IR 05000302/1988035
| ML20247Q321 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/27/1989 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| Shared Package | |
| ML20247Q328 | List: |
| References | |
| NUDOCS 8904070102 | |
| Download: ML20247Q321 (2) | |
Text
-
--.
.
.
'
.
.
i
-
IdR 2 71989
'
i Docket No. 50-302 License No. DPR-72 Florida Power Corporation Mr. W. S. Wilgus, Vice President, Nuclear Operations ATTN: Manager, Nuclear Operations Licensing P. O. Box 219-NA-21 Crystal River, FL 32629 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-302/88-35 i
The NRC Systematic Assessment of Licensee Performance (SALP) has been completed for your Crystal River facility.
The facility was evaluated for the period September 1,1987, through December 31, 1988.
This report will be discussed with you at a public meeting to be held at the Crystal River facility on April 5, 1989 at 9:00 a.m.
The performance of your Crystal River facility was evaluated in the functional areas of plant operations, radiological controls, maintenance / surveillance, emergency preparedness, security, engineering / technical support, and safety assessment / quality verification.
Overall performance was judged to be satisfactory.
Improvement was evident in the areas of security, radiological controls and surveillance.
Continued strength was noted in the maintenance area.
Performance in several areas could have been improved by more effective supervisory review.
Inadequate
staff size and training contributed to significant weaknesses in the engineering i
and technical support area.
l
Any comments you have concerning our evaluation of the performance of your j
facility should be submitted to this office within 30 days following the date i
of our meeting in Crystal River, Florida.
We specifically request that you advise us of actions you plan to take in response to the Category 3 rating.
Your comments, a summary of our April 5,1989, meeting, and my disposition of your comments will be issued as appendices to the enclosed SALP report and an amended report will be issued if warranted.
)
f,[ff$$o@$$$o g2
!
'
>(
o
.
_ _ _ _ _ _ _ _ _.
f
'
,..
.
-
.
.'
l
'
. ALAR 2 71st i
,
F,lorida Power Corporation
1 Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, i
Original Signed by Malcolm L. Ernst /for Stewart D. Ebneter Regional Administrator Enclosure:
SALP Board Report - Crystal River Unit 3 cc w/ encl:
{
G. L. Boldt, Vice President,
!
Nuclear Production l
A. H. Stephens, General Counsel j
R. C. Widell, Director, Nuclear Operations Site Support P. F. McKee, Director, Nuclear Plant Operations State of Florida bec w/ encl:
NRC Resident Inspector DRS Technical Assistant Document Control Desk l}r Rj I Rll RII RII RI R"I kN VL)
NR K
ertnIr RCrignjak
' Wilson AGibson DCollins eyes
/89 03Q/89 03/g89 03/gN89 03/ /89 3/yl/89 RII 3/
<
---
- - - - - _