IE Insp Repts 50-321/81-05 & 50-366/81-05 on 810316-20. Noncompliance Noted:Failure to Comply W/Procedures for Control of Vital Area Key.Details Withheld (Ref 10CFR2.790)
ML20004E045
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/15/1981
From: Hill A, Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19064B213 List:
References
50-321-81-05, 50-321-81-5, 50-366-81-05, 50-366-81-5, NUDOCS 8106110045
Download: ML20004E045 (1)


Text

{{#Wiki_filter:MATDELTRANSMf1T3 HUNITH

in'ag CONTAINS 2.790INFORMATION "' , / UNITED STATES ! 4*t NUCLEAR REGULATORY COMMISSION $ ,E REGION 11 [[ 101 MARIETTA ST N.W.. SUITE 31C0 Q ATLANTA, GEORGIA 30303 +..** gG Report Nos. 50-321/81-05 and 50-366/81-05 Docket Nos. 50-321 and 50-366 License Plos. DPR-57 an< NPF-5 Licensee: Georgia Power Company 270 Peachtree Street Atlanta, GA 30303 Facility Name: Hatch Nuclear Plant Inspection at: Plant Hatch near Baxley, Georgia ' Inspection Conducted: March 16-20, 1981 Date of Last Physical Security Inspection Visit: December 15-19, 19 0 Type of Inspectior Upannounced Physical Security Inspectors: //N/ MM

  1. M/

A. Tillman,f h cil' Sic ~urity Inspector ife Sig5ed P ~%6. <. 4 at L s w(/ n A. O. Hill, Physical Securitytnspector E it Signed Approved by: e.

A I!8/ l D. R. McGuire, Chief, Physical Security Section, ' Eite Signed Technical Inspection Branch, Division of Engineering and Technical Inspection ' , ! Inspection Summary l Areas Inspected: Included review of security plan; security prc jram audit; I security organization; physical barriers (protected area); physi al barriers (vital areas); access control (identification, authorization; an badging); access control (search); access control (escorting); access con rol (vital areas); alarm stations; detection aids; communications; lighting assessment aids; power supply; response; locks, keys, and combinations; and ecords and reports.

The inspection involved 66 inspector hours on site by two NRC inspe: tors. Eight inspection hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requi ements within the 18 areas examined during the inspection except for the following.rea: Failure to comply with procedures for control of vital area key: b _ S-F2__,, Copy of Copies M _Pages This Do 2=ent is not to be reprodt :ed without specific 8106 110 d MATalAL TRANSMITTED HGNITH CONTAINS 2.790INFORMATION 8PProw of IE: }}