U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT
-
-
REGION I
'
Report No.
50-293/80-10
-
Docket No.
50-293 License No.
DPR-35 Safeguards Group IV Licensee:
Boston Edison Company 800 Boylston Street Boston, Massachusetts ~02199 Facility Name:
Pilgrim Nuclear Power Station Inspection At:
Plymouth, Massachusetts Inspection Conducted:
March 5-7, 1980 Date of Last Material Control and Accounting Inspection:. November 22-23, 1977 Type of Inspection: Unannounced Material Control and Accountino
!
3 /3 !jo Inspectors:
[. [
n%
E. Woltner, Safeguards Auditor date 2Ls y/a /so R. Summers, Safeguards Auditor dhte date Approved by:
f,t W
'
4/2/,eo J.
. Joyner,,4hJef,Jiuclear Material Control
/ date upport Secth#i, Safeguards Branch Inspection Summary:
Areas Inspected:
Full scope material control and accounting including facility organization and operation, physical inventory and inventory verification, records and reports, internal controls, and reports on production and/or depletion of SNM.
The inspection involved 13 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the areas examined during the inspection.
Region I Form 166 (August 1979)