IR 05000289/1978004

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-289/78-04 on 780301-02.No Noncompliance Noted.Major Areas Inspected:B Spent Fuel Pool Mod Per Amend 34 to DPR-50
ML19209C503
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/15/1978
From: Durr J, Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19209C502 List:
References
50-289-78-04, 50-289-78-4, NUDOCS 7910150848
Download: ML19209C503 (4)


Text

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

.

Region I aport No. 50-289/78-04 Docket No. 50-289 License No. DPR-50 Priority Category C

--

Licensee:

Metrocolitan Edison Comoany

_

P. O. Box 542 Readino, Pennsylvania Facility Name: Three Mile Island Nuclear Station, Unit 1 Inspection at: Middletown, Pennsylvania Inspection conducted: March 1-2, 1978 Inspectors: q

.,.,a,,&a>

J// e-/'y Y pJ.P.Ourr,ReactorInspector

' cafe signed

.

cate signed

'

cate si.gned Approved by:

b&

h mg R. C. Haynes, g &ES Branch

., Engineering Support

'da te 'si gned Section No.F, RC

,

Insoection Summary:

Insoection on March 1-2, 1978 (Recort No. 50-289/78-04)

Areas Insoected:

Routine, unannouncea inspection of tne "B" spent fuel pool modification authorized by amendment No. 34 to the Facility Operating License DPR-50.

The inspection involved 12.5 inspector hours on site by one NRC inspector.

Resul ts:

No items of noncompliance were identified in the two areas inspected.

p.:

_ --

~

7910150915

)fil N

.

.

,

.

DETAILS 1.

' Persons Contacted Metrocolitan Edison Comoany

  • R. O. Barley, Lead Mechanical Engineer
  • W. Cotter, Quality Assurance Supervisor

-

  • G. Kunder, Unit 1 Superintendent Technical Support T. O'Connor, Quality Assurance Assistant
  • J. O'Hanlon, Unit 1 Superintendent NUS Corcoration
  • A. E. Caselli, Supervising Engineer
  • denotes those present at the exit interview.

-

2.

"B" Scent Fuel Pool Modification The licensee submitted an apolication, dated February 3,1977, to the USNRC:NRR proposing to modify the "B" spent fuel pool storage capacity from 171 assemblies to 496. The USNRC:NRR issued amend-ment No. 34 to the Facility Operating License No. DPR-50 authorizing the spent fuel pool modification. This inspection was performed to ascertain if licensee commitments and license requirements were being complied with for the modification.

The inspector reviewed selected technical requirements in the following documents to determine if they were consistent with the licensee's comnitments and license requirements.

Spent Fuel Pool Rack Assembly Drawings 5098M2000 through 5098M2006.-

Conformed Specification, Spent Fuel Storage Racks TMI Nuclear Station, Unit 1, Pool 3, GED-CS-19, revision 1.

Quaiity Centrol Ncnconformance Reports NCR Ncs. 78-27, 78-28, and 78-33.

..rk

.ecuest Procecure No. WR *21922

'

-

1412 558 F

.

.

._

Construction Guidelines for Handling and Installation of Fuel Racks, revision C.

P.O. 30059 High Density Spent Fuel Rack Documentation for 2X8 Fuel Rack Assembly.

.

Metropolitan Edison Inter-Office Memorandum, GEM 0044, Janaury 13, 1978, providing Generation Engineering's review and approval of C/M 983.

.

No items of noncompliance or deviations were identified.

The inspector v.isually examined the accessible parts of one of the new spent fuel storage racks to be installed during the modification.

This raci, identified with serial number 16430, had not yet undergone the planned site receipt ins;;ection. The inspector observed what arpeared to be cracks in two welds connecting the fuel box and s

r.hannel (part nos.1 and 3 on drawing 5098M2001, revision 5).

He also noted varying amounts of undercut in the welds.

The Ticensee did not have the fabrication acceptance criteria for these welds available at the time of this inspection to detemine the acceptability

-

of the noted conditions. The licensee issued Nonconfor.ance Report No. 78-37 documenting the cracks and stated that an engineering G

of this evaluation and review by the NRC (78-04-01).

evaluation would be perfomed to ascertain the acceptability of these welds.

This item is considered unresolved pending completion An inspection of the "B" spent fuel pool liner was performed in the areas where the old spent fuel rack hold down bolts had been removed to provide clearance for the installation of the new racks.. It was noted that the bolt removal did not appear to present a hazard to the liner integrity.

No items of noncompliance were identified.

3.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations. An unresolved item disclosed during the inspection is discussed in Paragraph 2.

1412 359

.

  • 4.

Exit Interview The inspector met with licensee representatives (denoted in para.

1) at the conclusion of the inspection on March 2,1978. The

.

inspector surrarized the scope of the inspection and the findings.

-Licensee representatives acknowledged the inspector's findings.

.

.