06): Safety-related electrical supports having unacceptable welds were not identified.
This inspec- , tion revealed that welds in electrical support and tray systems had been inspected and repaired in accordance with S&L acceptance standard DCN 984, Revision D.
All hold tags had been removed.
(Closed) Unresolved Item (341/79-05-03): Seismic qualification test results for York Electro-Panel Control Company instrument racks.
The inspector reviewed York-Electro panel seismic analysis of wall mounted instrument racks, Final Report No. 77113-1 dated December 29, 1977, and seismic analysis of floor mounted instrument racks, Final Report No. 77113-2 dated December 29, 1977.
(Closed) Infraction (341/78-09-05): Formal audits of Daniel International had not been performed by the licensee.
The inspector reviewed the licensce's audit schedules for September through December 1978, and January through June 1979.
Seven audits of Daniel International are scheduled through June 1979.
Two of these audits have been completed and one was in progress during this inspection.
This items is considered closed.
(Closed) Unresolved Item (341/78-16-02): Magnetic Particle Reports: The inspector was informed that PT and MT reports for Section III piping fabricated by Dravo will be maintained and stored by the fabricator. The licensee further stated that past audits and reviews of Dr vo's facilities and programs were successful.
(Clused) Unresolved Item (341/7'-16-03): Piping Material Certifi-cation: The inspector ascertained that the components in the subject material certifications were fabricated from pipe and the piping material specification was met.
(Closed) Unresolved Item (341/78-18-01): Jet pumps numbered 4, 8, 10, and 12 hai a different appearing welds. Fxcessive weld spatter on jet pumps numbered 6,11, 15, 18, 19.
The inspector reviewed GE letter File No. 1267 dated December 12, 1978 subject; " Letter of Clarification on Jet Pump Mixers" and WPS P504P102 " Arc Welding of Austentic Stainless Steel" This procedure allows several methods for welding of the jet pumps. The inspector also reviewed GE's FDDR No. KHI-117 dated November 17, 1978 and traveler KH-117 which indi-cated that welo spatter had been removed from all jet pumps (20 EA) -3-466 255
. . and risers by filing.,This was completed on November 29, 1976.
QC verification was completed on December 5, 1978.
This item is considered closed.
(Closed) Infraction (341/78-18-02): Dye penetrant and developer had not been cleaned from test surfaces.
The inspector reviewed the licensee's daily rcport No. PC-113078 that indicated there was also tape residue found.
He also vecified that penetrant and developer
was present.
The inspector made a visual examination in the reactor pressure vessel and determined that the penetrant, developer and tape residue had been removed. This item is considered closed.
(Closed) Infraction (341/78-18-03): Three valves were not stored properly - end caps tat in place. The inspector toured the site and found storage conditions acceptable.
The three valves in question had been removed or installed.
This item is considered closed.
(Closed) UnrescIved Item (341/78-18-04): Calibration must be in accordance with ASTM etc.
The licensee committed to review site activities.
The ins ector reviewed audits 72.1G of Daniels International, 72.1E.
Wisemer Becker, 72.lC.
Comstock, 72.lD.
GE ISLE, 72.lB Reactor Controls, and 72.1 A Comstock.
This item is considered closed.
(Closed) Deficiency (341/78-18-05): Daniel Internatior.a1 QC pe nn.' records indicated that an indi,idual had been hired in February 's, but did not have an eye examination until June 9, 1978.
The inse t<- reviewed QC personnel records and established that the individual's eye examination was in place an ' that he was satisfactorily examined on June 16, 1979.
I' addition, the licensee reviewed the records and found that six eye examinations were not dated.
This situation was also corrected by letter from the examiner establishing the proper date.
This item is considered closed.
(Closed) Unresolved Item (341/78-18-08): Records not available to establish that the 2 psig tests were performed on the personnel locks. The inspector reviewed Chicago Bridge and Iron Drawing 162 Rev. 2 " Air Lock Name Plate Assembly" which stated that " Doors will seal against a negative pressure of 2 psig in containment vessel."
The air lock was tested at 84 psig which is cocsidered adequate.
This item is considered closed.
(0 pen) Unresolved Item (341/78-18-07): Dravo boss velds excessively rough.
Meaningful visual or penetrant examination could not be pe r f o rme d. The inspector reviewed DDR W-2479 dated January 31, 1979, -4- , e - 4,06 <2 J b
. . reference spool E41-2292-2(2) 1" taps 4A, 4B and 4 hanger lugs 6A, 6B, 6C and 6D, and DDR V-2333 (changed to W-2819) dated December 6, 1978 reference spool C41-336-1, Dravo welds No. 6, 5A, Sh, 7A, and 7B.
The weld will pass PT or visual examination.
Tnis item rem.atns open pending final d2sposition by the licensee, . -5-466 257
. - Section i Prepared by E. W. K Lee Reviewed by D. H. Danielson, Chief Engineering Support Section 2 + 1.
Torus Modification a.
Observation of Work Activities (1) The inspector observed welding of repairs of Ring Beam No. 3A and B and welding of butterbead of Column No. 9.
It was determined that (1) proper welding materials were used; (2) welding procedure requirements were met; (3) work area was free of weld rod-stubs; (4) physical appearance was acceptable; and (5) welders are currently qualified.
(2) The inspector observed magnetic particle examination of R.ng Beam No. 6A.
It was determined that (1) surface condition was acceptable; (2) procedure requirements were met; and (3) personnel was properly qualified.
b.
Review of Records The inspector reviewed the following records: (1) Reactor Control, Incorporated (RCI) welding Procedures No. WPS-ll7, Rev. 1 and No. WPS-ll5, Rev 2 and the associated procedure qualification records; (2) RCI magnetic particle procedure No. TP-110, Rev. 2; (3) 3 welder qualification records; (4) 1 NDE personnel qualification record; (5) Process Contral Sheet of Ring Beam No. 9A and B including repair records; (6) QC surveillance records of welders.
-6-466 258
. It was determined that the above documents c.e t the procedure and code requirements.
No items of noncompliance or deviations were identified.
2.
Reactor Coolant Pressure Beundary Piping - Review of Records a.
Shop Fabricated Piping Records , The inspector reviewed data reports, NDE reports, shop travelers, material certifications, repair records, General Electric Company QC checklist, and receiving inspection reports, as applicable, for the following shop fabricated piping spools:
- 1) Main Steam System, Spools No. PS-2-B2 and No. PS-2-C3.
(2) Recirculation System, Spools No. RD-2-A2 and No.
RD-2-B3.
(3) C re Spray System, Spools No. E21-3052-2, and No.
E21-3053-3.
(4) Reactor Core Isolation Cooling System, Spools No.
E51-2192-2 and No. E51-2192-1.
It was deteruined that applicable code requirements were met.
b.
Audit Reports The inspector reviewed Daniel International Corporation Audit Finding Reports No. AFR79-01-31D, No. AFR78-09-05D, No. AFR79-01-33D and No. AFR78-ll-lD.
It was determined that findings were corrected and properly closed out.
No items of noncompliance or deviattas were identified.
3.
Safety Related Piping - Review of Resseds The inspector reviewed data reports, NDE reports, shop travelers, material certifications, repair records and receiving inspection reports for the following shop fabricated piping spools: Emergency Equipment Cooling Water System, Spools No.
a.
P44-3362-7 ano No. P44-3656-12.
-7-466 259
. b.
Residual Heat. Removal System, Spools No. Ell-3035-4 and No. Ell-3151-10.
c.
Core Spray System, Spools No. E21-3144-15, No. E2199-1 and E21-3150-10.
It was determined that applicable code requirements were met.
No items of noncompliance or deviations were identified.
' -8-a ,. 9-If D D ,: D
. Section II Prepared by J. Hughes Reviewed by D. W. Hayes, Chief Engineering Support Section 1 , 1.
Observation of Recent Electrical Work Activities The inspector observed the following completed or being a.
completed cable terminativas : Cable No. 243612-NA from end Cable No. 243606-NA from end Cable No. 243594-NA from end Cable No. 231767-IK from end Cable No. 231771-IK from end Cable No. 243598-NA from end Cable No. 225508-lK to and from ends The following termination characteristics were in accor-dance with the pull cards, L. K. Comstock. (LKC) Work Instruction No. 000-03-019 and Detroit Edison Specification No. 3071-128 Standard No. EA-3-1: Ca supports, color / numeric code, crimped lugs, conductors ideatified, conductors properly dressed, conductor inserted into lug at proper length, and terminal connections tight.
b.
The inspector observed the following Class IE cables in raceways - cables mentioned in Paragraph 1.a and No.
220060-2P.
The cables were properly routed in accordance with pull cards.
The raceways were free of sharp edges and grounded.
Separation criteria, identification, bend radius, and sealed cable ends were in accordance with L. K. Comstock Work Instruction No. 000-03-008 and related documents.
No items of noncompliance or deviations were identified.
9_ A66 'o} n/
. 2.
Record Review of Recent Electrical Work Activities a.
The inspe -t or reviewed the following records concerning ine above mentioned observed installations: (1) Cable Pull Cards and Cab'e Pull Checklists (LKC Form No. 37) for cables No. 243612-NA, 243606-NA, 231767-1K, 231771-1K, 243598-NA, 225508-1K, and 220060-2P.
, (2) Instrument Cable Termination Inspection Checklist (LKC Form No. 36) for cables mentioned in Paragraph 1.a.
The records identified the QC inspector, the type of observation, the governing documents, the results, the acceptability, and action taken in connection with noted deficiencies. The records were identifiable and retrievable.
b.
The inspector reviewed the following pertaining te Field Modification Request (FMR): (1) FMR Nos. 23, 24 and 801, internal wiring to the 4160V switchgear bus.
(2) FMR Nos. 17, 18 and 666, internal wiring to the 4160V switchgear bus.
(3) FMk Nos. 39, 45, 42, 43, 671 and 673, internal wiring to the 4160V switchgear bus.
(4) FMR No. 286, internal wiring to the Main Control Room Panel Inserts (H11-P8108510).
(5) FMR No. 273, internal wiring to the Main Control Room Panel Insert (H11-P806A501).
FMRs were inspected and signed off by the LKC QC inspector as evidenced by the QC inspectors stamp, signature and date.
3.
Review of Electrical Cable Procurement Records The inspector reviewed the documentation available at the site for Okonite and Rockbestos cable. The review included the following: - 10 - [[ h h bL
. a.
Okonite cable (1) Receiving Inspection Report (RIR) 3-8-79-7.
(2) DECO specification No. 3071-80.
(3) DECO purchase order IE92105 Change 5.
' (4) Production test results.
(5) Certificate of Conformance dated February 22, 1979.
(6) Okonite Engineering Report No. 141 for radiation.
(7) Okonite Engineering Report li 231 for Vcrtical Flame Test.
(8) Moisture absorption test.
(9) Ozone and discharge resictance measurements per IPCEA Specification 5-19-81.
(10) Aging and LOCA profile testing.
b.
Rockbestos Cable (1) RIR-3-14-79-3.
(2) DECO specification No. 3071-80.
(3) DECO purchase order 1A79052.
(4) Qualification of Firewall III Class IE Electric Cables which included, aging, radiation, immersed in water, LOCA profile per IEEE-323.
4.
Other Areas Inspected a.
The inspector observed removal of non-safety related insulation blanket material, which was installed on the Control Room HVAC system duct work.
The type of material specif.ed on the bill of material called for a density of
3 6 lb/ft in lieu of 75 lb/ft which was the actual type installed. The inspector examined the safety related equipment in the adjacent and areas below the insulation removal which would be affected by dust and particles, etc.
The equipment was adequately protected during the removal operation.
- 11 - i n/, 46b In]
. b.
During tour of the Plant, the inspector observed several divisional cable trays containing dirt, debris, scrap and micellaneous hardware Prior to the exit interview, the inspector was presented by the licensee a quality control surveillance report (DIC) No. E-3287 dated May 3, 1979, for corrective action to take care of this matter.
No items of noncompliance we e identified.
, - 12 - 466 '> 6 4
. ' Section Ill Prepared by H. M. Wescott Reviewed by R. C. Knop, Chief Projects Section - 1.
Independent Inspection The inspector reviewed all 50.55(e) reports to ascertain a.
that the licensee's review and report are adequate.
The results were as follows: Initial Interim item Report Report Final Report (1) Torus Design Telecon EF2-39,015 Determined not Deficiency 11-2-77 11/13/77 reportable by licensee EF2-40,441 11/18/77 (2) Penetration Drop Telecon FF2-41 094 Determined not 2/16/78 3/10/78 reportable by licensee EF2-41,094 3/10/78 (3) Cable Jacketing Telecon EF2-41,417 Determined not 2/22/78 3/22/78 reportable by licensee EF2-42,507 4/19/78 (4) Fuel Pool Fire Telecon EF2-S8,301 Determined not 3/20/78 3/23/78 reportable by licensee EF2-S8,302 3/23/78 (5) Shroud Drop Telecon EF2-42,680 Closed by licen-7/12/78 8/12/78 see EF2-42,965 6/7/78 (6) Damaged B. I. N.
Telecon Telecon Determined not Cable 7/12/78 8/12/78 reportable by licensee - 13 - fo6 2oD r /- t
. (7) Core Sfray Pump Telecca EF2-44,160 Determined not Impeller 8/28/78 9/25/78 reportable by licensee EF2-44,330 10/25/78 (8) Torus Ring Beam Telecon EF2-44,333 Open Weld Indica-10/3/78 11/3/78 tiens EF2-45,006 , 12/1/78 EF2-44,330 10/25/78 EF2-44,020 2/15/79 (9) Conax-Kulka Telecon EF2-43,636 Open Terminal Block 11/21/78 12/20/78 (10) Core Spray Pump Tulecon EF2-46,125 Open Motor (Pump) 2/23/79 3/22/79 (11) RHE Heat Ex Telecon EF2-44,360 Relief Valve 2/5/'9 3/2/79 Capacity Defi-Closed ciency (12) Deformat;on of Telecon Report made Containment 6/9/72 prior to exis-Dryvell Vessel tence of T50.55e (13) Reactor Pressure Telecon EF2-20,143 EF2-30,998 Vessel Flange 8/27/73 9/26/73 5/2/75 Distortion Closed (14) Cracks in Reac-Telecon EF2-4933 EF2-29,537 tor Bldg. Base 4/14/72 5/12/72 11/8/74 Slab Closed (15) Reactor Pressure Telecon EF2-20,173 Closed per Vessel Rework 4/25/73 9/21/73 item (13) (16) Schreiber Steel Telecon Open NDE 4/12/79 (17) Arc Strikes Telecon Closed 4/21/77 Telecon EF2-35,989 5/20/77 - 14 - 466 266
. This area of the inspection remains open pending review by the inspector to verify that acticas taken to close out the reports are adequate, b.
The inspector reviewed pipe sketches and documentation to establish that the requirements of the ASME Boiler and Pressure Vessel Code W-71 were met, as follows: ' (1) Review of Daniels International Receiving Inspection Report 12- /7-6B.
(2) Sketch No. E-2734-426, Spool No. E-41-4361-14.
The inspector could not determine that the requirements of NB-4223.1 Minimum Wall Thickness and NB-4223.2 Ovality Tolerence for pipe bending were met.
This item is unresolved pending further review by the inspector of piping records to identify pipe that require the above measurements.
(341/79-12-01) Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliaise or deviations.
An unresolved item disclosed during the inspection is discussed in Section III, Paragraph 1.b.
Exit Interview The inspectors met with site staff representatives (denoted in the Persons Contacted paragraph) at the conclusion of the inspection on May 4, 1979.
The inspectors summarized the scope and findings of the inspection.
The licensee acknowledged the findings.
The ir.spector learned that the scheduled fuel load date is being changed to a later date.
The new dated could not be established during this inspection.
The licensee stated that RIII would be notified by telephone as to the new fuel load date.