Forwards Insp Rept 50-285/87-35 on 870901-30 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21)
ML20196H880
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/04/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20196H886 List:
References
EA-88-056, EA-88-56, NUDOCS 8803140090
Download: ML20196H880 (3)


See also: IR 05000285/1987035

Text

  • i

,

..

D:n. .

r * Gn.w'ns

Docket No. 50-285/87-35 SAFEGUARDS llif0RMAT10ft

License No. DPR-40 N dN

EA No. 88-56

Omaha Public Power District

ATTN: R. L. Andrews, Division Manager-

Nuclear production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection conducted by Messrs. P. H. Harrell and T. Reis of

this office during tne period September 1-30, 1987, of activities authorized by

NRC Operating License DPR-40 for the Fort Calhoun Station, and to the

discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

The area examined during the inspection was a review of the licensee's

compliance with the security plan. Within this area, the inspection consisted

of interviews with personnel and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will not be placed in the Public Document Room.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

,

Nh b k

RIV: SRI RI Ch D.DRP q E0

PHHarrell/cz , TReis DRHunter LJCallen OAPowers

3 / I /88 3 / / /88  % /38 3 /q/88 3 / t /88

8803140090 8dv304 P $ CNC~ CONTAINS ,l d

PDR ADOC.K 05000285

O DCD Er. R.MTION. . . ' D'

u ar ."t Conta,ns- bs /sei C N T H IS  !!

' I

SAFECUMiD3 . N.EATI0ff

.. FACE is DECONTROLLED t

- . _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . . _ . . __

,

'

.

Omaha Public Power District -2- l

t

.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

i

Sincerely,

0: ,

-

-

! g...

'

l

L j. L... n1

L. J. Callan, Director  !

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation l

Appendix B - NRC Inspection Report

'

2.

l 50-285/87-35

cc w/ summary page only: ,

, Fort Calhoun Station *

l ATTN: W. G. Gates, Manager

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, PN

Washington, D. C. 20036  !

Kansas Radiation Control Program Director [

!

Nebraska Radiation Control Program Director

ENCLOCUr2 CCMTAINS

SAFECl- , r 7 I; CO'WATION.

UFON E- 1AT;CN THIS

PAGE IS DECONTROLLED

- - - - - - - - - - - - - - - - - - . -

- - - - - - - - - - -

,

'

.

Omaha Public Power District -3-

Omaha Public Power District - Fort Calhoun

bec: Copy of entire report:

RIV Security File

P. A. Starcher, RSGB/NRR

Resident Inspector

R. D. Martin, RA

R. L. Bangart, DRSS

Security Inspector

Chief, RPSB

RPSB Security File

J. Lieberman, OE

D. A. Powers, E0

bec: RIV - Letter and Inspection Summary only w/766:

DRP Section Chief, DRP/B Lisa Shea, RM/ALF

RIV File MIS RSTS Operator

RPSB R. E. Hall, DRSS Project Engineer, ORP/B

bec: RIV - Letter and Inspection Summary only w/out 766:

e DMB';*IE04'

ORS

T. Bournia, NRR Project Inspector

-