IR 05000335/1989002

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-335/89-02
ML17222A769
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/19/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8904280116
Download: ML17222A769 (2)


Text

AC CELE PATED D1SIR1B 1'T1 04 DE M04 STRATI0.'i SYSTEM

~

~

~

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8904280116 DOC.DATE: 89/04/19 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION JULIAN,C.A.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.

Florida Power S Light Co.

SUBJECT:

Ack receipt of util 890403 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-335/89-02.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTR 2 ENCL 0 SIZE:

(

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

DOCKET P1 05000335 INTERNAL:

EXTERNAL:

RECIPIENT ID CODE/NAME PD2-2 PD ACRS AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB

NRR/PMAS/ILRB12 OE~IEBERMAN,J

~~G~

LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME NORRIS,J AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB

NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE

NRC PDR COPIES LTTR ENCL mrs m ALL ~'RIDSii RECIPIZNrs:

PLEASE HELP US 1Q REDUCE HASTE ~CT QK DOCUMENT CONTROL DESKI RXM Pl-37 (EXT. 20079) K) EZZK2KVE KÃlR NAME PKK DZSTEUBUTION ZZPTS FOR DOCUMENIS YOU DON'T NEZDf O

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL D

S

APR 19 lS89 Florida Power and Light Company ATTN:

Mr.

W. F.

Conway Senior Vice President - Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-335/89-02 Thank you for your response of April 3, 1989, to our Notice of Violation issued on March 3, 1989, concerning activities conducted at your St. Lucie facility.

We have evaluated your response and found that it meets the requirements of

CFR 2.201.

We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, Caudle A. Julian, Chief Engineering Branch Division of Reactor Safety cc:

K. N. Harris, Vice President St. Lucie Nuclear Plant G. J. Boissy, Plant Manager J.

B. Harper, Site gA Superintendent State of Florida bcc:

NRC Resident Inspector DRS Technical Assistant RII PF'n:td

7/89 RII nl p4/)g/89 RII JCr le jak omah)/89 8904280ii6 890419 PDR ADOCK 05000335 lg PDC