Text
~pS RKgy 3+
pp 0O
!
%0
+**++
Reply Refer To:
I:VLB 50-250/80-28 50-251/80-27
- 35/80-28 50"389/80-UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Dcy Dp 1980 CV mc C/l
~5
~<8 cn~
<<CQ Florida Power and Light Company ATTN:
R. E. Uhrig, Vice President Advanced Systems and Technology P. 0. Box 529100 Miami, FL 33152 Gentlemen:
This refers to the inspection conducted by V. L. Brownlee of this office on August 27-29, 1980, of activities authorized by NRC Operating License Nos.
DPR-31, DPR-41, DPR-67 and Construction Permit No.
CPPR-144 for the Turkey Point and St. Lucie facilities, and to the discussion of our findings held with Messrs.
C. M. Wethy and B. J. Escue at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
~
~
~
~
~
~
enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified enforcement matters.
These are discussed in the enclosed inspect report.
In accordance with Section 2.790 of the NRC's
"Rules of Practic ", Part 2, Title 10, Code of Federal Regulations, a
copy of this letter and the enclosed inspection report will be placed in the NRC s Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report willbe placed in the Public Document Room.
~y'
v
~ It
L I,
RT1i4
Florida Power and Light Company-2" OCT OB ~seg I
~
~
~
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, C. E. Murp y,~
ef Reactor Con&ruction and Engineering Support Branch
Enclosure:
Inspection Report Nos. 50-250/80-28, 50-251/80-27, 50-335/80-28 and 50-389/80-ll
REGION II==
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Report, Nos. 50-250/80-28, 50-251/80-27, 50-335/80-28, and 50"389/80-11 Licensee:
Florida Power
& Light Company 9250 Vest Flagler Street Miami, FL 33101 Facility Name:
Turkey Point Units 3 and 4 and St. Iucie Units 1 and 2 License Nos. DPR-31, DPR-41, DPR-67, and CPPR-144 Inspection at:
Florida Power
& Xight Company's General Offices Miami, Florida Turkey Point Units 3 and 4 near Homestead, Florida St. Lucie Units 1 and 2 near Fort Pierce, Florida Inspector:
U. L.
rownlee Approved b
~
T. E. Conlon, Section Chief, RC&ES Branch ate igned p'o Date Signed SUMMARY Dates of Inspection:
August 27-29, 1980 Areas Inspected:
This special, unannounced management inspection involved
inspector-hours at the General Offices and onsite in the area of followup of noncompliance relative to 10 CFR Part 21 procedures.
Results Noncompliances 389/79-22-01, 250/79-35-01, 251/79-35-01, and 355/79-33-01,
"10 CFR Part 21 procedures" are close Persons Contacted DETAILS W.
R.
D.
R.
R.
J.
M.
H.
-C.
"B.
N.
'l E A.
W. Woodward, QA Engineer, General Offices F. Englemeier, Assistant QA Manager, General Offices W. Jones, Site QC, Turkey Point G. Garret, Security Officer, Turkey Point Cook, QC Department, Turkey Point C. Musser, Stores Supervisor, Turkey Point Fowler, Area Stores Supervisor, Turkey Point E. Yaeger, Plant Manager, Turkey Point M. Wethy, Plant Manager, St. Lucie
J. Eacue, Plant Manager, St. Lucie 2 T. Weems, Site QA Manager, St. Lucie 2 W. Sherman, QA Engineer, St. Iucie 2 Anderson, QA, St. Iucie
-Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on August 29, 1980 with those persons indicated in Paragraph 1 above.
I.icensee Action on Previous Inspection Findings (Closed)
Infraction 250/79-35-01, 251/79-35-01, 335/79-33-01 and 389/79-22-01,
"10 CFR Part 21 Procedures".
The inspector reviewed FPSL's letters of response dated January 18, 1980, March 21, 1980, May 1, 1980 and July 30, 1980; reviewed the revised procedure as identified in the letters of response and held discussions with responsible General Office and site personnel regarding Part 21 evaluation and reporting requirements.
The previously identified items of noncompliance related to Part 21 control-ling procedures and procedure implementation are adequately resolved, or, are in the final stages of resolution.
The responsible personnel interviewed at the General Offices and sites were quite knowledgeable of Part 21 evaluation and reporting requirements.
That work remaining to be corrected at the sites is:
1) Completing the review of previously reported items relative to Part 21.
This matter is punch listed and expected to be completed by October 31, 1980; 2) Finalize the training program for Part 21 implementation; and 3) More clearly define areas of responsibility for Part 21 reviewing in the site procedures and instructions.
These matters were sufficiently completed and the inspector concurs with the FPM proposed corrective actions.
The inspector has no further questions regarding this matter.
0'nresolved Items
-
--'.-=-"=-=-*
Unresolved items were not identified during this inspectio W I
k