ML20053B150

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-335/82-13 & 50-389/82-15 on 820412-16.No Noncompliance Noted
ML20053B150
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/03/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20053B151 List:
References
NUDOCS 8205280119
Download: ML20053B150 (2)


See also: IR 05000335/1982013

Text

,

ff h 4)

/

.-

<-

WU' , 3 1932

Florida Power and Light Company

ATTN: Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject: Report Nos. 50-335/82-13 and 50-389/82-15

This refers to the routine safety inspection conducted by Mr. R. L. Fiedler of

this office on April 12-16, 1982, of activities authorized by NRC Operating

License No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie

facility and to the discussion of our findings held with Mr. C. M. Wethy, Plant

Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclo_ad inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

~

s

.

Enclosure (See Page 2)

C

8205280Ilr %

TGo):/

-

.

.

.

.

1982

Florida Power and Light Co.

2

Enclosure:

Inspection Report Nos. 50-335/82-13,

50-389/82-15

cc w/ encl:

C. M. Wethy, Plant Manager

N. Weems, Assistant QA

Construction Manager

B. J. Escue, Plant Manager

bcc w/ enc 1:

Document Management Branch

State of Florida

NRC Resident Inspector

RII

RII

RII

RII

RII,'

RII

XCf-

fh

ARHhr\\\\-f'd t

.

k

din

HC[ance

!'

RLFiedler:es

FJa >

KDLa dis

4/p/82

4

'82

4/U82

4/p/82

44j,/82

4/ o/82

$