IE Insp Repts 50-321/81-13 & 50-366/81-13 on 810402.No Noncompliance Noted.Major Areas Inspected:Enforcement Actions Re Release of Contaminated Matls to Unrestricted Areas
ML20004E531
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/05/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20004E530 List:
References
50-321-81-13, 50-366-81-13, NUDOCS 8106120295
Download: ML20004E531 (2)


Text

.

f" g "'%g"o,,

'

UNITED STATES d

NUCLEAR REGULATORY COMMISSION

<,

g a

REGION 11 O[

101 MARIETTA ST N.W., SUITE 3100 g

0 %,

ATLANTA, GEORGIA 30303 o

.....

Report Nos. 50-321/81-13 and 50-366/81-13 Licensee: Georgia Power Company 270 Peachtree Street Atlanta, GA 30303 Facility Name: Hatch I and 2 Docket Nos. 50-321 and 50-366 License Nos. OPR-59 and NFP-5 Meeting in Region I f

A1 t

Georgia Approved by:

/

N P. J//Kel/A Car-* d --Thi af esident and Date Sitned'

r

-

6m7(Frojict In(pection Branch SUMMARY An enforcement meeting was held on April 2, 1981, to discuss enforcement actions concerning release-of contaminated materials to unresticted areas, the results of a special audit conducted on the circumstances concerning the isolation of drywell high pressure switches and the relative high number of reactor trips recently experienced.

.

l

!

l i

l i

!

s loe ico f75

_..

_-.

._

..

.

_.

..

__

. __

.

c'

OETAILS 1.

Personnel Attending Georgia Power Company

-

W. A. Widner, Vice President and General Manager - Nuclear Generation J. T. Beckham, Manager Nuclear Generation-H. P. Walker, Chairman Corporate Safety Review Board l

'

M. Manry, Plant Manager H. Rogers, Health Physicist, Radiochemist C. Boatright, Corporate Quality Assurance Specialist S. Ewald, Supervisor, Nuclear Training L. Gucwa, Chief Nuclear Engineer Office of Inspection and Enforcement J. P. O'Reilly, Director, Region II R. C. Lewis, Acting Director, Division of Resident and Reactor Project Inspection P. J. Kellogg, Acting Chief, Reactor Projects Branch 2, RRPI H. A. Wilbur, Section Chief, IE:HQ R. Rogers, Senior Resident Inspector Plant Hatch 2.

Management Meeting i

Georgia Power representatives summarized the findings of a special audit

'

conducted concerning the isolation of the drywell high pressure switches.

The summary included their findings with respect to the cause, of the event, the corrective actions that had been taken, and the corrective actions that were still in progress.

.

An NRC representatives discussed the enforcement aspects of this event and of a previous event concerning control of radioactive materials and their release to unrestricted areas.

A presentation was made by Georgia Power on the relative high number of reactor trips.

!