IE Insp Rept 50-335/80-09 on 800408-10.No Noncompliance Noted.Major Areas Inspected:Installed Equipment Review Per IE Bulletin 79-01B
ML17208A693
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/29/1980
From: Conlon T, Ruff A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17208A692 List:
References
50-335-80-09, 50-335-80-9, IEB-79-01B, IEB-79-1B, NUDOCS 8006130038
Download: ML17208A693 (3)


Text

~R RECII

~4

~o ce o

I

%00

++*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 APR 30 1980 Report No. 50-335/80-09 Licensee:

Florida Power and Light Company 9250 West Flagler Street Miami, FL 33101 Facility:

St. Lucie Nuclear Station Docket No. 50-335 License No. DPR-67 Inspection at St. Lucie site near Fort Pierce, Florida

~~

Inspector:

A. B. Ruff Approvedb~

T. E.

onion, Section Chief, RCES Branch P

ate i ned Date Signed summ Inspection on April 8-10, 1980 Areas Inspected This special, announced inspection involved 16 inspector-hours on site in the areas of installed equipment review with respect to IE Bulletin 79-01B.

Results Of the areas inspected, no items of noncompliance or deviations were identified.

80061SDO3+ 9

)

~

~

~ (:l, rI)

DETAILS 1.

Persons Contacted Licensee Employees

"C. M.

-A. M.

-L. L.

"E.

G.

G.

M.

Wethy, Plant Manager Anderson, QA Operations Craig, Electric Power Production, Corporate Office Becker, QC Engineer Vaux, QC Supervisor

"=Attended exit interview.

2.

Exit Interview The inspection scope and findings were summarized on April 10, 1980, with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not 'ideatZfi'edduring this inspection.

5.

IE Bulletin 79-01B A physical examination, in the area of environmental qualification, was made on electrical instrumentation and components associated with the reactor coolant system.

The equipment that was examined is located inside the reactor building and is listed below.

Instrument Number Cable Number Electrical Penetration Number PDT"llllA, B, C 6 D PT-1102A, B, C 6 D PT"8013A, B, C 8 D LT-9013A, B, C 6 D 10385A~

6A~

7A~ 8 8A C10>

B5 ~ E7 ~ 6 Cl 10372A, 3A, 4A, 8 5A C10, B5, E7) 6 Cl 10378K~ F j G~ 6 H

~

C10~

B5~ E7~ 6 Cl 10376C~

F~

J~ 8 R C10>>

B5~ E7~

Sr Cl The environmental qualification document review for this equipment will be made during a future inspection after receiving St. Lucie s response to IE Bulletin 79-01B.

Within the areas examined there were no items of noncompliance or deviation identified.