IR 05000335/1979029
| ML19260A656 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/13/1979 |
| From: | Moore D, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19260A654 | List: |
| References | |
| 50-335-79-29, NUDOCS 7912030053 | |
| Download: ML19260A656 (1) | |
Text
I.'f,Tr T.I.TTt.r G CD M R Wi M
[
+p"'oug Cili!II.5 7x.m.DilD:t o
UNITED STATES g
)p g
NUCLEAR REGULATORY COMMISSION
g e
REGION 11
[c
'
o 101 MARIETTA ST N.W.. SUITE 3100 4 8 k.
ATLANTA. GEORGIA 30303
.....,o NOV 131979 U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION II
Report No. 50-335/79-29 Docket No. 50-335 License No. DPR-67 Licensee: Florida Power and Light Company 9250 West Flager Street Miami, Florida 33101 Facility Name:
St. Lucie, Unit 1
'
Inspection at:
St. Lucie County Inspection conducted: October 2.'-25, 1979 Date of Last Physical Security Inspection Visit: April 23-26, 1979 Type of Inspection: Unannounced Physical Security
_ C (C2ew,
s////W Inspecto
~D. E Mo6Ye
_
Date Approved by: I/
f/ 5 /
,m_
_f W. J. 'Tobih, /A1Ftihg'Section-hief, Safeguards Branch D'atd'
~~
.
Inspection Summary Areas Inspected:
Included review of access control (identification, authoriza-tion, and badging), testing / maintenance, power supply, locks / keys, records /
reports and licensee action on previous inspection findings.
The inspection involved 20 inspector hours on site by one NRC inspector. The inspection was begun during an offshift period of which 2 inspection hours were accomplished.
Results: The licensee was found to be in cortpliance with NRC requirements within the 5 areas examined.
1464 299 S-r2 79
- /oqp Copy of Copies
Pnces This Dec -
7^. ir rot to ha recroduced uM' m' D acific approval c Ir :II MATERIAL.TCf,"GT3 RERTITil COMTIEE 2.7;3 EfUi"MTl]!1 7 912030 C)f3
'