IR 05000321/1981025

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-321/81-25 & 50-366/81-25 on 811005-09.No Noncompliance Noted.Major Areas Inspected:Security Plan, organization-mgt,organization-personnel & organization- Response.Details Withheld (Ref 10CFR2.790)
ML20032C951
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/26/1981
From: Hall B, Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20032C944 List:
References
50-321-81-25, 50-366-81-25, NUDOCS 8111130240
Download: ML20032C951 (1)


Text

MATERll TRANSMITTED HEEEYSTH

.

.,

CONTA!NS 2.7S0(G SAFEGUARDS lhf0RMATl0N -

  1. p =3g UNITED STATES

o,i NUCLEAR REGULATORY COMMISSION

$

E REGION 11 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 s

OCT 2 81881

Report Nos. 50-321/81-25 and 50-366/81-25 License Nos. DPR-57 and NPF-5 Licensee: Georgia Power Company 270 Peachtree Street Atlanta, Georgia 30303 Facility Name: Hatch Nuclear Plant, near Baxley, GA Inspection Conducted: October 5-9, 1981 Date of Last Physical Security Inspection Visit: July 13-17,1981 Type of Inspection:

Unannounced Physical Security M 2#4A. -

hM #24;f/fB/_

'

Inspectors:

on s..

B. Hall, Physical Security Inspector Date Signea L

y r26. N T)

_W.Tp i Ph s' cal SeciEity Inspector Dape Sigrfed

~

/D/26/J/

Approved by:_ '

_t c,

_

_~

. McGuire, Chief, Physical Security Section Bate /51gned

.

Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:

Included Site Orientation; Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnei; Security Organization-Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers-Protected Areas; Physical Barriers-Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-Protected Areas; Detection Aids-Vital Area; Alarm Stations; and Communications.

The inspection involved 64 inspector hours on site by two NRC Inspectors. The inspection was begun during a regular shift period; 10 inspection hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.

One Unresolved Item regarding key inventory was identified, (50-321/81-25-01) and (50-366/81-25-01).

s-n_ '6 l nn

-

8111130240 811028 W

f8 Copies PDR ADOCK 05000321 20-Paroc G

PDR T'tr ?cr:nt in not to u MATFRIX TMSM!TTED HTEqin

" " " ' " 10 CONIAINS 2.790(g 3;EGUARDS fufb?#Ml03 J