Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/88-06 & 50-328/88-06.Response Appears to Contradict Info Contained in Previous Repts
ML20151V174
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/19/1988
From: Barr K
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8805020315
Download: ML20151V174 (2)


Text

. . . _

, - N h<

APR 19 M88 P

Docket Nos. 50-327, 50-328 License Nos. OPR-77, DPR-79 Tennessee Valley Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/38-06 AND 50-328/88-06 Thank you for your response of March 30, 1988, to our Notice of Violation issued on March 1, ~ 1988, concerning activities conducted at your Sequoyah facility. With regard to your response to violation 88-06-01, your reason for the violation appears to contradict information contained in inspection report-327, 328/87-66. As discussed in inspection report 327, 328/87-66, paragraph 3d, a meeting was held during the October 19-30, 1987 inspection to discuss the issue of qualification for personnel involved in the system alignment proces .The - meeting was attended by the Operations Superintendent, Operations Group Manager, and other management involved in the system alignment program. Your staff stated that being a TVA auxiliary unit operator (AV0) along with having completed site specific training on all Sequoyah procedures pertaining to system alignment was considered the minimum acceptable qualification level _ for individuals performing independent verification for the system alignment program. In addition, the inspectors pointed out that since Sequoyah was using personnel other than those certified at Sequoyah, some documentation of the certification was necessary. Your staff accomplished this prior to the exit on October 30, 1987. Your response appears to have not taken these discussions into account and therefore does not fully address the reason for the violatio Please provide a supplemental response within 30 days of the date of this letter to clarify the reason for the violatio With regard to your response to violation 88-06-03, your corrective steps that have been taken appear to contradict information presented by your staff during the inspection, and summarized in the inspection report. The results of your inspection of the 1E electrical panels completed on January 16, 1988, were reviewed during the inspection and summarized in paragraph 6.b.(5) of the repor This summary indicates that as many as six loose items were not removed due to their close proximity, to power. While your response indicates that all were removed during the January 16, 1988 inspection. Please provide a supplemental response within 30 days of the date of this letter which clarifies whether the additional six items have now been remove '

gDR ADOCK 05000327 PDR \

. --

_ - _ _ _ _ _ - _ _ _ _ _ - _ . _ _ _ _ _

U#

,_

<

o , ..

A R 191989 Tennessee Valley Authority 2 We appreciate your cooperation in this matte

Sincerely, ORIG lNAL $1GNED SY KENNETH P. BARR Kenneth P. Barr, Acting Assistant Director for Inspection Programs TVA Projects Division Office of Special Projects cc: H. L. Abercrombie, Site Director Sequoyah Nuclear Plant J. A. Kirkebo, Director, Nuclear Engineering R. L. Gridley, Director Nuclear Safety and Licensing M. R. Harding, Site Licensing Manager TVA Representative, Rockville Office bec: S. D. Ebneter, OSP S. D. Richardson, OSP G. G. Zech, OSP B. D. Liaw, OSP W. S. Little, OSP/RII F. R. McCoy, OSP/RII R. E. Carroll, OSP/RII J. B. Brady, OSP/RII J. Rutberg, OGC NRC Resident Inspector DRS Technical Assistant NRC Document Control Desk State of Tennessee RII RQ