IR 05000321/1981008

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/81-08 & 50-366/81-08 on 810323-27 & 0331-0403.No Noncompliance Noted
ML19345H454
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/15/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19345H456 List:
References
NUDOCS 8105200324
Download: ML19345H454 (2)


Text

ff0

'

e Wug a

.

  1. p c

UNITED STATES

[kjj

'#

f, NUCLEAR REGULATORY COMMISSION

E REGION 11

,/

W ifs

"g

101 MARIETTA ST N.W.. SUITE 3100

/ '

O I

{ f {f

~ h,

,-

g

,/

,

ATLANTA, GEORGIA 30303 (

APR 151981 i g t o sw

_

      • "

Georgia Power Company

  • N

/

4 /

ATTN:

J. H. Miller, Jr.

s Executive Vice President rd i

270 Peachtree Street C#

Atlanta, GA 30303 Gentlemen:

Subject: Report NosM/81-0Ihnd;;5D'~56[8508)

This refers to the routine safety inspection conducted by B. R. Crowley of this office on March 23-27 and March 31 through April 3,1981,'of activities autho-rized by NRC Operating License No. DPR-57 and NRC License No. NPF-5 for the Hatch facility and to the discussion of our findings held with T. V. Green at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-tion report will be placed in the NRC's Public Document Room. If this report

contains any information that you (or your contractor) believe to be proprietary, l

it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reascns on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary

,

information identified in the application is contained in a separate part of the document. If we do not hear from you within the specified period, the report i

will be placed in the Public Document Room.

'

i l

l t

l M *"* ?" M

.

APR 151981

.

Georgia Power Company

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely,

? ll.

R. C.

e s, Acting Director l

Division of Resident and l

Reactor Project Inspection Enclosure: Inspection Report No. 50-321/81-08 and 50-366/81-08 cc w/ encl:

W. A. Widner, Vice President and General Manager-Nuclear Generation M. Manry, Plant Manager C. E. Belflower, Site QA Supervisor