ML20032C943
| ML20032C943 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/28/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20032C944 | List: |
| References | |
| NUDOCS 8111130226 | |
| Download: ML20032C943 (2) | |
See also: IR 05000321/1981025
Text
-
_
_ _ _ _ _ _ _ _ - _ _ _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ - - .
.
- ~ ' '
MATERIAL TRANSMITTED HEREWlTH
CONTAINS 2390@ SAFEGUARDS INFORMATION
.f
OCT 2 81981
}ff%
j
3
Georgia Pcwer Company
g
/.TTN: Mr. J. H. Miller, Jr.
9
-
Executive Vice President
L
'
270 Peachtree Street
2
$F %
,
Atlanta, GA 30303
- C
I
Gentlemen:
\\,g
'8/
AY
Subject: Report No. b8.1-bnd 50-366/81-25
c'/j7,
C'
o
This refers to the routine safeguards inspection conducted .by Mr. B. Hall of this
l
office on October 5-9, 1981, of activities authorized by NRC Operating License
Nos. DDR-57 and NPF-5 at Hatch Nuclear Plant facility and to the discussions of
'
our findings held with Mr. M. Manry at the conclusior, of the inspection.
Areas. examined during this inspection included your physical security program as
implemented under the provisions of Title 10, Code of Federal Regulations, Part
73, " Physical Protection of Plants and Materials", and the specific requirements
of your approved Security Plan. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, performance tests, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved item. The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, activities involving safeguards and
i'
security measures are exempt from public disclosure; therefore, the enclosed
report with the exception of the cover page, which is an inspection summary, will
not be placed in the Public Document Room.
,
Should you have any questions concerning this letter, we will be glad to discuss
!
them with you.
Sincerely,
/s/
Paul J. Kellogg, Chief
Reactor Projects Branch 2
- "
S
" ""
8111130226 811028
PDR ADOCK 05000321
Reactor Project Inspection
O
Enclosures (See Page 2)
~
CONTAINS 2390M SAFEGUARDS INFORMATION
gg
_
_ -
_ - _ . _ _ _ _ - _ _ _ _ _.
O
_
.
'
MATERIAL TRANSMITTED HEREWITH
.CONTAINS 2.790'O SAFEGUARDS INFORMATION
-
' Georgia Power Company
2.
OCT 2 81981
s.
Enclosures:
1.
Inspection Report No's. 50-321/81-25
and 50-366/81-25
,(Exempt from Disclosure)'
2.
Inspection Summary
(Not Exempt)
cc w/ encl:
,
1
..
, J. T. Beckham, Vice President and
General Manager-Nuclear Generation
M. Manry,' Plant Manager
C. E. Belflower, Site QA Supervisor
bcc w/ Inspection Su;nmary:
State of Georgia
Hugh S. Jordan, Executive Secretary -
bcc w/ encl:
Document Management Branch
NRC Resident Inspector
Chief of Safeguards Branch, NMSS
,
a
,k
RII
RI
RII
g
RI
RII.
Tobin/ Hall:es DM uire
AGibson
0856 >Li
JRogge
PKe
10 $f81
10/24/81'
10,('V81
18/
Fl
10/Jy81 l,j/I
10/g81 '
...
'
MATERIAL TRANSMITTED HEREWITH
- CONTAINS 2.790'd) SAFECUARDS INFORMATION