ML20004E044
| ML20004E044 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/15/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19064B213 | List: |
| References | |
| NUDOCS 8106110040 | |
| Download: ML20004E044 (2) | |
See also: IR 05000321/1981005
Text
taarsumnamutunwtu
g
CONTAINS 2.0INFORMATION
o,
UNITED STATES
o,,
8
NUCLEAR REGULATORY COMMISSION,
o
REGION 11
3
r
[f
101 MARIETTA ST
N.W.. SulTE 3100
q,
ATLANTA, GEORGIA 3o3o3
.....
O
APR 151981
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
Subject: Report Nos. 50-321/81-05 and 50-366/81-05
This refers to the routine safeguards inspection conducted by A. Tillman of this
office on March 16-20, 1981, of activities authorized by NRC Operating License
No. DPR-57 and NRC License No. NPF-5 at Hate., Nuclear Plant facility and to the
discussions of our findings held with C. T. Moore at the conclusion of the
inspection.
Areas examined during this inspection included your physical security program as
implemented under the provisions of Title 10, Code of Federal Regulations, Part
73, " Physical Protection of Plants and Materials", and the specific requirements
of your approved Security Plan. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, performance tests, and observations by the inspectors.
During the inspectica, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
Details of activities involving safeguards and security measures are exempt from
disclosure in accordance with 10 CFR 2.790(d). Therefore, your respunse should
be incorporated in a separate paper and referenced in your reply.
We have examined actions you have taken with regard to previously reported
unresolved matters.
The status of these items is discussed in the enclosed
report.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, activities involving safeguards and
security measures are exempt from public disclosure; therefore, the enclosures to
this lettor with the exception of the report cover page, which is an inspection
summary, will not be placed in the Public Document Room.
.
.
810 6110 OMO
MATERIAL TRANSMITTED HEE #lTH
CONTAINS 2.7N INFORMATi3N
o'
MATERIALTRANSMITTED HEREWTTX
<-
.
CONTAINS 2.790INFORMATION
,
Georgia Power Company
2
APR 151881
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sinc rcl ,
Division h Resident and
.T . La
ng
rector
l
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
(Exempt from Disclosure)
2.
Inspection Report Nos. 50-321/81-05
and 50-366/81-05
(Exempt from Disclosure)
3.
Inspection Summary
(Not Exempt)
cc w/ enc 1:
M. Manry, Plant Manager
-
C. E. Belflower, Site QA Supervisor
W. T. Widner, Vice President and
G2neral Manager Nuclear Generation
l
,
1
i
l
l
l
l
- .
MATERIALTRANSMITTED HEREWITH
CONTAINS 2.790INFORMATION.
.
.
..
- .
__
.-
.. .
-
-
- .
-
- -
-