IR 05000293/1979012

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-293/79-12 on 790705-06.No Noncompliance Noted.Major Areas Inspected:Verification & Evaluation of Actions Re Physical Protection Program.Details Withheld (Ref 10CFR2.790)
ML19210E562
Person / Time
Site: Pilgrim
Issue date: 09/27/1979
From: Devlin J, Evan Jones
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19210E559 List:
References
50-293-79-12, NUDOCS 7912050262
Download: ML19210E562 (1)


Text

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

Report No.

50-293/79-12 Docket No.

50-293 License No.

DPR-3) _ Safeguards Group IV Licensee:

Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199 Facility Name:

Pilgrim Nuclear Power Station Inspection At:

Plymouth, Massachusetts Inspection Conducted:

July 5-6, 1979 Date of Last Physical Security Inspection Visit:

May 21-25 and May 29-June 1. 197_9 Type of Inspection:

Unannounced,6pecial Physical Security

  1. [,> 7 !~)Q Inspectors:

Q/ c hkt W

/

-Edward W. Jones, Physical Security Inspector

' date

/

lb date date O

'b /

'4^'

t

-

2,

'/

Approved by:

Jf 'W. Devlin, Chief, Security and date<

'

'

' Investigation Section, Safeguards Branch

--

Inspection Summarz:

Areas Inscected:

Verification and evaluation of licensee's actions, with regards to the Physical Protection Program, in response to the Region I Immediate Action Letter, dated June 11, 1979.

The inspection involved 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> on site by one NRC inspector and was begun during regular hours.

Results:

Licensee was found to have taken the appropriate actions stipulated in licensee's letter dated June 19, 1979, which was in response to the Regional IAL.

1500 142 Region I Form 167 (August 1979)

7 9120 5 0 7 6 E