ML19254E529

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/79-13 on 790712-13.No Noncompliance Noted
ML19254E529
Person / Time
Site: Pilgrim
Issue date: 09/17/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19254E530 List:
References
NUDOCS 7911010436
Download: ML19254E529 (2)


See also: IR 05000293/1979013

Text

.g

/ d.-

.

[p iso *

UNITED STATES

o

NUCLEAR REGULATORY CoMMisstON

[

REGION 1

o

$

g

$31 PARK AVENUE

f

KING OF PRUSSI A, PENNSYLVANIA 19406

%p.....,/

Docket No. 50-29?

SEP 171979

Boston Edison Company M/C Nuclear

ATTN: Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection No. 50-293/79-13

.

This refers to the inspection conducted by R. A. McBrearty of this office on

July 12-13, 1979, at Pilgrim Nuclear Power Station, Plymouth, Massachusetts of

activities authorized by NRC License No. DPR-35 and to the discussions of our

findings hald by Mr. McBrearty with Mr. C. Vantrease of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspec-

tion and Enforcement Inspection Report wt'ch is enclosed with this letter.

Within these areas, the inspection ccasisad of selective examinations of pro-

cedures and representative records, interviews with personnel, and observations

by the inspector.

Within the scope of this inspe.ction, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's ' Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such infonnation from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790. The information sought to be withheld shall be incorpo-

rated as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report will be

placed in the Public Document Room.

1281 m

7911010

@

.

.

-

.

Boston Edison Company M/C Nuclear

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will bc pleased to discuss them with you.

Sincerely,

,..-

-

,

/

K-

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 50-293/79-13

cc w/ encl:

P. J. McGui,t. Pilgrim Station Panager

A. Z. Roisman, Natural Resources Defense Council (Without Report)

1281

C??