IE Insp Rept 50-320/77-30 on 770719-22.No Noncompliance Noted.Major Areas Inspected:Work Performance & Quality Records of Installation of Electrical & Instrument Cable
ML19220B791
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/16/1977
From: Finkel A, Mcgaughy R, Narrow L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19220B783 List:
References
50-320-77-30, NUDOCS 7904270358
Download: ML19220B791 (7)


Text

.

.

U.S. NUCLEAR REGULATORY COMMIF3 ION OFFICE OF INSPECTION AND EfjF0r. CEMENT Region I Report No.

77-30

'

Docket No.

50-320

-

B License No.

CPPR-66 Priority Category

--

Metropolitan Edison Ccapany Licensee:

Box 542 Reading, Pennsylvania 19603

.

Three Mile Island 2

_,

Facility Name:

Middletown, Pennsylvania Inspection at:

Inspection conduc d:

uly 19-22,1977 Sl kl7 7

/

Inspectors:

ps f

/ date' signed (.N rew, React r Inspector

&[d4w' M E/ /A.[7 y

'

u4e

/datJ signed A. Finkel, Reactor Inspector /

da+e signed kbl%1u,(W f /h*77 Approved by:

~

cate' signed R. 'W. Mc'saughy, (biljf, Construction Projects Section, RC&ES Branch Insoection Sumary:21-24,1977 (Recort No. 50-320/77-30)

Inscection on JuneRoutine, unannounced inspection of work perfomance and Areas Insoected_:

quality records of installation of electrical and instrument cable; and The followup on Circulars and previously reported inspection findings.

inspection involved 47 inspector hours on site by two NRC inspectors and was started on Tuesday evening outside the nomal dayshift in effect at the facility.

"esults: No items of noncompliance were identified.

(

7 9 0 4 2 7 0 35f 82 282

-

Region I Form 12 (Rev. April 77)

_ -- _

.

.

.

DETAILS 1.

Persons Contacted

-

a.

Princioal Licensee Employees R. F. Fenti,.QA Auditor

  • J. Godleski, QA Engineer
  • S.

Levin, Project Engineer J. E. Wright, Site QA Manager

,

b.

United Engineers and Constructors, Inc.

-

  • D. C. Lambert, QC Supervisor
  • dt. notes those present at the exit interview.

-

The inspector also talked w'.th several other licensee employees as well as employees of the Architect-Engineer and the constructor.

,

2.

Licensee Action on Previous Inspection Findings (Closed) Unresolved Item (320/76-19-02):

Licensee audit had identi-fied nonconforming conditions in cable and raceway installation.

The inspector examined Audit Report No. GPUSC 76-14 and the Finding

-

Reports which identified the nonconforming conditions as well as the corrective actions recommended and taken.

Inspection procedures had been revised and additional inspection criteria provided; installation requirements had been revised; and, the nonconforming

-

conditions had been corrected or in some cases identified on Deviation Requests (DRs).

(Closed) Noncompliance (320/77-11-01):

Failure to perform required resistance tests between conductors in containment penetrations.

The inspector examined the requirenents for " Inspection Prior to Installation" of General Electric Company (GE) manual GEK-45715

" Electrical Penetrations - Installation Instructions," and B&R Engineering Change Memo (ECM) 3105, Revision 2.

This revision of the ECM was written for clarification of the test requirements and states, in part, "In the case where a single conductor goes through a header hole the only test required is the one between its associated ~

pin and ground...."

The test records showed resistance tests to

-

have been conducted between conductors in the same header hole but resistance from conductor to ground only for a single conductor within a header hole. This item had been identified as a noncom-pliance due to poorly defined requirements of UE&C Procedure ECP-9-2.

This procedure has been revised to clarify the requirerents.

(

82 2S3

-

-

.

e a

m

.

.

(Ciosed) Unresolved Item (320/77-20-01):

Diesel Generator 4160 Volt Cable Terminations.

Burns and Roe (B&R) issued ECN No. 5176 29, 1977, revising specification 2555-43 and Colt Draw-dated June ing 11856085 SH 1, Revision 6, to show the diesel generator 4160 EC No. 5073, Revisicn 1, dated June 6, volt cable terminations.

1977, changed the lugs on the cable irca DF-X-1 A and 1B to T and B crimp type lugs.

Quality control inspection verified and documented 21461, 21462, completion of these modifications' in QCI reports 21463, 21464, 21465, and 21466, dated June 20, 1977.

(Closed) Unresolved Item (320/77-20-02): Requirements for vendor documentation, Level Transmitter DH-3-LT-1.

The' inspector examined For Class Metropolitan Edison Quality Assurance Plan, Revision 11.

4 equipment this plan states that the QC requirements are variable and covered in the individual equipment specification and in essence they require "the best commercial practice." The inspector also

'

1048/0569 " Specification for Non-examined B&W specification no.

nuclear Instrumentation," which had no requirement for submittal of vendor documentation to the site.

(Closed) Unresolved Item (320/77-20-03): Responsibility for storage and cleanliness during partial turnover of electrical equipment.

20, 1977, The inspector examined GPU letter TMI-II-5597 dated June

<

to UE&C which confirmed discussion of this subject and established that UE&C startup was responsible for cleanliness of such equip-ment.

.

3.

Licensee Internal Audits The inspector examined reports of two GPU audits and two B&R surveil-lance inspections of installation and termination of electrical The audits cable, all conducted between February and June,1977.

and surveillance inspections were planned, conducted and followed

-

>

up in accordance with the Metropolitan Edison Quality Assurance Plan, Revision 11, and the B&R Quality As rance Plan No. 2555-QAP-1, ievision 14, respectively.

Five findings and two recommendations

~

were identified ducing the audits and corrective actions were in progress or complete. Two findings were identified during the June,1977, surveillance inspection. The finding reports had been issued.

No items of noncompliance were identified.

.

t

'

fs~

~

-

4.

OC Records - Electrical Cable and Installation The inspector reviewed the Qd records for installation, routing, terminations, separations, identification, nondestructive testing, and nonconformance/ deviations for the cables listed below.

Ecuicment Circuit No.

OCI Report {

Turnover Pka.

_

Decay Heat Removal Pump Motor HG1P 18672 DH-47-19E Decay Heat Removal Pump

'

Motor Control HG5C 15571 DH-47-4E Reactor Coolant Makeup Pump Motor MG45P 15578 MU-59-7E Reactor Coolant Makeup Pump Motor Control HG49C 18039 Md-99-11 E Emergency Feedwater Pump Motor HG30P 16500 EF-59-10E Emergency Feedwater Pump

.15024 EF-59-3E Motor Control HG33C i

RB Emergency Cooling Boos-ter Puias Motor SA81P 21020 RP-135-34E RBEmergency Cooling Boos-ter Pump Motor Control SA84C 20808 RP-135-32E Reactor Building Air Cooling Fan Motor SA39P 19885 AH-134-15E

.

Reactor Building Air Cooling Fan Motor Control SA46C 21015 AH-134-23E Control Building River Water Booster Pump Motor SCl35P 14065 NR-lll-3E i

Control Building River Water Booster Pump Motor Control SCl38C 16995 NR-111-52E t

'

82-2E5 u

!


. -.

.

Cable and Battery Room Fan Cool Unit Motor

,SC79P 15719 AH-33-7E Cab'ie and Battery Room Fan Cool Unit Motor Control SC255C 18102 AH-33-12E Reactor Euilding Spray Pump to Spray Header Valve MA21P 19561 BS-141-19E Reactor Building Spray Pump to Spray Header Valve Control MA23C 16895 BS-141-5E Sodium Hydroxide Supply to Borated Water Valve MA29P 16525 DH-47-8E Sodium Hydroxide Supply to Borated Water Valve Control MA32C 16227 DH-47-7E Inspection records conformed to the requirements of UE&C Procedure ECP-3-2 and showed the cables to have been installed and terminated in accordance with B&R specification 2555-70.

No items of noncompliance were identified.

5.

OC Records - Instrumentation Cables and Terminations The inspector reviewed QC records for installation, routing, tenm-inations, separations, identification, nondestructive testing and nonconformance/ deviations for the cables listed in the table below.

System Circuit No.

GCI Reco'rt Turnover Pko.

,

SAFETY FEATURES ACTUATION SYSTEM Containment Pressure 1T2939C E-20329 RP 160-23E

"

"

1T2940C E-20439

";*~1"

~

"

"

1T2943C E-20435

"

"

"

"

1T2944C E-20326

"

"

REACTOR PROTECTION SYSTEM

.

Source Range Neutron Level 1T2329I E-20040 RP 151-24E

"

"

"

"

1T2340I E-20947

"

"

Power Range Neutron Level 1T23971 E-17033 RP 151-4E (

172401I E-17029

"

"

"

"

"

"

"

"

"

"

1T2403I E-17028

"

"

"

"

"

"

1T2405I E-17032

"

"

"

"

"

"

1T2407I E-17031

-

"

"

'

82~256

.

..

IT23871 E16984 RP 1519E

"

"

Reactor Core Loop Flow 1T2388I E15919

"

"

'-

"

"

1.T23911 E16983 a

"

"

"

"

"

1T2395I E17013

"

"

"

"

"

"

1T24091 E16395

"

"

"

"

"

"

1T2413I E-16393

"

"

"

"

"

"

1T24171 E-16394

"

"

"

"

"

"

T0951I E-16254

"

"

"

"

"

"

T09531 E-17081

"

"

"

"

"

Inspection records conformed to the requirements of UE&C Proc ECP-3-2 and showed the cables to have been insta 2555-70.

in accordance with B&R specification No items of noncompliance were identified.

6.

Cable Installa. ion The inspector witnessed installation of cable for the auxiliary building Bus 2-21E, Unit B2.the QC inspec

.

Size and type of cable

--

Routing

--

Separation

--

Identification

--

Cable Pulling Procedure

--

Hondestructive testing and cable terminations had not been p and were open items on the quality control inspection report.

No items of noncompliance were identified.

.

Nonconfomance/ Deviation Records _

7.

The inspector reviewed Deviation Reports (D The reports were com-of electrical and instrucentation cable.

plete, described the nonconformances and c l

No items of nonccmp1 ~-"ce were identified.

,

i s

.

!

-

~

i

-

i S2 ^,?S?

'

..

.

8.

Plant Tour The inspector walked through Iarious areas of the plant and ob-served work in progress and adherence to QC requirements for control and protection of equipment.

The inspector observed work in progress on installation of the pressurizer heater bun-die cover and support steel for the pressurizer relief valves.

During the offshift inspection on July 19, 1977, the inspector observed welding in progress for installation of valve; MU-V-376 and 378.

No items of noncompliance were identified.

.

9.

Review of Nonroutine Events Recorted by the Licensee On November 12, 1976, the licensee had reported as a significant deficiency in accordance with 10 CFR 50.55(e), a design defi-ciency in the control logic for the makeup pump.

By letter dated December 14, 1976, the licensee described the corrective action to be taken. The inspector examined B&R ECX No. 4276 which identified the required changes and UE&C QC' Inspection Report No.

E-21,686 which recorded completion of the changes required by the ECF'.

The inspector had no further questions on this matter.

10.

Licensee Action on IE Bulletins / Circulars The inspector examined licensee records and interviewed licensee representatives to verify licensee action on the following:

,

Circular 77-08 - Failure of Feedwater Sa<u.'e Probe - this type of probe is not used at this facility.

11. Exit Interview The inspector met with licens5e representatives (denoted in Fara-graph 1) at the conclusion of the inspection on July 22, 1977.

The inspector summarized the scope and findings of the inspection.

The licensee representatives had no comments.

,

e

%

-

82 2E8

-

.

.