IR 05000335/1989003

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/89-03 & 50-389/89-03 on 890221-0303.No Violations or Deviations Identified
ML17223A130
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/04/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17223A131 List:
References
NUDOCS 8905190245
Download: ML17223A130 (5)


Text

D]STKBUTION DEMONSTRATION SYSTEM RlCGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS).

ACCESSION NBR:8905190245 DOC.DATE: 89/05/04 NOTARIZED:

NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

Ig 50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION Q

LIANPC.A.

Region 2, Ofc of the Director ECIP.NAME RECIPIENT AFFILIATION CONWAY,W.E.

Florida Power

& Light Co.

SUBJECT:

Forwards Insp Repts 50-335/89-03

& 50-389/89-03 on 890221-0303.No Violations or deviations identified.

DOCKET N

05000335 05000389 DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTR J

"NCL ~

SIZE: d+ leL TITLE: General (50 Dkt)-Insp'Rept/Notice of Violation Response NOTES:

RECIPIENT ZD CODE/NAME PD2-,2 PD

"INTERNAL: ACRS AEOD/DEZIB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB 10, NRR/PMAS/ZLRB12 OE L~B N J F1LE, EXTERNAL: LPDR NSIC COPIES LTTR ENCL

1

2

1

1

1

1

2

1

1

1

1

1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DLPQ/PQEB NRR/DREP/EPB

NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2

, FILE

NRC PDR COPIES LTTR ENCL

1

1

1

1

1'

1

1

1

1

'

1 NOIX 'IO ALL "RIDS" RECIPIHfIS'LEASE HELP US IO REDUCE HASTEl CONZACZ 'IHE DOCUMENI'XNHKILDESK RQCN Pl-37 (EXT. 20079)

IO ELZKIMZB YOUR MME FKH DZSTRZBUTZQN LZSTS FOR DOCUMENIS YOU DGNiT NEEDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

MAV O4$8S Docket Nos. 50-335, 50-389 License Nos.

DPR-67, NPF-16 Florida Power and Light Company ATTN:

Mr.

W.

F.

Conway Senior Vice President

- Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-335/89-03 AND 50-389/89-03 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by N.

Economos on February 21 - March 3, 1989.

The inspection included a review of activities authorized for your St. Lucie facility.

At the conclusion of the inspection, the findings were discussed with those members of your sta f identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's

"Rules of Practice,"

Part 2,"

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Enclosure:

Inspection Report cc w/encl:

(See page 2)

Caudle A. Julian, Chief Engineering Branch Division of Reactor Safety g9Pg>9 g 05~00~~

4S e<~"SSS pQR

MAY 04 198S Florida Power and Company cc w/encl:

K.:N. Harris, Vice President St. Lucie Nuclear Plant G. J. Boissy, Plant Manager J.

B. Harper, gA Superintendent State of Florida bcc w/encl:

NRC Resident Inspector Document Control Desk C,

~j conomos:td

/g a/89 lake Og/g 7/89 R1