Forwards IE Insp Rept 50-341/79-12 on 790501-04.No Noncompliance Noted
ML19241C015
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/07/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19241C016 List:
References
NUDOCS 7907260160
Download: ML19241C015 (2)


See also: IR 05000341/1979012

Text

TIC

.

[pa af Gg

UNI T E D STATES

%,

NUCLEAR REGULATORY COMMISSION

yr

i

p,

HEGloN lit

E

$!

o, k' ' ~[,E

.

799 ROOSE VE L T ROAD

'

CLEN El LYN BLUNots 601U

gm

.....

JUN 7

1979

Dockc-t No. 50-341

The Detroit Edison Company

ATIN:

Mr. Edward Hines, Assistant

-

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI

48226

Gentlemen:

This refert to the inspection conducted by Messrs. H. M. Wescott,

J. Hughes and E. W. K. Lee of this office, on May 1-4, 1979, of

activities at Enrico Fermi Nuclear Station, Unit 2, authorized by

NRC Construction Permit No. CPPR-87 and to the discussion of our

findings with you and others of your staff at the conclusion cf the

inspection.

The enclosed copy of our inspection report identifies areas examined

during tne inspection. Within these areas, the inspection consisted

of a selective examination cf procedures and representative records,

o b s e rva t.: nn s , and interviews with personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of T ractice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's

Public Document Room, except as follows.

If this report contains

information that you or your contractors believe to be proprietary,

you must apply in writing to this office, within twenty days cf your

receipt of this letter, to withhold such information from public

disclosure.

The application must include a full statement of the

reasons for which the information is considered proprietary, and

should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

-

-

79072 60;60

__

2,1

a

.

JUN 7

bib

I

The Detroit Edisom ComIany

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

-

~

f$.

.

Gaston Fiorelli

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-341/79-12

cc w/ encl:

Central Files

Reproduction Unit Nhc 20b

PDR

Local PDE

NSIC

Tlc

Ronald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr.,

Attorney

466

252