IE Insp Rept 50-302/77-07 on 770416-21.No Noncompliance Noted.Major Areas Inspected:Plant Operation During Power Ascension Testing,Conduct of Turbine Trip Test from 100% Power & Shutdown from Outside Control Room Test
ML19308D233
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/17/1977
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19308D223 List:
References
50-302-77-07, 50-302-77-7, NUDOCS 8002270690
Download: ML19308D233 (4)


Text

'

-. _

  1. pt>n mag

.T

_

UNITED STATES

,

[o, NUCLEAR REGULATORY COMMISSION i

,

)

~

n R EGloN in j

(

n$

230 PEACHTREE STREET, N.W. SUITE 1217

ATLANTA, GEORGI A 30303

-

y W4 /

  • ..**

Report No. 50-302/77-7

,

Docket No. 50-302 License No. DPR-72 Licensee: Florida Power Corporation P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Facility Name: Crystal River 3 Inspection at: Crystal River Site, Crystal River, Florida Inspection conducted: April 16-21, 1977 Inspector-in-Charge: Jerry D. Martin Accompanying Personn None

~

Reviewed by:

I

~

7 77 R. D. Martin, Chief

_

' Date Nuclear Support D.ction Inspection Summary Inspection on April 16-21, 1977 (Report No. 50-302/77-7)

Areas Inspected: Routine, announced inspection of plant operation during power ascension testing. The " Turbine Trip Test from 100%

Power" and " Shutdown from Outside Control Room Test" were witnessed.

The associated procedures were also reviewed. The inspection involved 34 inspector-hours on site.

Results: Within the areas inspected no items of noncompliance were found. The "S'nutdown from Outside Control Room" test was rescheduled since the acceptance criteria was not met during the conduct of the first test.

N

- - - _ _. _..

.

8 o on,,, Spo

.

-

.

--

.

.-___-.__ -__- - -

e

.-

.

'N IE Rpt. No. 50-302/77-7 I-l

.

7!/[

DETAILS I Prepared b -

  • J.

Martink Reactor Inspector fataf '

N ear Support Section

/

/

Reactor Operations and Nuclear Support Branch Datas of Inspection-April 16-21, 1977 Reviewed by:

,, ////u

7!77 R. D7 Hartin,' Chief

/ (te '

D Nuclear Support Section Reactor Operations and Nuclear Support Branch 1.

Personnel Contacted Florida Power Corporation (FPC)

G. P. Beatty, Jr. - Nuclear Plant Superintendent P. F. McKee - Assistant Nuclear Plant Superintendent W. R. Nichols - Operations Supervisor D. W. Pedrich, IV - Compliance Engineer J. C. Hobbs, Jr. - Manager Generation Testing Babcock and Wilcox Company (B&W)

J. Kelly - Testing Superintendent 2.

Licensee Action on Previous Inspection Findings Not applicable to this inspection report.

3.

Unresolved Items None this inspection period.

4.

Power Ascension Test Witnessing Power ascension testing that was in progress during the dates of this inspection was witnessed by the inspector. The testing activities were reviewed to assure that:

a.

The procedures of appropriate revision were available and in use by all crew members.

.

b.

Test prerequisites were met.

_

_. -

-

__.

.

..

-

.

_

_

__ _

_

. _... _.

.__,

.

'

-

.

i.

N

'

.

-

,

-

IE Rpt. No. 50-302/77-7 I-2

.

c.

Technical Specifications requirements were met.

.

d.

The test was performed as required by the procedure.

,

e.

Crew actions appear to be correct and timely during the performance of the test with adequate coordination.

.

f.

Preliminary test results show that overall test acceptance criteria had been met.

The performance of each test was evaluated against the requirements

of Regulatory Guide 1.68 - November, 1973 and FSAR Chapter 13,

" Initial Tests and Operation."

The following documents were reviewed:

.

TP - 71 - 800 -26 (Rev. 2), Loss of Offsite Power Test TP - 71 - 800 - 27 (Rev. 0), Shutdown From Outside Control Room Test EP - 113 (Rev. 3), Plant Shutdown From Outside Control Center l

TP - 71 - 800 - 14 (Rav. 2), Reactor / Turbine Trip Test

!

The following tests were witnessed:

Shutdown From Outside Control Room Test The purpose of this test was to demonstrate the ability to place and maintain the plant in a " Hot Standby" condition from outside the control room. When the test was conducted on April 16, 1977, the acceptance criteria of the procedure was not met, therefore a rerun of the test was scheduled.

i The major cause of the test not being able to meet the acceptance

,

criteria was the lack of adequate control over feedwater to the steam generators. The results of the test rerun will be examined during a subsequent inspection.

'

Turbine Trip Test From 100% Power The purpose of this test was to measure and evaluate the transient response of the plant during and following a turbine trip from 100%

rated power. The test was conducted on April 18, 1977, and the preliminary test results show that the overall test acceptance i

criteria had been met.

Within the areas inspected no discrepancies were identified.

-

-.-

.... -

.

,.,,-

-, -...

,

-

, -, - -.

,

...._.

-

_,.. - -..

.. -..

-

.

,

__.

- -

-..- -.. -..... -.-.

.-- -

-

j

'

.

_

_

'

.

,

.

i

!

m,

.

,

.

. -

i

,

i

!

IE Rpt. No. 50-302/77-7 I-3 i

I

-

]

!

5.

Management Interviev

,

A management interview was held on April 21, 1977, with G. P. Beatty

.

l and staff. The inspection findings were discussed at the meeting.

,

I

!,

.

!

.

i

i e

'

<

'

.

I

i

.

!

.

.

i

>

-

.

.

h I

kl

'

,

I

!

,

,

,

,

$

i

'

,

.

f

$

" "

g

.

.w,.,

,...m

..

my

,,

.

y-t

~*=--'w-T'-'-"

w

---C'mv'eW-W-e--=----'"w'-v&wm---*rr w -- ww-w*r-Ww

'e'

w*w

'=-

ww---ee----w w-Me-e9wn--wm-'-w-Pw N'-M"www-

'wwswtwr=- - ' '

ew*

-