UNITEDSTATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Report No. 50-335/33-35 Licensee:
Florida Power and Light Company 9250 West Flagler Street Miami, FL 33101 Facility Name:
St.
Lucie Unit 1 Docket No. 50-335 Iicense No. DPR-67 Inspection at St.
cie near Ft. Pierce, Florida Inspector:
S. A. El Approved by:
R.
. Hartin, Section Chief, RONS Branch a
e e
snmav Inspection on September 4-7, 1980
)as Inspected This routine, unannounced inspection involved 28 inspector-hours on site in the areas of Bulletin, Circular, and Information Notice Review, review of items from previous inspector reports, and review of plant operations.
Results Of the three areas inspected, no items of noncompliance or deviations were identifie DETAILS 1.
Persons Contacted Iicensee Employees C.M. Methy, Plant Manager J. E. Bowers, Maintenance Superintendent M. B. Vincent, Assistant Plant Superintendent - Electrical C. A. Veils, Operations Supervisor
- O. D. Hayes, Nuclear Plant Supervisor Other licensee employees contacted included technicians, operators, mechanics and security force members.
+Attended exit interview 2.
Exit Interview
'he inspection scope and findings were summarized on September 7,
1980 with those persons indicated in Paragraph 1 above.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
IE Circulars The following IE Circulars have been reviewed to determine whether they had been received by station management, reviewed for applicability and appro-priate action had been taken or planned.
IEC 80-19 (Closed)
Noncompliance with Licensee Requirements for Medical Licensees.
This circular is not applicable to St. Lucie.
IEC 80-20 (Closed)
Changes in safe-slab tank dimensions.
This circular is not applicable to St. Iucie.
IEC 78-08 (Closed)
Environmental Qualitification of Safety-Related Electrical Equipment at Nuclear Power Plants.
This circular is administratively closed based on inclusion in IE Bulletin 79-01B of the concerns raised in IEC 78-08.
IEC 76-06 (Closed)
Stress Corrosion Cracks in Stagnant I,ow Pressure Stain-less Piping Containing Boric Acid Solution at PVRs.
This circular is administatively closed based on inclusion in IE Bulletin 79-17 of the concerns raised in IEC 76-'0 No items of noncompliance or deviations were identified in this area.
IE Information Notices The following IE Information Notices were reviewed to ensure their receipt and review by appropriate management.
IE Notices are considered closed upon receipt and review IEN 80-06 (Supplement 1) " Notification of significant events of operating power reactor facilities.
IEN 80-26 - Evaluation of contractor QA program IEN 80-27 - Degradation of reactor coolant pump studs IEN 80-28 - Prompt reporting of required information to NRC IEN 80-29 - Broken studs on Terry turbine steam inlet flange IEN 80-31 - Maloperation of Gould-Brown Boveri Type, 480 volt, type K-600S and K-DON 600S circuit breakers The following IE Information Notices were not sent to St. Iucie.
They are closed and not applicable.
IEN 80-25 - Transportation of Pyrophoric Uranium IEN 80-30 - Potential for unacceptable interaction between the control rod drive scram function and non-essential control air at certain GE BMR facili-ties.
IEN 80"33 - Determination of Teletherapy Timer Accuracy IE Bulletins The following IE Bulletins were reviewed to determine whether they had been received and reviewed by appropriate management, responses, where necessary were accurate and complete, and that action taken was complete.
(Closed)
IEB 79-13 (including Revisions 1 and 2), Cracking in Peedwater System Piping.
This Bulletin is closed based on licensee responses dated July 11, 1979 and October 29, 1979 as well as inspections documented in inspection reports 50-335/79-25, 50-335/79-34 and 50-335/80-10.
Any items of noncompliance, unresolved items, etc.,
associated with this Bulletin have been resolved.
(Closed)
IEB 77-05 and 77-05A, Electrical Connector Assemblies.
This Bulletin is administratively closed based on the inclusion in IEB 79-01B of the concerns expressed in IEB 77-05 and 77-05A.
The four connectors iden-tified at St.
Iucie in response to IEB 77-05 and 77-05A are identified as items 13 I 1, 2, 3, and 4 in licensee responses to IEB 79-01 No items of noncompliance or deviations were identified in this area.
8.
Applicability of Florida Power and Light Company Topical equality Assurance Report to St. Iucie Unit 1 Inspection Report Q8-02 addressed the actions being taken at that time by the Florida Power and Light Company to make the company Topical Quality Assurance Report (FPLTQARl-76A) applicable to St.
Lucie Unit l.
At that.
time, quality assurance requirements for St.
Lucie were included in chapter 17.2 of the Final Safety Analysis Report.
Subsequently, Florida Power and Iight letter L-80-46 of February 6, 1980 committed St.
Lucie Unit 1 to FPLTQAR1-76A. Inspector Followup Item 78-02-02 is closed.,
No items of noncompliance or deviations were identified in this area.
9.
Review of Plant Operations The inspector kept informed on a daily basis of the overall plant status and significant safety matters related to plant operations.
Discussions about planned safety related activities were held frequently with various members of the plant management and operations staff.
Selected portions of current plant operating logs and data sheets were reviewed during this report period.
J The inspector conducted several tours of plant areas.
Observations were made of work in progress, of plant housekeeping, and vital area controls.
No items of noncompliance or deviations were identified in this area.