IE Insp Rept 50-293/80-10 on 800305-07.No Noncompliance Noted.Major Areas Inspected:Full Scope Matl Control & Accounting,Including Facility Organization & Operation. Details Withheld (Ref 10CFR2.790)
ML19310A107
Person / Time
Site: Pilgrim
Issue date: 04/03/1980
From: Joyner J, Roxanne Summers, Woltner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19310A104 List:
References
50-293-80-10, NUDOCS 8006060101
Download: ML19310A107 (1)


Text

r l

U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT

-

-

REGION I

'

Report No.

50-293/80-10

-

Docket No.

50-293 License No.

DPR-35 Safeguards Group IV Licensee:

Boston Edison Company 800 Boylston Street Boston, Massachusetts ~02199 Facility Name:

Pilgrim Nuclear Power Station Inspection At:

Plymouth, Massachusetts Inspection Conducted:

March 5-7, 1980 Date of Last Material Control and Accounting Inspection:. November 22-23, 1977 Type of Inspection: Unannounced Material Control and Accountino

!

3 /3 !jo Inspectors:

[. [

n%

E. Woltner, Safeguards Auditor date 2Ls y/a /so R. Summers, Safeguards Auditor dhte date Approved by:

f,t W

'

4/2/,eo J.

. Joyner,,4hJef,Jiuclear Material Control

/ date upport Secth#i, Safeguards Branch Inspection Summary:

Areas Inspected:

Full scope material control and accounting including facility organization and operation, physical inventory and inventory verification, records and reports, internal controls, and reports on production and/or depletion of SNM.

The inspection involved 13 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the areas examined during the inspection.

Region I Form 166 (August 1979)

8006060)o)