Integrated Inspection Report 05000298/2019003
ML19303A660
Person / Time
Site: Cooper 
Issue date: 10/30/2019
From: Christopher Newport
NRC/RGN-IV/DRP/RPB-C
To: Dent J
Nebraska Public Power District (NPPD)
References
EPID I-2019-003-0003 IR 2019003
Preceding documents:
Download: ML19303A660 (40)


Text

October 30, 2019

SUBJECT:

COOPER NUCLEAR STATION - INTEGRATED INSPECTION REPORT 05000298/2019003

Dear Mr. Dent:

On September 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Cooper Nuclear Station. On October 17, 2019, the NRC inspectors discussed the results of this inspection with Mr. J. Sullivan, General Manager Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

Two findings of very low safety significance (Green) are documented in this report. These findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or significance of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Cooper Nuclear Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Cooper Nuclear Station.

J. Dent, Jr.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Christopher W. Newport, Acting Chief Reactor Projects Branch C Division of Reactor Projects

Docket No. 05000298 License No. DPR-46

Enclosure:

As stated

Inspection Report

Docket Number:

05000298

License Number:

DPR-46

Report Number:

05000298/2019003

Enterprise Identifier: I-2019-003-0003

Licensee:

Nebraska Public Power District

Facility:

Cooper Nuclear Station

Location:

Brownville, NE

Inspection Dates:

July 1, 2019 to September 30, 2019

Inspectors:

B. Baca, Health Physicist

L. Carson, Senior Health Physicist

L. Flores, Project Engineer

N. Greene, Senior Health Physicist

J. O'Donnell, Health Physicist

N. Okonkwo, Reactor Inspector

D. Proulx, Senior Project Engineer

W. Sifre, Senior Reactor Inspector

M. Stafford, Senior Resident Inspector

C. Stott, Reactor Inspector

P. Vossmar, Senior Resident Inspector

Approved By:

Christopher W. Newport, Acting Chief

Reactor Projects Branch C

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Cooper Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Implement Fire Protection Program Surveillance Requirements for a Fire Barrier Seal Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000298/2019003-01 Open/Closed

[P.1] -

Identification 71111.05Q The inspectors identified a Green, non-cited violation of License Condition 2.C(4), Fire Protection, for the failure to implement all provisions of the approved fire protection program.

Specifically, prior to July 2, 2019, the licensee failed to implement Surveillance Procedure 6.FP.606, Fire Barrier/Penetration Seal Visual Examination, Revision 25, for visual inspection of the cable expansion room west wall fire barrier and its associated MN 46 penetration to ensure that an unsealed penetration opening was identified. As a result, the licensee failed to identify that the conduit seal was degraded until it was discovered by the inspectors on July 2, 2019, and subsequently declared nonfunctional by operations personnel.

Failure to Take Required Actions of Technical Specification 3.5.2 for Reactor Pressure Vessel Water Inventory Control During Secondary Containment Work Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000298/2019003-02 Open/Closed

[H.5] - Work Management 71153 The inspectors documented a self-revealed, Green, non-cited violation of Technical Specification 3.5.2, Reactor Pressure Vessel Water Inventory Control, for the licensees failure to take technical specification required actions during a reactor pressure vessel water inventory control activity. Specifically, on October 10, 2018, during a planned water inventory control activity, the licensee failed to meet Technical Specification 3.5.2, Condition C, when an unplanned and unrecognized breach of secondary containment occurred, and the licensee did not verify secondary containment could be closed as required until the breach was discovered several hours later. In particular, during residual heat removal service water piping work, the penetration of the same residual heat removal service water piping on both the control building and reactor building sides of the secondary containment boundary was not recognized, and as a result, a containment closure plan was not in place.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000298/2018-002-00 Lack of Procedural Guidance Results in Work Scheduling Error Causing Breach of Secondary Containment and Condition Prohibited by Technical Specifications 71153 Closed

PLANT STATUS

Cooper Nuclear Station began the inspection period at rated thermal power. On August 23, 2019, the unit was down powered to 70 percent for a control rod sequence exchange. The plant was returned to rated thermal power on August 24, 2019, and remained at or near rated thermal power for the remainder of the inspection period

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04Q - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Standby liquid control B on July 8, 2019
(2) Service water booster pump A subsystem on July 16, 2019
(3) Reactor core isolation cooling on September 13, 2019
(4) Core spray B on September 26, 2019

71111.04S - Equipment Alignment

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the hardened containment vent system installed in accordance with NRC Order EA-13-109 on August 27, 2019. [Completion of this sample was in accordance with the guidance in Temporary Instruction 2515/193, with credit taken in IP

71111.04 - further details are documented in Inspection Report 05000298/2019012, ADAMS

Accession No. ML19266A571.]

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Cable expansion room on July 3, 2019
(2) Reactor building suppression pool 859 feet elevation on July 22, 2019
(3) Southeast quad 859 feet and 881 feet elevations on August 21, 2019
(4) Control cable spreading room on September 17, 2019
(5) Critical switchgear rooms 1F and 1G on September 18, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Reactor building 931 feet elevation on September 30, 2019

Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Sump W during sump pump failure and elevated river levels on September 27, 2019

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during a planned quarterly downpower on August 24, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a licensed operator training drill performed as a corrective action for a declining emergency response performance trend on July 30, 2019.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Reactor building essential ventilation units on September 30, 2019

Quality Control (IP Section 02.02) (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:

(1) Reactor core isolation cooling commercially dedicated signal conditioner failure on September 24, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Standby liquid control A pump planned maintenance on July 8, 2019
(2) Unplanned reactor core isolation cooling unavailability on July 24, 2019
(3) Core spray B planned work window on August 13, 2019
(4) Emergency station service transformer planned work window on August 21, 2019
(5) Emergent RF-MO-29 valve packing injection on August 27, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (5 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Part 21 for reactor core isolation cooling positioner defect on July 3, 2019
(2) Residual heat removal to radwaste primary containment isolation valve classification/operability on August 15, 2019
(3) Service water check valve 37 past operability on August 19, 2019
(4) Southeast quad fan coil unit failed to meet surveillance acceptance criteria on August 16, 2019
(5) Questionable results during containment isolation valve local leak-rate test on September 19, 2019

71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01)

The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for 10 CFR 50.59 from September 20, 2013, to September 20, 2019:

(1) Evaluation 2013-3, Revision 2, Remove heater bay steam leak detection temperature switches
(2) Evaluation 2015-2, Revision 0, Startup transformer replacement
(3) Evaluation 2015-4, Revision 1, Time critical operator action for suppression pool cooling
(4) Evaluation 2015-5, Revision 1, Reactor containment isolation cooling turbine governor control system replacement
(5) Evaluation 2018-1, Revision 0, Engineering Change (EC) 6038060, Open phase protection system
(6) Evaluation 2018-2, Revision 0, Engineering Evaluation (EE)18-012, Extending inspection duration of underwater torus region
(7) Evaluation 2019-2, Revision 0, Technical Requirements Manual 3.7.1, flooding forecast removed
(8) Screen 71719, 161 kV low voltage limit
(9) Screen 71720, CR-CNS-2016-02270, Standing Order 2016-005
(10) Screen 81728, R3402, sudden pressure relay replacement
(11) Screen 81739, Service water surveillance operation, Division 2
(12) Screen 81731, Use of NSF fuel channels
(13) Screen 81734, Control room air conditioning temporary compressor breaker
(14) Screen 91748, Procedure 6.1EE.306, 4160 V, bus 1F, undervoltage relay channel functional test
(15) Screen 91758, 4160 V, bus 1G, undervoltage relay channel functional test (Division 2)
(16) Screen 91770, Reactor equipment cooling sequential load time delay relay relocation
(17) Screen 91778, Code Case N-513-3 compensatory actions
(18) Screen 91795, Operability Evaluation CR-CNS-2016-05558
(19) Screen 91793, Reclassify MCC-L and MCC-T as nonessential motor control centers
(20) Screen 101794, CR-CNS-2016-05628, CA-001
(21) Screen 111827, High pressure core injection turbine overspeed functional test
(22) Screen 121884, Asea Brown Bovari breaker 145PMB40 BLK limit switch upgrade (1602)
(23) Screen 121895, Service water booster pump oil sight glasses and reservoir
(24) Screen 121898, T2 transformer sudden pressure and seal-in relay replacement
(25) Screen 121948, Replace high pressure core injection flow controller (analog to digital)
(26) Screen 121953, Main generator underfrequency relay replacement
(27) Screen 122011, Residual heat removal service water booster pump system
(28) Screen 122025, Emergency diesel generator indicating light isolation
(29) Screen 122038, Reclassify relays HV-REL-1CFX and HV-REL-1DFX to nonessential
(30) Screen 122067, Various motor operated valve packing load adjustment calculation revisions
(31) Screen 122093, High pressure core injection loss of coolant heat exchanger thermal performance and tube plugging margin
(32) Screen 122143, Residual heat removal and high pressure core injection net positive suction head margins for an anticipated transient without SCRAM event
(33) Screen 142229, Reactor equipment cooling heat exchanger allowable tube plugging increase

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Hardened containment vent system installed in accordance with NRC Order EA-13-109 on August 29, 2019. [Completion of this permanent modification sample was in accordance with the guidance in Temporary Instruction 2515/193, with credit taken in Inspection Procedure

71111.18 - further details are documented in

Inspection Report 05000298/2019012, ADAMS Accession No. ML19266A571.]

71111.19 - Post-Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Service water check valve 37 leakage post maintenance testing on July 23, 2019
(2) Reactor building outer railroad airlock door seal post maintenance testing on July 25, 2019
(3) Scram discharge volume check valve replacement on August 6, 2019
(4) Core spray B planned work window on August 16, 2019
(5) Southeast quad fan coil unit flow test following coil cleaning on September 5, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Emergency diesel generator 2 monthly operability test on July 15, 2019
(2) Control room emergency filtration system flow test on July 19, 2019

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Reactor equipment cooling motor operated valve operability inservice test on July 31, 2019

FLEX Testing (IP Section 03.02) (1 Sample)

(1) Spent fuel pool secondary level instrument functional testing on August 7,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.

(1) The inspectors reviewed the following:

Portable Survey Instruments

  • RO-20 RP-11376
  • AMS-4 RP-10762
  • Model 3 RP-11438
  • TelePole RP-11451
  • REM 500 RP-11177
  • Model 177 RP-11275
  • H-809V RP-11469

Source Check Demonstration

  • RO-20 RP-11419
  • Model 3 RP-11438
  • TelePole RP-11451 Area Radiation Monitors and Continuous Air Monitors
  • CNS-0-RMA-RA-2
  • CNS-0-RMA-RA-6
  • CNS-0-RMA-RA-7
  • CNS-0-RMA-RA-11
  • CNS-0-RMA-RA-16
  • CNS-0-RMA-RA-23
  • CNS-0-RMA-RA-24

Personnel Contamination Monitors, Portal Monitors and Small Article Monitors

  • PCM-2 RP-10571
  • SAM-12 RP-11152

Calibration and Testing Program (IP Section 02.02) (1 Sample)

The inspectors evaluated the calibration and testing program implementation.

(1) The inspectors reviewed the following:

Alarm Setpoint and Calibration Method Check of Personnel Contamination Monitors, Portal Monitors and Small Article Monitors

  • SAM-12 RP-11152

Failure to Meet Calibration or Source Check Acceptance Criteria

  • None Available

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:

(1)

  • Liquid waste effluent system
  • Elevated release point (ERP) system
  • Radwaste ventilation

Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)

The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:

(1)

  • ERP
  • Liquid radwaste
  • Reactor building

Sampling and Analysis (IP Section 02.03) (1 Sample)

The inspectors reviewed the following:

(1) Radioactive Effluent Sampling and Analysis Activities
  • ERP
  • Reactor building
  • Radwaste
  • Turbine building

Effluent Discharges The licensee did not perform a continuous or batch liquid effluent discharge during the inspection for observation. The inspectors reviewed selected discharge permits and the licensee's procedures for performing liquid and gaseous effluent discharges.

Instrumentation and Equipment (IP Section 02.04) (1 Sample)

The inspectors reviewed the following radioactive effluent discharge system surveillance test results:

(1) Air Cleaning System Surveillances
  • Standby gas treatment

High-Range Effluent Monitoring Instrumentation Calibrations

  • Reactor building
  • Radwaste
  • ERP

Dose Calculations (IP Section 02.05) (1 Sample)

The inspectors reviewed the following to asses public dose:

(1) Liquid and Gaseous Discharge Permits The inspectors walked through the EFFECTS computer program, which documented the weekly continuous gaseous effluent discharge sample inputs, with a chemistry technician and the associated procedure for selected time periods during the inspection period. In addition, the inspectors reviewed the following liquid batch discharge releases:
  • 18-15
  • 18-33
  • 18-42
  • 19-10
  • 19-13
  • 19-43

Annual Radiological Effluent Release Reports

Abnormal Gaseous or Liquid Tank Discharges The licensee did not have an abnormal gaseous or liquid tank release during the inspection period. The inspectors reviewed release logs and discharge permits for abnormal discharges. The inspectors verified an infrequent tank discharge was performed according to licensee procedures.

71124.07 - Radiological Environmental Monitoring Program

Site Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the radiological environmental monitoring program implementation.

  • Air sampling station No. 1
  • Air sampling station No. 2
  • Air sampling station No. 6 (aka solar station No. 1)
  • Air sampling station No. 7
  • Thermo-luminescent dosimeter (TLD) monitoring station No. 2
  • TLD monitoring station No. 7
  • TLD monitoring station No. 10

Environmental Sample Collections and Preparation Observation

1. Environmental samples: None were available for review and observation during this

inspection. The inspectors visited a milk cow collection point and observed the licensees delivery of a milk sampling container in preparation for the next milk sampling. The inspectors observed the collection and replacement of air sample cartridges at the following stations:

  • Air sampling station No. 1
  • Air sampling station No. 2
  • Air sampling station No. 6 (aka solar station No. 1)
  • Air sampling station No. 7

Licensee Actions in Response to Missed Sample, Inoperable Sampler, Lost TLD or Anomalous Measurement

1. CR-CNS-2019-03895: Sampling at positions Nos. 28 and 35 were not available due

to flooding July 19, 2019

2. CR-CNS-2019-03596: Suitable broadleaf vegetation unavailable due to flooding

July 1, 2019

3. CR-CNS-2018-06283: Air samplers Stations 03, 05, and 08 were inaccessible due

to excessive flooding October 10, 2018

4. CR-CNS-2018-08143: 100-meter A channel wind speed excessively high;

repair/replace November 30, 2018

5. CR-CNS-2018-02820: 100-meter B channel temperature sensor erroneous/incorrect

May 9, 2018

Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)

Sampling Program for the Potential of Licensed Material Entering Groundwater Groundwater Monitoring Well (GMW)

  • CR-CNS-2018-01877, GMW-06 & GMW out of service due to broken submersible pump, 03/29/19

For the 19 GMWs available for the inspection period, all wells measured less than 3,000 pCi/l H-3. The reporting level for H-3 in groundwater is 20,000 pCi/l.

  • GMWs: 1D, 1S, 2, 3, 4D, 4S, 5, 6, 7D, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17

71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,

and Transportation

Radioactive Material Storage (IP Section 02.01)

The inspectors evaluated radioactive material storage.

(1) The inspectors toured the following areas:
  • Low Level Radioactive Waste (LLRW) Storage Pad
  • Radioactive Materials Storage Building - Blue Building
  • East Warehouse Radioactive Material Storage
  • Dry Fuel Storage Pad - ISFSI Horizontal Storage Module (HSM) Pad
  • Multipurpose Facility (MPF)
  • Spent Fuel Pool Area

The inspectors performed a container check (e.g., swelling, leakage and deformation)on the following various containers:

  • LSA Boxes in Blue Building
  • 55 Gallon Drums
  • Sealands with Dry Active Waste
  • Used Oil Drums
  • Wooden Boxes
  • Radioactive Trash Bags

Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)

The inspectors evaluated the following radioactive waste processing systems and processes during plant walkdowns:

(1) Liquid or Solid Radioactive Waste Processing Systems
  • Floor Drain Filter System
  • Condensate Waste Storage System
  • Low Level Radioactive Waste Processing

Radioactive Waste Resin and/or Sludge Discharges Processes

  • NUPAC Resin Dewatering System

Waste Characterization and Classification (IP Section 02.03) (1 Sample)

The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:

(1)

  • CONDWST - WST RESIN/COND RESIN, March 4, 2019
  • DAW - DRY ACTIVE WASTE, March 4, 2019
  • SPENT - SPENT BEAD RESIN, March 4, 2019
  • SCO - Surface Contaminated Equipment, March 4, 2019
  • LAUNDRY - Contaminated Laundry, March 4, 2019
  • DAW - Dry Active Waste, April 11, 2019

Shipment Preparation (IP Section 02.04) (1 Sample)

The inspectors evaluated and observed the following radioactive material shipment preparation processes:

(1)

  • The inspectors were not able to evaluate and observe actual radioactive material shipment preparation processes as no shipments were in process.

The inspectors observed loads of sampled soil being removed from the site which was appropriately surveyed and analyzed. The inspectors also reviewed several shipment packages that included surveys and assessments in preparation for shipment.

Shipping Records (IP Section 02.05) (1 Sample)

The inspectors evaluated the following nonexcepted package shipment records:

(1)

  • 17-24, Type A, October 17, 2017
  • 17-25, Type A, December 6, 2017
  • 17-26, Type A, December 15, 2017
  • 18-05, Type A, August 9, 2018
  • 18-10, Type A, September 11, 2018
  • 18-11, Type A, October 11, 2018
  • 18-14, Type A, December 11, 2018
  • 19-01, Type B, March 4, 2019
  • 19-03, Type B, April 2,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03)===

(1) July 1, 2018 - June 30, 2019

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample.

(IP Section 02.16) (1 Sample)

(1) October 1, 2018 - June 30, 2019

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in emergency preparedness drill classification that might be indicative of a more significant safety issue on August 2, 2019.

71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following licensee event reports (LERs):

(1) LER 05000298/2018-002-00, Lack of Procedural Guidance Results in Work Scheduling Error Causing Breach of Secondary Containment and Condition Prohibited by Technical Specifications (ADAMS Accession No. ML18353A278). The circumstances surrounding this LER and an associated non-cited violation are documented in the Inspection Results section of this report.

INSPECTION RESULTS

Failure to Implement Fire Protection Program Surveillance Requirements for a Fire Barrier Seal Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000298/2019003-01 Open/Closed

[P.1] -

Identification 71111.05Q The inspectors identified a Green, non-cited violation of License Condition 2.C(4), Fire Protection, for the failure to implement all provisions of the approved fire protection program.

Specifically, prior to July 2, 2019, the licensee failed to implement Surveillance Procedure 6.FP.606, Fire Barrier/Penetration Seal Visual Examination, Revision 25, for visual inspection of the cable expansion room west wall fire barrier and its associated MN 46 penetration to ensure that an unsealed penetration opening was identified. As a result, the licensee failed to identify that the conduit seal was degraded until it was discovered by the inspectors on July 2, 2019, and subsequently declared nonfunctional by operations personnel.

Description:

On July 2, 2019, the inspectors toured the cable expansion room, a risk-significant area where safety-related cables from both divisions are routed. The inspectors observed that a 3-inch cable conduit ran about 8 feet from the west wall of the room and opened near one of the cable trays. The west wall of the cable expansion room was an FP1 Technical Requirements Manual (TRM)-required fire barrier. The open end of the conduit had four cables in it, and the inspectors noted that the conduit seal material was missing from about half of the conduit opening. The inspectors reported the degraded seal, labeled MN 46, to the control room. In response, operations and fire protection personnel walked down the seal. After review of applicable procedures and plant drawings, the licensee determined that the required intact smoke and hot gas seal could not be proven to exist.

Because the deficiency represented an unsealed fire barrier penetration, operations personnel declared the FP1 fire barrier that the conduit penetrated nonfunctional under TRM 3.11.7 and implemented the required hourly fire watch.

The inspectors noted that the seal appeared to have been degrading for some period of time prior to discovery and the inspectors noted that the degraded seal should have been identified during inspections required by TRM 3.11.7, Fire Barrier and Fire Wall Penetration Fire Seals, Technical Surveillance Requirement (TSR) 3.11.7.1. TSR 3.11.7.1 states, visually inspect each side of each fire barrier and penetration fire seal (where possible) on a 24-month frequency. The inspectors reviewed the results of the licensees most recently performed TSR inspection, documented in Procedure 6.FP.606, Fire Barrier/Penetration Seal Visual Examination, Revision 25, and performed on August 27, 2018. The inspectors noted that Procedure 6.FP.606 directed plant personnel to inspect the adequacy of the fire barriers and penetration seals via plant drawings and a checklist of the walls in each room. Step 5.1 contained inspection for "all fire barriers" and required verification that there were "no unsealed openings" and "no unsealed penetrations." The inspectors also noted that Fire Protection Program Procedure 3.6.1, "Fire Barrier Control," Revision 21, stated that the internal sealing requirement for a conduit with a diameter of 2-4 inches is a "smoke and hot gas seal within 5 feet of barrier or nearest opening." In addition, Engineering Evaluation (EE)10-055, "Conduit Internal Seals," Revision 0, which was credited in the licensee's NFPA 805 licensing basis contained industry testing data and stated, in part, that larger sized conduits, 3 inches diameter and over, allowed quantities of smoke to pass through the barrier and escape the conduits such that an exposure to sensitive equipment on the non-fire side of the barrier could be postulated. The smoke, if released on the non-fire side, could be expected to affect exposed equipment. The inspectors concluded that the seal contained in conduit MN 46 was a required penetration seal, and the lack of an intact seal should have been identified during performance of Procedure 6.FP.606.

After discussion with fire protection personnel, the inspectors noted that although Surveillance Procedure 6.FP.606 required identification of any unsealed openings and penetrations in fire barriers, the licensee failed to implement the procedure in a manner that ensured unsealed conduit penetrations like MN 46 would be identified. Specifically, although conduit MN 46 penetrated the wall and partially extended out into a room where it opened, plant personnel stated that they only inspected the external seal surrounding the outside of the conduit located at the wall and had not inspected the seal at the opening of the conduit. Fire protection personnel stated that they had determined that this seal was inaccessible and inspection at this location was not possible. After review of Procedure 6.FP.606, the inspectors concluded that the seal in question was accessible. Specifically, Procedure 6.FP.606 defines inaccessible as penetration seals or sections of fire barriers/fire walls that cannot be visually examined due to field configurations, and directs consideration of factors like hazardous material exposures, potential for plant trip or damage to safety equipment, and the need to remove permanent plant equipment to access the seal. The inspectors determined that MN 46 met none of the criteria listed in that it was located in an open area approximately 7 feet from the floor and was easily accessed via normal traversing paths. As a result, the inspectors determined that the licensee had failed to inspect the cable expansion room west wall fire barrier and its associated MN 46 penetration in accordance with TSR 3.11.7.1 and Procedure 6.FP.606.

Corrective Actions: Corrective actions included declaring the fire barrier nonfunctional, implementing TRM requirements for an hourly fire watch, and resealing the degraded penetration seal.

Corrective Action References: Condition Report CR-CNS-2019-03631

Performance Assessment:

Performance Deficiency: The licensees failure to implement fire protection program inspection requirements for an FP1 fire barrier was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Protection Against External Factors attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in a nonfunctional fire barrier in the cable expansion room, which houses both Division 1 and Division 2 safety-related cabling.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. Because the finding involved the ability to confine a fire, the inspectors applied Inspection Manual Chapter 0609, Appendix F, Fire Protection SDP, to determine the findings significance. The inspectors determined that there was an adequate automatic suppression system on either side of the fire confinement element, and therefore, they concluded that the performance deficiency was of very low safety significance (Green).

Cross-Cutting Aspect: P.1 - Identification: The organization implements a corrective action program with a low threshold for identifying issues. Individuals identify issues completely, accurately, and in a timely manner in accordance with the program. Specifically, fire protection personnel failed to identify the need to inspect the conduit seal at the opening of fire barrier penetration MN 46 during fire barrier surveillance inspections and failed to identify that the seal was degraded during walkdowns.

Enforcement:

Violation: License Condition 2.C(4) requires, in part, that, NPPD shall implement and maintain in effect all provisions of the approved fire protection program. TRM 3.11.7, Fire Barrier and Fire Wall Penetration Fire Seals, TSR 3.11.7.1 states, visually inspect each side of each fire barrier and penetration fire seal (where possible) on a 24-month frequency.

Surveillance Procedure 6.FP.606, Fire Barrier/Penetration Seal Visual Examination, Revision 25, implements this TSR and Step 5.1 states, in part, for all fire barriers, verify no unsealed openings and no unsealed penetrations.

Contrary to the above, prior to July 2, 2019, the licensee failed to verify there were no unsealed openings and no unsealed penetrations for all fire barriers. Specifically, the licensee failed to implement Surveillance Procedure 6.FP.606 for visual inspection of the cable expansion room west wall fire barrier and its associated MN 46 penetration to ensure that an unsealed penetration opening was identified. As a result, the licensee failed to identify that the conduit seal was degraded and nonfunctional until it was discovered by the inspectors on July 2, 2019.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Failure to Take Required Actions of Technical Specification 3.5.2 for Reactor Pressure Vessel Water Inventory Control During Secondary Containment Work Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity

Green NCV 05000298/2019003-02 Open/Closed

[H.5] - Work Management 71153 The inspectors documented a self-revealed, Green, non-cited violation of Technical Specification 3.5.2, Reactor Pressure Vessel Water Inventory Control, for the licensees failure to take technical specification required actions during a reactor pressure vessel water inventory control activity. Specifically, on October 10, 2018, during a planned water inventory control activity, the licensee failed to meet Technical Specification 3.5.2, Condition C, when an unplanned and unrecognized breach of secondary containment occurred, and the licensee did not verify secondary containment could be closed as required until the breach was discovered several hours later. In particular, during residual heat removal service water piping work, the penetration of the same residual heat removal service water piping on both the control building and reactor building sides of the secondary containment boundary was not recognized, and as a result, a containment closure plan was not in place.

Description:

During the licensees refueling outage, on September 30, 2018, work orders for residual heat removal service water (RHRSW) piping, located in the control building, were added to an originally approved scope on the same line of RHRSW piping located in the reactor building. When the work was added to the original scope, the licensee did not plan for the repairs to be ongoing simultaneously and, therefore, did not identify the need for a contingency plan to be established for a breach of a secondary containment boundary. On October 10, 2018, Day 11 of the refueling outage, control rod drive mechanism (CRDM)maintenance was ongoing during the RHRSW piping repairs. The CRDM maintenance involved some leakage of reactor pressure vessel (RPV) water during the maintenance activity and was considered a planned water inventory control activity (WICA). Technical Specification (TS) 3.5.2, Reactor Pressure Vessel Water Inventory Control, requires that the drain time of the RPV water inventory to the top of active fuel must be 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The licensee calculated the drain time to be 21.62 hours7.175926e-4 days <br />0.0172 hours <br />1.025132e-4 weeks <br />2.3591e-5 months <br /> for the CRDM maintenance. As such, entry into TS Limiting Condition for Operation (LCO) 3.5.2, Condition C, was required. One of the requirements of TS 3.5.2, Condition C, is that the licensee must verify that each secondary containment penetration flow path will be capable of being isolated in less than the drain time within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of LCO entry. Upon entry into the LCO for the CRDM work, at 12:10 a.m. on October 10, 2018, the licensee took action to verify containment closure plans were in place for all secondary containment breaches that plant personnel were aware of.

Containment closure contingency planning is contained in the licensees procedures.

Administrative Procedure 0-CNS-OU-108, Cooper Shutdown Safety Management Program, Revision 6, Section 6.17, contains containment defense in depth considerations that include, in part, maintaining containment closure capability during reduced water inventory operations.

Within that section, Step 6.17.4 references Administrative Procedure 0.50.5, Outage Shutdown Safety, Revision 40, for containment control requirements. Administrative Procedure 0.50.5 states, in part, that during Modes 4 and 5 when containment closure is required, simultaneously breaching both sides of a secondary containment piping penetration requires preplanned means to block off the breach.

On October 10, 2018, at 11:15 a.m., the licensee discovered that both the control building side and the reactor building side of the RHRSW piping were open simultaneously without a preplanned containment closure document (contingency plan) in place and failed to meet the technical specification LCO requirement that was entered for CRDM maintenance. This configuration existed for approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> before the breach was secured. The licensee was able to re-establish the boundary in less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery and established a containment closure plan for the RHRSW piping work. Had the licensee recognized that the RHRSW piping work was ongoing in both the control building and the reactor building simultaneously during the RPV water inventory control activity, the containment closure plan would have contained these secondary containment penetrations and included them for the verification of flow path isolation capability within the 4-hour time requirement, and the TS violation would not have occurred. However, during the approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> that the condition existed, the licensee was unaware of the breach until discovery at 11:15 a.m., and if containment closure was required during that time, sealing of this breach would not have occurred. This issue was identified through an event reported to the NRC as a condition prohibited by TS in LER 05000298/2018-002-00, Lack of Procedural Guidance Results in Work Scheduling Error Causing Breach of Secondary Containment and Condition Prohibited by Technical Specifications. It was self-revealed in that workers in the vicinity were unable to weld due to the sustained high volume of air flow through the secondary containment breach.

Corrective Actions: The licensee immediately stopped work, re-established the secondary containment boundary within an hour, and established a contingency closure plan for the RHRSW piping repairs.

Corrective Action References: Condition Report CR-CNS-2018-06295

Performance Assessment:

Performance Deficiency: The licensees failure to take actions required by Technical Specification 3.5.2 for reactor pressure vessel water inventory control is a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Configuration Control attribute of the Barrier Integrity Cornerstone and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, the licensee was unaware that there was ongoing work on RHRSW piping in both the control building and reactor building that breached secondary containment. These piping penetrations were not contained in a contingency closure plan and thus not verified to be capable of being isolated within the 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> required by TS LCO 3.5.2, Condition C, when performing a reactor pressure vessel water inventory control activity.

Significance: The inspectors assessed the significance of the finding using Appendix G, Shutdown Safety SDP. The inspectors determined that the performance deficiency degraded the ability to close or isolate the containment, and as a result, Appendix G, 1, Exhibit 4, directed entry into Inspection Manual Chapter 0609, Appendix H, Containment Integrity Significance Determination Process. The inspectors applied Appendix H, Section 07.02, Approach for Assessing Type B Findings at Shutdown, Step 2.1, to the finding. At the time of the event, the plant operating status (POS) was POS 3, which represents the Mode 5 shutdown condition when the RPV water level is the minimum level required for movement of irradiated fuel assemblies within the RPV. The inspectors determined that the finding was of very low safety significance (Green) because it:

(1) did not occur in POS 1 or POS 2;
(2) did not occur in TW-E (Early Time Window); and
(3) it did not occur within 8 days of the start of the outage.

Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. Specifically, the licensee failed to implement a process of planning, controlling, and executing work, resulting in a breach of secondary containment that was not recognized as a secondary containment penetration that needed to be verified to be capable of isolation by TS 3.5.2, Condition C, for the RPV water inventory control activity.

Enforcement:

Violation: Technical Specification (TS) 3.5.2, RPV Water Inventory Control, requires, in part, that in Modes 4 and 5, drain time of RPV water inventory to the top of active fuel (TAF)shall be 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The TS action statement requires that, with Drain time < 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, verify each secondary containment penetration flow path is capable of being isolated in less than the drain time within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or initiate action to restore drain time to 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> immediately.

Contrary to the above, on October 10, 2018, for approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, while in Mode 5, the licensee failed to ensure the drain time of RPV water inventory to the TAF was 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> or take the required actions. Specifically, with the drain time of < 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the licensee failed to verify each secondary containment penetration flow path was capable of being isolated in less than the drain time within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or initiate action to restore drain time to 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> immediately. In particular, improperly sequenced RHRSW work created an unplanned and unrecognized breach of secondary containment, which resulted in the licensee failing to identify the need to take the TS required actions.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 22, 2019, the inspectors presented the Public Radiation Safety Cornerstone inspection results to Mr. J. Sullivan, General Manager Plant Operations, and other members of the licensee staff.
  • On September 19, 2019, the inspectors presented the Evaluations of Changes, Tests, and Experiments inspection results to Mr. J. Sullivan, General Manager of Plant Operations, and other members of the licensee staff.
  • On October 17, 2019, the inspectors presented the integrated inspection results to Mr. J. Sullivan, General Manager Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04Q Drawings

2006, Sheet 4

Flow Diagram Control Building Service Water System

71111.04Q Drawings

2036, Sheet 1

Flow Diagram Reactor Building Service Water System

A6

71111.04Q Drawings

2043

Flow Diagram Reactor Core Isolation Coolant and Reactor

Feed Systems

71111.04Q Drawings

2045, Sheet 1

Flow Diagram Core Spray System

N58

71111.04Q Procedures

2.2.67

Reactor Core Isolation Cooling System

71111.04Q Procedures

2.2.67.1

Reactor Core Isolation Cooling System Operations

71111.04Q Procedures

2.2.67A

Reactor Core Isolation Cooling System Component Checklist

71111.04Q Procedures

2.2.67B

Reactor Core Isolation Cooling System Instrument Valve

Checklist

71111.04Q Procedures

2.2.74A

Standby Liquid Control System Component Checklist

71111.04Q Procedures

2.2.74B

Standby Liquid Control System Instrument Valve Checklist

71111.04Q Procedures

2.2.9

Core Spray System

71111.04Q Procedures

2.2A.CS.DIV2

Core Spray Component Checklist (DIV 2)

71111.04Q Procedures

2.2A.RHRSW.DIV1 RHR Service Water Booster Pump System Component

Checklist

71111.04Q Procedures

2.2B.CS.DIV2

Core Spray System Instrument Valve Checklist (DIV 2)

71111.04Q Procedures

2.2B.RHRSW.DIV1 RHR Service Water Booster Pump System Instrument Valve

Checklist

71111.04Q Work Orders

WO 211509

71111.05Q Corrective Action

Documents

CR-CNS-

2019-03631

71111.05Q Engineering

Evaluations

EE 10-055

Conduit Internal Seals

71111.05Q Fire Plans

CNS-FP-136

Fire Area Boundary Drawing

71111.05Q Fire Plans

CNS-FP-212

Reactor SE Quad, Elevations 881 and 859

71111.05Q Fire Plans

CNS-FP-285

Fire Barrier Penetration Seal Details

71111.05Q Miscellaneous

CNS-FP-234

Office Building Cable Expansion Room Elevation 918 6

71111.05Q Miscellaneous

CNS-FP-39

Reactor Building Suppression Pool Elevation 859-9

71111.05Q Miscellaneous

NEDC 10-080

Fundamental Fire Protection Program and Design Elements

Review

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05Q Procedures

0-BARRIER-MAPS

Barrier Maps

71111.05Q Procedures

0-BARRIER-MAPS

Barrier Maps

71111.05Q Procedures

0-BARRIER-

REACTOR

71111.05Q Procedures

0.7.1

Control of Combustibles

71111.05Q Procedures

3.6.1

Fire Barrier Control

71111.05Q Procedures

6.FP.606

Fire Barrier/Penetration Seal Visual Examination

71111.06

Corrective Action

Documents

CR-CNS-

2017-00229, 2019-02931, 2019-04268, 2019-05066, 2019-

271, 2019-05283

71111.06

Procedures

0-BARRIER

Barrier Control Process

71111.06

Procedures

0-BARRIER-

REACTOR

71111.11Q Miscellaneous

RMP 31-013

Quarterly Downpower, 10-EN-RE-215/6CO, Att 2

71111.11Q Procedures

10.13

Control Rod Sequence and Movement Control

71111.11Q Procedures

10.9

Control Rod Scram Time Evaluation

71111.11Q Procedures

2.0.3

Conduct of Operations

2

71111.12

Corrective Action

Documents

CR-CNS-

2018-07835, 2019-02127, 2019-02581, 2019-03265, 2019-

03488, 2019-03501, 2019-03934, 2019-03936, 2019-04317,

2019-04336, 2017-04701

71111.12

Engineering

Evaluations

EE-PF02F

Maintenance Rule Function EE-PF02F Performance Criteria

Basis

71111.12

Miscellaneous

Maintenance Rule (a)(1) Evaluation RCIC-PF01 - RCIC

System

0, 1

71111.12

Miscellaneous

8001553-1

Turbine Control Schematic

71111.12

Miscellaneous

RCIC-PF01

Maintenance Rule Function RCIC-PF01 Performance Criteria

Basis

71111.12

Procedures

3-EN-DC-206

Maintenance Rule (a)(1) Process

3C3

71111.12

Procedures

6.2HV.601

Air Flow Test of Fan Coil Unit FC-R-1E (DIV 2)

71111.12

Work Orders

WO 5312924

71111.13

Corrective Action

Documents

CR-CNS-

2019-03936, 2019-03947, 2019-03964, 2019-04218, 2019-

04347

71111.13

Drawings

18-900# Gate Valve - R.S.-Press Seal Cast STL WCB -

Stellite Trim - B.W. Ends SMB-2 (60#) Motor Operator

760-3

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.13

Miscellaneous

Critical Evolutions Meeting Presentation - RF-MOV-29MV

Reactor Feed Pump A Discharge Valve, Packing Gland

Leak Injection

71111.13

Miscellaneous

Risk Management Plan - RF-MOV-29MV Reactor Feed

Pump A Discharge Valve, Packing Gland Leak Injection

71111.13

Miscellaneous

Protected Equipment Tracking Form - ESST Planned Work

Window

08/21/2019

71111.13

Miscellaneous

Protected Equipment Tracking Form - SLC A LCO

07/08/2019

71111.13

Miscellaneous

Protected Equipment Tracking Form - Core Spray B 1933

Maintenance Window

08/13/2019

71111.13

Miscellaneous

Protected Equipment Tracking Form - RCIC inoperable

07/24/2019

71111.13

Miscellaneous

284609-03

Work Plan, RF-MOV-29MV

71111.13

Miscellaneous

284609-05

Work Plan, RF-MOV-29MV

71111.13

Procedures

0-CNS-WM-104

Online Schedule Risk Assessment

71111.13

Procedures

0-CNS-WM-104

1, Risk Characterization, for WO 5284609-5

71111.13

Procedures

0-PROTECT-EQP

Protected Equipment Program

71111.13

Work Orders

WO 201509, 5209480, 5211242, 5211244, 5211377, 5211509,

284609-Rev. 3, 5284609-Rev. 5, 5309711

71111.15

Corrective Action

Documents

CR-CNS-

2017-04701, 2019-02127, 2019-03189, 2019-03478, 2019-

03860, 2019-03889, 2019-03934, 2019-03936, 2019-04317,

2019-04336

71111.15

Drawings

2040, Sheet 2

Flow Diagram - Residual Heat Removal Sys Loop B

71111.15

Engineering

Evaluations

EE 10-073

Deletion of Type C Testing of One Barrier due to Closed Loop

Analysis for 9 Pens

71111.15

Miscellaneous

CNS Original Custom Technical Specifications

71111.15

Miscellaneous

LO 2019-0045

Part 21 Issue

06/07/2019

71111.15

Miscellaneous

USQE-1999

Combine Table V-2-7 and Table VII-3-1

71111.15

Procedures

6.2HV.601

Air Flow Test of Fan Coil Unit FC-R-1E (DIV 2)

71111.15

Procedures

6.2SW.401

Diesel Generator Service Water Check Valve and Sump Test

(IST) (DIV 2)

71111.15

Work Orders

WO 5166780, 5196337, 5312924

71111.17T

Calculations

NEDC 92-064

Transient Temperature Rise in SWBP Room After Loss of

Cooling

71111.17T

Calculations

NEDC 94-034B

CNS Containment System Response for NPSH Analysis

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.17T

Calculations

NEDC 97-044A

NPSH Margins for the RHR and CS Pumps

71111.17T

Calculations

NEDC 97-044D

RHR and HPCI NPSH Margins for ATWS Event

71111.17T

Corrective Action

Documents

CR-CNS-

2019-02345, 2019-02364, 2019-03587, 2019-03790, 2019-

03880, 2019-04668

71111.17T

Corrective Action

Documents

Resulting from

Inspection

CR-CNS-

2019-04959

71111.17T

Drawings

CNS-EE-319

SSST OPP Cabinets #1 and #2 Connection Diagram

71111.17T

Drawings

3001

Main One Line Diagram

71111.17T

Drawings

3006, Sh. 5

Auxiliary One Line Diagram MCC Z, SWGR Bus 1A, 1B, 1E,

& Critical SWGR Bus 1F 1G

71111.17T

Drawings

3006, Sh. 5

Auxiliary One Line Diagram Starter Racks LZ and TZ MCCs

K, L, LX, RA, RX, S, T, TX, X

71111.17T

Drawings

3017, Sh. 1

4160V Switchgear Elementary Diagrams

71111.17T

Drawings

20, Sh. 4

4160V Switchgear Elementary Diagrams

71111.17T

Drawings

3031, Sh. 3

Control Elementary Diagrams Switch Developments

71111.17T

Drawings

3040, Sh. 9

Control Elementary Diagram

71111.17T

Drawings

253, Sh. DT4

460V Motor Control Centers Wiring Details, Connection

Wiring Diagram

71111.17T

Drawings

3700, Sh. 19

Annunciator Elementary Ladder Diagram

N09

71111.17T

Drawings

791E271, Sh. 6

HPCI System Elementary Diagram

71111.17T

Drawings

CNS-EE-320

ESST OPP Cabinets #1 and #2 Connection Diagram

71111.17T

Drawings

IL-E-70-3, Sh.

107B

Area Temp. Monitoring System for Nuclear Boiler Systems

Leak Detection

71111.17T

Drawings

IL-E-70-3, Sh.

107BB

Area Temperature Monitoring System for Nuclear Boiler

Systems Leak Detection

71111.17T

Drawings

NC 02161

One-line Switching Diagram 345KV/161KV/4160V

71111.17T

Drawings

NC 43456

Cooper 161kV Substation One-line Switching Diagram

71111.17T

Drawings

NC 66688

Cooper 345kV Substation One-line Switching Diagram

71111.17T

Drawings

OPP-ELE-B101,

Pg. 1 of 18

Open Phase Detection and Protection System

71111.17T

Drawings

OPP-ELE-B101,

Pg. 2 of 18

Open Phase Detection and Protection System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.17T

Drawings

OPP-ELE-B101,

Sh. 3 of 18

Open Phase Detection and Protection System

71111.17T

Drawings

OPP-ELE-B101,

Sh. 4 of 18

Open Phase Detection and Protection System

71111.17T

Drawings

OPP-ELE-B101,

Sh. 5

Open Phase Detection and Protection System

71111.17T

Drawings

OPP-ELE-B101,

Sh. 6

Open Phase Detection and Protection System

71111.17T

Drawings

OPP-ELE-B101,

Sh. 7

Open Phase Detection and Protection System

71111.17T

Drawings

OPP-ELE-B101,

Sh. 8 of 18

Open Phase Detection and Protection System

71111.17T

Drawings

SKE-EC-

6016502-3

HPCI Flow Control Wiring Diagram

71111.17T

Engineering

Changes

DEC 5243039

Emergency Diesel Generator Indicating Light Isolation

71111.17T

Engineering

Changes

EC 6016502

HPCI Flow Control

71111.17T

Engineering

Changes

EC 60387820

Main Generator Under Frequency Relay Replacement

71111.17T

Engineering

Changes

EC 6040480

SWBP Oil Sight Glasses and Reservoir

71111.17T

Engineering

Evaluations

EE 16-021

Engineering Evaluation for 161KV Low Voltage Limit

71111.17T

Engineering

Evaluations

EE 16-048

Engineering Evaluation MCC-L and MCC-T to Non-Essential

71111.17T

Engineering

Evaluations

EE 18-012

Re-Evaluation of Torus Inspection Frequency During Period

of Extended Operation

71111.17T

Engineering

Evaluations

EE 18-028

Various MOV Packing Load Adjustment Calculation

Revisions

71111.17T

Engineering

Evaluations

EE 18-045

HPCI LOC HX Thermal Performance and Tube Plugging

Margin

71111.17T

Engineering

Evaluations

EE 18-046

RHR and HPCI NPSH Margins for ATWS Event

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.17T

Engineering

Evaluations

EE 19-018

REC HX Allowable Tube Plugging Increase

71111.17T

Engineering

Evaluations

EE-18-021

Engineering Evaluation for Reclassifying Relays

HV-REL-1CFX and HV-REL-1DFX to Non-Essential

15C11

71111.17T

Engineering

Evaluations

MDE-270-1285

Evaluation of ATWS Performance at Cooper Nuclear Station

December

1985

71111.17T

Miscellaneous

CDA-EE-001-C1

Control Group Assessment - Open Phase Protection System

Controller (CRIO-9068)

71111.17T

Miscellaneous

CDA-EE-001-ES

Control Group Assessment - Open Phase Protection System

Injection Source

71111.17T

Miscellaneous

CDA-EE-001-ES1

Control Group Assessment - Open Phase Protection System

DC Power Supply

71111.17T

Miscellaneous

CDA-EE-001-KP

Control Group Assessment - Open Phase Protection System

Keypad

71111.17T

Miscellaneous

CDA-EE-001-R

Control Group Assessment - Open Phase Protection System

Recorder

71111.17T

Miscellaneous

CDA-EE-001-REL

Control Group Assessment - Open Phase Protection System

Current Switch

71111.17T

Miscellaneous

CDA-EE-001-UPS

Control Group Assessment - Open Phase Protection System

UPS

71111.17T

Miscellaneous

CDA-EE-0013

Functional Description and Consequence Analysis

71111.17T

Miscellaneous

IEGR-MN-699

Vendor Manual Open Phase Protection (OPP) System

Operating and Maintenance Manual

1.03

71111.17T

Miscellaneous

NLS2018053

l0 CFR 50.59(dX2) and 10 CFR 72.48(dX2) Summary Report

Cooper Nuclear Station, Docket No. 50-298, License

No. DPR-46

10/08/2018

71111.17T

Miscellaneous

RCE 2017-07513

Both EDGs Declared Inoperable Due to Test Failure of Spare

Indicating Light

71111.17T

Procedures

0-CNS-LI-100

Process Applicability Determination

71111.17T

Procedures

0-CNS-LI-101

CFR 50.59 Evaluations

71111.17T

Procedures

0-CNS-LI-112

CFR 72.48 Evaluations

71111.17T

Procedures

0-EN-HU-106

Procedure and Work Instruction Use and Adherence

3C2

71111.17T

Procedures

2.0.1.3

Time Critical Operator Action Control and Maintenance

71111.17T

Procedures

2.1.11.1

Turbine Building Data

178

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.17T

Procedures

2.2.70

RHR Service Water Booster Pump System

71111.17T

Procedures

2.3_R-1

Alarm Procedure for Panel R - Annunciator R-1

71111.17T

Procedures

2.4HVAC

Computer Room Ventilation Failure/Temperature High

71111.17T

Procedures

3-ED-DC-167

Classification of Structure, Systems, and Component

4C2

71111.17T

Procedures

3-EN-DC-115

Engineering Change Process

15C14

71111.17T

Procedures

6.1EE.302

4160V Bus 1F Undervoltage Relay and Relay Timer

Functional Test (DIV 1)

71111.17T

Procedures

6.1EE.306

4160V Bus 1F Undervoltage Relay Channel Functional Test

(DIV 1)

71111.17T

Procedures

7.2.14

RHR SWBP Overhaul and Replacement

71111.17T

Procedures

7.3.41

Examination, Repair, High Pot Testing of Non-Segregated

Buses and Associated Equipment

71111.17T

Procedures

IP-ENG-001

Standard Design Process

0C0

71111.17T

Self-Assessments 2019-0098

50.59 Pre-Inspection Focused Self-Assessment

71111.17T

Self-Assessments QAD 2018-008

QA Audit 18-02, "Engineering"

03/27/2018

71111.19

Corrective Action

Documents

CR-CNS-

2017-04701, 2019-03889, 2019-04141, 2019-04142, 2019-

209, 2019-04222, 2019-04317, 2019-04336

71111.19

Miscellaneous

SW-CV-37 Leakage Troubleshooting Plan

71111.19

Miscellaneous

11628207

Notification

71111.19

Procedures

2.2.8

Control Rod Drive System

106

71111.19

Procedures

6.2CS.101

Core Spray Test Mode Surveillance Operation (IST) (DIV 2)

71111.19

Procedures

6.2CS.201

CS Motor Operated Valve Operability Test (IST) (DIV 2)

71111.19

Procedures

6.2HV.601

Air Flow Test of Fan Coil Unit FC-R-1E (DIV 2)

71111.19

Procedures

6.2SW.401

Diesel Generator Service Water Check Valve and Sump Test

(IST) (DIV 2)

71111.19

Procedures

6.CRD.201

North and South SDV Vent and Drain Valve Cycling, Open

Verification, and Timing Test

71111.19

Procedures

6.SC.501

Secondary Containment Leak Test

71111.19

Procedures

6.SC.502

Secondary Containment Penetration Examination

71111.19

Procedures

7.0.10

Railroad Airlock Door Operations

71111.19

Procedures

7.0.5

Post-Maintenance Testing

71111.19

Work Orders

WO 201509, 5209480, 5210423, 5211242, 5211244, 5211377,

265105, 5309143, 5312924

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.22

Corrective Action

Documents

CR-CNS-

2019-23824

71111.22

Miscellaneous

2174

Vendor Manual - Mohr SFP-1 Level Prove Assembly

Technical Manual

2/13/2015

71111.22

Procedures

14.41.1.2

FPC-LIT-2 Testing

71111.22

Procedures

2.2.32

Fuel Pool Cooling and Demineralizer System

105

71111.22

Procedures

2.2.84

HVAC Main Control Room and Cable Spreading Room

71111.22

Procedures

6.2DG.101

Diesel Generator 31 Day Operability Test (IST) (DIV 2)

71111.22

Procedures

6.HV.105

Control Room Envelope Pressurization and CREFS Flow

Test

71111.22

Procedures

6.REC.201

REC Motor Operated Valve Operability Test (IST)

71111.22

Work Orders

WO 5195163, 5234083

71114.06

Miscellaneous

Drill Scenario Guide

07/30/2019

71124.05

Calibration

Records

5149599

Area Radiation Monitors Calibration and Functional Test

09/20/2018

71124.05

Calibration

Records

5156820

SW Radiation Monitor - B Calibration Check and Instrument

Channel Test - RMP-RM-332B

05/16/2018

71124.05

Calibration

Records

5166729

High Range Containment Monitor Victoreen Model 875

Source Calibration Check

10/03/2018

71124.05

Calibration

Records

5166732

Containment High Range Monitors A/R/H Determination

10/03/2018

71124.05

Calibration

Records

5166734

Main Steam Line Process Radiation Monitor Channel

Calibration, Source Test, and Setpoint Determination

RMP-RM-251A/B/C/D Data Sheets

10/04/2018

71124.05

Calibration

Records

5167782

Containment High Range Area Monitor Channel Calibration

RMA-RM-40 A/B

08/29/2018

71124.05

Calibration

Records

5167787

Main Steam Line Process Radiation Monitor Channel

Calibration, Source Test, and Setpoint Determination

RMP-RM-251A/B/C/D Data Sheets

09/11/2018

71124.05

Calibration

Records

5186806

REC Radiation Monitor Calibration Check and Instrument

Channel Test

05/01/2019

71124.05

Calibration

Records

Detector 1

Inch Particulate Filter at 5 cm

05/03/2017

71124.05

Calibration

Detector 1

2000 ml Marinelli with 1.5 Density

05/17/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Records

71124.05

Calibration

Records

Detector 1

500 cc Charcoal Marinelli

10/05/2018

71124.05

Calibration

Records

Detector 1

Charcoal Cartridge at 5 cm

05/05/2017

71124.05

Calibration

Records

DG11095729

Tri-Carb 2910TR Efficiency Calibration

2/28/2019

71124.05

Calibration

Records

RP-10571

Instrument Calibration Sheet (PCM-2) S/N 401

07/03/2019

71124.05

Calibration

Records

RP-10588

RMV-CAM-20 Particulate & Iodine Calibration Sheets

03/27/2019

71124.05

Calibration

Records

RP-10765/11497

Instrument Calibration Data Sheet - AMS-4

01/19/2019

71124.05

Calibration

Records

RP-10848

XLB Calibration Data Sheet - Unit 1

01/23/2019

71124.05

Calibration

Records

RP-11152

Instrument Calibration Sheet Thermo Eberline SAM

Contamination Monitor

05/22/2019

71124.05

Calibration

Records

RP-11178

PM-12 Calibration Data Sheet S/N 0902PM1207

06/11/2018

71124.05

Calibration

Records

RP-11241

Instrument Calibration Data Sheet - DRM-1 or DRM-2

06/25/2019

71124.05

Calibration

Records

RP-11376

Instrument Calibration Data Sheet - RO-20

2/14/2019

71124.05

Calibration

Records

RP-11724

Instrument Calibration Data Sheet - H-809V1

06/10/2019

71124.05

Corrective Action

Documents

CR-CNS-

2017-06407, 2017-06689, 2018-03723, 2018-05687, 2018-

06543, 2018-08139, 2019-00818, 2019-00866, 2019-00880,

2019-01310, 2019-01442, 2019-02130, 2019-02362, 2019-

2669

71124.05

Miscellaneous

PCM-2 Weekly Source Checks

08/18/2019

71124.05

Miscellaneous

PM-7/PM-12 Daily/Weekly Source Checks

08/20/2019

71124.05

Miscellaneous

SAM-11 / SAM-12 Weekly Functional Checks

08/18/2019

71124.05

Miscellaneous

CNS System Health Report - RM

06/2019

71124.05

Miscellaneous

Results of Radiochemistry Cross Check Program (Quarterly

2/13/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Results)

through

06/05/2019

71124.05

Miscellaneous

878-10

Source Calibration Certificate (S/N 135)

06/26/2003

71124.05

Miscellaneous

878-10A

Source Calibration Certificate (S/N 126)

09/24/2003

71124.05

Miscellaneous

878-10B

Source Calibration Certificate (S/N 121)

09/18/2003

71124.05

Procedures

15.ARM.302

Area Radiation Monitors Calibration and Functional Test

71124.05

Procedures

6.PRM.322

Containment High Range Area Monitor Channel Calibration

71124.05

Procedures

6.PRM.323

High Range Containment Monitor Victoreen Model 875

Source Calibration Check

71124.05

Procedures

6.PRM.324

Main Steam Line Process Radiation Monitor Channel

Calibration, Source Test and Setpoint Determination

71124.05

Procedures

6.PRM.326

Drywell Air Sampling System Known Source Calibration and

Functional Test

71124.05

Procedures

6.PRM.329

Containment High Range Monitors A/R/H Determination

71124.05

Procedures

6.PRM.331

SW Radiation Monitor A Calibration Check and Instrument

Channel Test

71124.05

Procedures

8-CNS-CY-102

Laboratory Analytical Quality Control

71124.05

Procedures

8-CNS-CY-110

Canberra APEX Gamma Spectroscopy System Operation

71124.05

Procedures

8.5.2.4

Tri-Carb 2910TR Liquid Scintillation System

71124.05

Procedures

9.INST.15

Rem 500 Neutron Survey Meter

71124.05

Procedures

9.INST.53

Ion Chamber Survey Instrument Eberline Model RO-20

71124.05

Procedures

9.INST.57

Friskers

71124.05

Procedures

9.INST.64

Thermo Electron Corporation Small Articles Monitor (SAM)

71124.05

Procedures

9.INST.68

WR Telepole GM Survey Instrument

71124.05

Self-Assessments LO 2018-0186-04

Radiological Monitoring Instrumentation and Radioactive

Solid Waste Processing and Radioactive Material Handling,

Storage, and Transport

05/17/2019

71124.05

Self-Assessments QAD 2018-019

QA Audit 18-05, "Radiological Controls"

08/23/2018

71124.06

Corrective Action

Documents

CR-CNS-

2017-04647, 2017-05654, 2017-05888, 2017-06574, 2018-

00199, 2018-02613, 2018-03046, 2018-03588, 2018-04125,

2018-04354, 2018-04569, 2018-04936, 2018-05167, 2018-

07906, 2018-07922, 2019-01916, 2019-02850, 2019-02904,

2019-03082, 2019-03460, 2019-03497, 2019-03946

71124.06

Miscellaneous

Teledyne Brown Engineering Environmental Services

07/20/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Laboratory Quality Control Program: 2nd Quarter 2019

Quality Assurance Report

71124.06

Miscellaneous

Teledyne Brown Engineering Environmental Services

Laboratory Quality Control Program: 4th Quarter 2018 Quality

Assurance Report

2/04/2019

71124.06

Miscellaneous

20-AUG-19-

210006

Gama Spectrum Analysis: ERP Particulate

08/20/2019

71124.06

Miscellaneous

Liquid Radioactive

Waste Discharge

Form

Liquid Radioactive Waste Discharge Form: Floor Drain

Sample Tank (FDST)

08/17/2018

71124.06

Miscellaneous

Liquid Radioactive

Waste Discharge

Form

Liquid Radioactive Waste Discharge Form: Floor Drain

Sample Tank (FDST)

11/17/2018

71124.06

Miscellaneous

Liquid Radioactive

Waste Discharge

Form

Liquid Radioactive Waste Discharge Form: Floor Drain

Sample Tank (FDST)

2/31/2018

71124.06

Miscellaneous

Liquid Radioactive

Waste Discharge

Form

Liquid Radioactive Waste Discharge Form: Floor Drain

Sample Tank (FDST)

03/27/2019

71124.06

Miscellaneous

Liquid Radioactive

Waste Discharge

Form

Liquid Radioactive Waste Discharge Form: Floor Drain

Sample Tank (FDST)

04/02/2019

71124.06

Miscellaneous

Liquid Radioactive

Waste Discharge

Form

Liquid Radioactive Waste Discharge Form: Floor Drain

Sample Tank (FDST)

05/25/2019

71124.06

Miscellaneous

Liquid Radioactive

Waste Discharge

Form

Liquid Radioactive Waste Discharge Form: Floor Drain

Sample Tank (FDST)

07/03/2019

71124.06

Miscellaneous

LO-2018-0186-008

Liquid and Gaseous Effluents Focused Self-Assessment

Report

06/05/2019

71124.06

Miscellaneous

NUPIC Audit

24791

NUPIC Audit/Survey: Teledyne Brown Engineering-

Environmental Services

05/09/2019

71124.06

Miscellaneous

NUPIC Audit:

24391

NUPIC Audit/Survey: NCS Corporation

03/30/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.06

Miscellaneous

ODAM

Cooper Nuclear Station Offsite Dose Assessment Manual for

Gaseous and Liquid Effluents

10/03/2018

71124.06

Miscellaneous

ODAM

2018 Annual Land Use Census

07/16/2018

71124.06

Miscellaneous

QAD 2017-0031

Quality Assurance (QA) Audit 17-07: "Chemistry and

Radiological Effluent and Environmental Monitoring Program"

10/11/2017

71124.06

Procedures

6.1SGT.501

SGT A Carbon Sample, Carbon Absorber and HEPA Filter In-

Place Leak Test, and Components Leak Test (DIV 1)

71124.06

Procedures

6.2SGT.501

SGT B Carbon Sample, Carbon Absorber and HEPA Filter In-

Place Leak Test, and Components Leak Test (DIV 2)

71124.06

Procedures

6.HV.104

Control Room Emergency Filter System Flow Test, Charcoal

and HEPA Filter Leak Test, Filter DP Test, and Charcoal

Sample Analysis

71124.06

Procedures

6.PRM.306

Liquid Radwaste Effluent Flow Monitor Channel Calibration

71124.06

Procedures

6.PRM.308

Liquid Radwaste Effluent System Channel Calibration

71124.06

Procedures

6.PRM.310

ERP Kaman Monitor Channel Calibration

71124.06

Procedures

6.PRM.313

Reactor Building Kaman Monitor Channel Calibration

71124.06

Procedures

6.PRM.320

Radwaste Building Kaman Monitor Channel Calibration

71124.06

Procedures

6.PRM.328

Kaman Sample Flow System Channel Calibration

71124.06

Procedures

8-CNS-CY-102

Laboratory Analytical Quality Control

71124.06

Procedures

8.11.1

EFFECTS Program

71124.06

Procedures

8.8.1.19

Effluent Composite Sample Preparation and Analysis

71124.06

Procedures

8.8.11

Liquid Radioactive Waste Discharge Authorization

71124.06

Procedures

8.8.ERP

Particulate and Iodine Sample Collection for ERP Effluent

71124.06

Procedures

8.8.RW

Particulate and Iodine Sample Collection for Radwaste

Building Effluent

71124.06

Procedures

8.8.RX

Particulate and Iodine Sample Collection for Reactor Building

Effluent

71124.06

Procedures

8.8.TB

Particulate and Iodine Sample Collection for Turbine Building

Effluent

71124.06

Work Orders

WO 28538, 5034888, 5043642, 5078036, 5078037, 5080852,

5094262, 5114291, 5119827, 5123375, 5132845, 5147008,

5149663, 5166229, 5166230, 5180017, 5183064, 5189063,

5191559, 5202504, 5226340, 5285586

71124.07

Calibration

7318

Sample Station No. 7 Pump

04/10/19

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Records

71124.07

Calibration

Records

7319

Sample Station No. 2 Pump

04/23/19

71124.07

Calibration

Records

21

Sample Station No. 111

04/10/19

71124.07

Calibration

Records

7453

Sample Station No. 8

71124.07

Calibration

Records

7454

Sample Station No. 10

04/10/19

71124.07

Calibration

Records

7455

Sample Station No. 1 Pump

04/10/19

71124.07

Calibration

Records

7539

Sample Station No. 9

04/10/19

71124.07

Corrective Action

Documents

CR-CNS-

2017-06303, 2017-06091, 2017-06726, 2018-00145, 2018-

00508, 2018-00643, 2018-01230, 2018-01646, 2018-02826,

2018-03600, 2018-04300, 2018-07515, 2019-01684, 2019-

2054, 2019-02653, 2019-02693, 2019-02772, 2019-02966,

2019-03245

71124.07

Miscellaneous

2018 Land Use Census

07/11/18

71124.07

Miscellaneous

2018 Cooper Nuclear Station Radioactive Effluent Release

Report

2018

71124.07

Miscellaneous

2017 Cooper Nuclear Station Radioactive Effluent Release

Report

2017

71124.07

Miscellaneous

Cooper Radiological Environmental Monitoring Program

2017 Annual Report

2/31/17

71124.07

Miscellaneous

Cooper Radiological Environmental Monitoring Program

2017 Annual Report

2/31/18

71124.07

Miscellaneous

2019 Land Use Census

07/15/19

71124.07

Procedures

8.ENV.1

CNS Radiological Environmental Monitoring Program

Administration

71124.07

Procedures

8.ENV.4

CNS Environmental Air Pump Calibration and Maintenance

71124.07

Procedures

8.ENV.5

Annual Review of Broadleaf Vegetation Sample Locations

Procedure

71124.07

Procedures

8.ENV.8

Administering the CNS Meteorological Program (CNS MET)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.07

Procedures

8.ENV.9

Ground Water Monitoring Program Sampling, Monitoring, and

Administrative Requirements

71124.07

Procedures

14.MET.304

Meteorological Maintenance Procedure for New 100-Meter

Tower - System A

71124.07

Procedures

14.MET.305

Meteorological Maintenance Procedure for New 100-Meter

Tower - System B

71124.07

Procedures

8.ENV.2

REMP Sampling

71124.07

Procedures

8.ENV.3

Action Levels for Environmental Samples

71124.07

Self-Assessments

CNS Environmental Program Self-Assessment Support in

Advance of NRC Inspection

07/24/19

71124.07

Self-Assessments

Cooper Nuclear Station 2018 Environmental Assessment

07/26/18

71124.07

Self-Assessments LO Number: 2018-

0186-008 -

Assessment

Report

Radiological Environmental Monitoring Program Focused

Self-Assessment Report

06/06/19

71124.07

Self-Assessments NUPIC

Audit/Survey

Number: 24229

Duke Energy / NUPIC QA Audit of GEL Laboratories -

October 2016

11/01/16

71124.07

Self-Assessments NUPIC

Audit/Survey

Number: 24791

Radioanalytical Laboratory Audit Report: Teledyne Brown

Engineering-Environmental Services

04/19/19

71124.07

Self-Assessments SS17-009

4500187675 "2016-2018 Environmental TLD Service"

11/06/17

71124.08

Corrective Action

Documents

CR-CNS-

2017-02377; 2017-06224; 2017-06352; 2018-00572; 2019-

01039; 2019-02631

71124.08

Corrective Action

Documents

Resulting from

Inspection

CR-CNS-

2019-04451; 2019-04462

71124.08

Miscellaneous

Gamma Spectrum Analysis of ERP Tower Silt

07/31/2019

71124.08

Miscellaneous

2017 Cooper Nuclear Station Radioactive Effluent Release

Report

2017

71124.08

Miscellaneous

2018 Cooper Nuclear Station Radioactive Effluent Release

Report

2018

71124.08

Miscellaneous

Onsite Radioactive Material Storage Areas

08/05/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.08

Miscellaneous

Offsite Radioactive Material Storage Inventory

05/20/2019

71124.08

Miscellaneous

Radioactive Material Storage Building Inventory

08/06/2019

71124.08

Miscellaneous

Top Ten Equipment Reliability Action Plan - Radwaste

System Reliability

08/05/2019

71124.08

Miscellaneous

469062001

Waste Stream Analysis for Dry Active Waste

11/14/2018

71124.08

Miscellaneous

CNS-RP-602

CNS Radioactive Material Shipment Log - 2017

2017

71124.08

Miscellaneous

CNS-RP-602

CNS Radioactive Material Shipment Log - 2018

2018

71124.08

Miscellaneous

CNS-RP-602

CNS Radioactive Material Shipment Log - 2019

2019

71124.08

Procedures

0.PCP.1

Process Control Program

71124.08

Procedures

2.5.4.4

NUPAC Dewatering System

71124.08

Procedures

59.RW.10

Physical Protection of Category I Quantities of Radioactive

Material in Transit

71124.08

Procedures

9.ENN-RP-106-1

Radiation and Contamination Surveys

71124.08

Procedures

9.RADOP.10

Radioactive Source Control and Accountability

71124.08

Procedures

9.RADOP.14

Off-Site Radioactive Material Storage

71124.08

Procedures

9.RW.1

Radioactive Shipments

71124.08

Procedures

9.RW.3

Dry Radioactive Waste Classification/Listing and Radioactive

Material Shipments

71124.08

Procedures

9.RW.5

Control of On-Site Storage of RWCU and Condensate Resins

and Wastes (Transfer Out of Storage)

71124.08

Procedures

9.RW.6

Control of On-Site Dry Active Waste Storage

71124.08

Procedures

9.RW.7

Waste Stream Sampling

71124.08

Procedures

9.RW.9

Filling Containers with Waste/Radioactive Material

71124.08

Radiation

Surveys

CNS-1904-0013

Underwater Survey of Spent Fuel Pool

04/11/2019

71124.08

Radiation

Surveys

CNS-1906-0000

OCA 903' - Rad Material Storage Building

06/04/2019

71124.08

Radiation

Surveys

CNS-1906-0013

Multipurpose Facility (MPF) 903'

06/25/2019

71124.08

Radiation

Surveys

CNS-1907-0006

Horizontal Storage Module (HSM) ISFSI Pad

07/08/2019

71124.08

Radiation

Surveys

CNS-1907-0007

Horizontal Storage Module (HSM) ISFSI Pad Top View

07/08/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.08

Radiation

Surveys

CNS-RP-138

Alpha/Beta Smear Count Quarterly Survey of Offsite RAM

Storage

05/08/2019

71124.08

Radiation

Surveys

CNS-RP-508

Low Level Radwaste Storage Building

03/20/2019

71124.08

Self-Assessments

Annual Review of 10 CFR Part 37 Transportation Security

Plan, Hittman Transport, 2018

07/23/2018

71124.08

Self-Assessments LO-2018-0186-04

Self-Assessment: Radiological Monitoring Instrumentation

and Radioactive Solid Waste Processing and Radioactive

Material Handling, Storage, and Transport

04/17/2019

71124.08

Self-Assessments QA 18-05

Radiological Controls Quality Assurance Audit

08/23/2018

71124.08

Shipping Records 17-24

UN3321 RAM - LSA II, Fissile-Excepted, 7, RQ, Spent Resin

10/17/2017

71124.08

Shipping Records 17-25

UN3321 RAM - LSA II, Fissile-Excepted, 7, Dry Active Waste

2/06/2017

71124.08

Shipping Records 17-26

UN2912 RAM - LSA I, Fissile-Excepted, 7, RQ, Dry Active

Waste

2/15/2017

71124.08

Shipping Records 18-05

UN2912 RAM - LSA I, Fissile-Excepted, 7, RQ, Dry Active

Waste

08/09/2018

71124.08

Shipping Records 18-10

UN3321 RAM - LSA II, Fissile-Excepted, 7, Spent Resin

09/11/2018

71124.08

Shipping Records 18-11

UN3321 RAM - LSA II, Fissile-Excepted, 7, Dry Active Waste

10/11/2018

71124.08

Shipping Records 18-14

UN3321 RAM - LSA II, Fissile-Excepted, 7, Dry Active Waste

2/11/2018

71124.08

Shipping Records 19-01

UN2916 RAM - Type B(U), Fissile-Excepted, 7, RQ, Spent

Resin

03/04/2019

71124.08

Shipping Records 19-03

UN2916 RAM - Type B(U), Fissile-Excepted, 7, RQ, Spent

Resin

04/02/2019

71151

Miscellaneous

3Q18 thru 4Q19 PI Verification Package - Complicated

SCRAMS

71152

Corrective Action

Documents

CR-CNS-

2018-08615, 2019-00171, 2019-01287, 2019-02281, 2019-

2371, 2019-02739, 2019-02791, 2019-02798, 2019-02842,

2019-02875, 2019-04219

71153

Corrective Action

Documents

CR-CNS-

2018-06295

71153

Miscellaneous

CNS Operations Log

10/09/2018

71153

Miscellaneous

CNS Operations Log

10/10/2018

71153

Miscellaneous

LER 2018-002-00

Lack of Procedural Guidance Results in Work Scheduling

Error Causing Breach of Secondary Containment and

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Condition Prohibited by Technical Specifications

71153

Procedures

0-CNS-OU-108

Cooper Shutdown Safety Management Program

71153

Procedures

0-CNS-WM-102

Work Implementation and Closeout

10, 11

71153

Procedures

0.50.5

Outage Shutdown Safety

71153

Procedures

0.Barrier

Barrier Control Process

71153

Work Orders

WO 267091, 5267093