U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPELTION AND ENFORCEMENT
REGION I
Report No.
50-293/79-13 Docket No.
50-293 License No.
DPR-35 Priority Category C
--
Licensee:
Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199 Facility Name:
Pilgrim Nuclear Power Station Inspection At:
Plymouth, Massachusetts Inspection Conducted:
July 12-13, 1979 Inspectors:
7Yt ' [hk 9/h79
-
R. A. McBrearty, Reactor Iffspector
/date date date A -[
M!7Y Approved by:
.
L". E. Tripp/,IChief, Engineering Support
' 'date Section No. 1, RC&ES Branch Inspection Summary:
Inspection on July 12-13, 1979 (Report No. 50-293/79-13)
Areas Inspected:
Routine, unannounced inspection of activities associated with Licensee Event Report Number 79-021/0lX-0. The inspection involved four insLector hours onsite by one regional based NRC inspector.
Results:
No items of noncompliance or deviations were identified.
1281 100 Region I Form 167 7011010h (August 1979)
.
.
.
s
'
DETAILS 1.
Persons Contacted Boston Edison comoany J. Dolan, Maintenance Engineer C. Martin, Maintenance Engineer
- C. Mathis, Senior Plant Engineer
- C. Vantrease, Acting Station Manager
- Denotes those present at the exit interview.
2.
Control Rod Drive (CRD) Return Line Repair During performance of maintenance in the steam tunnel area on July 10, 1979, the licensee observed water dripping from lagging on the CR0 return line.
This was reported to the NRC Region I via LER 79-021/01X-0 on July 11, 1979 after removal of lagging and closer examination of the line revealed a small leak in the area of the inboard weld on the inboard manual isolation valve.
At the time of this inspection the plant was shut down for repairs to the CRD return line and the defective section of pipe, including the valve, was removed.
-
The inspector found that the repairs wero governed by the requirements of Section IWA 4000 of the ASME Boiler and Pressure Vessel Code,Section XI.
The inspector interviewed license personnel and reviewed work procedures and documentation associated with welding and nondestructive examination of the proposed repair in order to ascertain that the applicable require-ments of the ASME B&PV Code were met.
The inspector's review included the following:
Welding Pror9 dure Specification (WPS) number P8-P1-AT-AG for pipe
-
to valve transition weld WPS number P1-AT-LH-3
-
Procedure Qualification Records for the above listed welding
-
procedures Welder Qualification Records for twc welders designated by the
-
licensee to perform welding on the repair 1281 i0:
.
.
.
Radiographic Examination Procedure No. 8000, Revision 0 and
-
Addendum 1 Liquid Penetrant Examination Procedure No. 4300
-
NDE personnel qualification and certification records
-
The inspector's review indicated that the welding procedures and welders were properly qualified in accordance with the applicable requirements of Section IX of the ASME Code and the NDE personnel were found to be certi-fied in accordance with the provisions of the applicable supplement of SNT-TC-1A, the governing document for NDE personnel certification.
No items of noncompliance were identified.
3.
Exit Interview The inspector met with the licensee representatives (denoted in Paragraph 1)
at the conclusion of the inspection on July 13, 1979. The inspector summarized the purpose and the scope of the inspection and the findings.