IR 05000327/1989001

From kanterella
Jump to navigation Jump to search
Forwards Summary of 890505 Meeting Re SALP Repts 50-327/89-01 & 50-328/89-01.Util Denial of Violation Being Reviewed by NRC
ML20246A764
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/23/1989
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8907070080
Download: ML20246A764 (26)


Text

_ -

=

    • "%'o 1?

UNITED STATES

,y g

NUCLEAR REGULATORY COMMISSION v

E WASHINGTON. D. C. 20$55

';

e,

f r

,

%,..../

June 23, 1989 Docket Nos. 50-327 L

and 50-328

.

.

Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

Dear Mr. Kingsley:

SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)

(NRC INSPECTION REPORT NOS. 50-327/89-01AND50-328/89-01)

This refers to the NP.C's Systematic Assessment of Licensee Performance (SALP)

for your Sequoyah facility which was sent to you on April 14, 1989; our meeting of May 5,1969 at which we discussed the report; and your written comments dated May 31, 1989.

We appreciate your response to the items identified in the SALP report. We note that you have denied violation 50-327,328/89-05-04, pertaining to two auxiliary unit operators unknowingly working in a high radiation area. As discussed in the letter from Mr. Bruce A. Wilson to Mr. Oliver D. Kingsley, dated May 15, 1989, your denial of the violation is being reviewed by the.

NRC.

We will monitor the implementation of the SALP Improvement Program during future inspections.

I have enclosed a sumary of the meeting and the slides which were used by the NRC, a copy of your written comments, and the Final SALP report for the period February 4, 1988 - February 3, 1989.

In accordance with Section 2.790 of the NRC's " Rules of Practice " Part 2, Title 10, Code of Federal Regulations, a copy of this letter with the

.

reference enclosures will be placed in the NRC's Public Document Room, l

l I

l l

lh 1'

s907070080 890623

i gh(

PDR ADOCK 05o00327 j

o PDC

_ _ _ _ - - _ - -. - - - _ - - -

~j

_ _ _ _ _ _ _ _ _. _ _ _ _ _

-_

1, s.:

,

>

s Mr. 011ver'D. Kingsley, Jr.

-2-June 23,1989

No reply to this letter is required; however, should you have any questions concerning these matters I will be pleased to discuss them with you.

'

Sincerely,

.

l w Af.

l

'

Dennis M. Crutchfield, A ociate Director for Special Projects Office of Nuclear Reactor. Regulation

Enclosures:

1.

SALP Presentation Meeting Summary and Slides-2.

Licensee Response 3.

Final SALP Report

Inspection Report

IR

-

Independent Safety Engineering Group

ISEG

-

Inservice Inspection

ISI

-

Inservice Testing

.IST

-

Limiting Condition for Operation

LCO

-

Licensee Event Report

LER

-

Microbiological 1y Induced Corrosion

MIC

-

Multiple Integrated Laser Engagement System

MILES

-

Motor Operated Valve Actuators

MOVAT

-

Main Steam Isolation Yalve

MSIV

-

Nuclear Maintenance Review Group

imRG

-

Notice of Unusual Event

NOUE

-

,

Nuclear Regulatory Commission

NRC

-

Nuclear Reactor Regulation

NRR

-

Nuclear Safety Review Board

NSRB

-

Over Power Delta Temperature

OPDT

-

Office of Special Projects

OSP

-

Over Temperature Delta Temperature

0 TDT

-

'

Preventive Maintenance

PM

-

Post Modification Testing

PMT

-

Plant Operations Review Committee

PORC

-

Pressurized Water Reactor

PWR

-

Quality Assurance

QA

-

.

. Qualified Maintenance Document System

QMDS

-

Quality Verification Inspection

QVI

-

RII

Region II

-

Radiation Controlled Area

RCA

-

Reactor Coolant Systee

RCS

-

Residual Heat Removal

RHR

-

Replacement Items Program

RIP

-

L

l

r!

- _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _.

. _ _ - _ _ _ _ _ _ _ - _ _ _ _ _

%

..

)

i

.

Resistance Temperature Device

RTD

Systematic Assessment of Licensee Performance

j

-

SALP

-

Steam Generatort Owners Group

j

SGOG

-

Surveillance I.4truction

SI

-

Sequoyah Nuclear Performance Plan

SMPP

-

System Operating Instruction

501

-

Temporary Alterations

TACFs

-

Turbine Driven Auxiliary Feedwater Pump

TDATW

-

Technical Specifications

TS

-

Technical Specification Change Request

TSCR

-

Tennessee Valley Authority

TVA

-

TVA Projects Division (NRC)

TVAPD

-

>

Upper Head Injection

UHI

-

Volume Control Tank

VCT

-

,

.I

i

!

-

)

k

.

<

.

!

f

l

l

r

,

1