NRC Inspection' Report:
50-285/89-31 Operating License:
' Docket:
50-285
'
Licensee:
Omaha Public, Power District (OPPD)
1623 ilarney Street Omaha, Nebraska 68102;
' Facility Name:
Fort Calhoun Station (FCS)
Inspection At:
Inspection Conducted:
aly 24-27, 1989 Inspector:
-
hN
'l A. B. Earnest, Physical SecuVity Specialist Date
.
'
Security and Emergency. Preparedness Section O
Approved:
'D. A. Powers, Chief, Security and Emergency.
Date Preparedness.Section Inspec'. ion Summary Inspection Conducted July 24-27, 1989 (Report 50-285/89-31)-
Areae Inspected:
Routine, unannounced inspection of the licensee's physical j
security program.
The areas inspected within the physical security program
~
included training and qualifications, access control for personnel and packages, protection of safeguards information, and compensatory measures.
Results:
Within the program areas inspected, three apparent violations were identified (inadequate access control packages, paragraph 2; inadequate
protection of safeguards information, paragraph 3; and inadequate compensatory
!
measures, paragraph 4).
The licensee is in the process of upgrading the entire security program.
The upgrade' effort is similar in magnitude to a new plant under construction.
.
A new security management staff has been hired at the same time that many new security officers have been hired, trained, and put on shift. These new security officers are inexperienced even though they appear to have been well trained.
All of these factors contribute to the problems documented in this report.
ENCLOSURE CONTAINS SAFEGUARDS INFORMAT!0N UPON SEPARATION THIS
.
!
8908290123 890s18 PDR ADOCK 05000285 PAGE IS DECONTROLLED Q
_ _ - _ - _ _ _ _
__-__x-
u x. >
-
.
-
2
<
It f
'
-In the opinion of the inspector,.the licensee's security organization is staffed.
with management personnel experienced in nuclear security.
Upon completion of (
the security upgrade ~, along with acquiring more plant specific experience,'the
. licensee should be capable of preventing these isolated problems.
-Several'similar problems were previously identified in NRC. Inspection
-
I Report 50-285/89-10.
While the violations identified in this-report fall in the
'l l-same general classification, the specific nature of the apparent violations are<
different than those previously identified.
The' apparent violations appear to
,
be isolated' failures and not indicative of programmatic weaknesses.
<
.