Forwards IE Insp Rept 50-285/81-08 on 810330-0403 & Notice of Violation.Encls Withheld (Ref 10CFR2.790)
ML20004C231
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/28/1981
From: Brown G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Jones
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8106020368
Download: ML20004C231 (2)


Text

- --

--

,

  • y

""4 f

UNITE 3 STATES y -+

'$

NUCLEAR REGULATORY COMMISSION 5/

.E

REGION IV

.

.

[

p h Ef

611 RYAN Pt.AZA DRIVE. SUITE 1000

\\

.g

,

ARUNGTON, TEXAS 78011 s

,,

g au 2m

eg[jg ',

\\

0Ullg

,o

Docket No. 50-735/81-08 m,

'

.

Omaha Public Power District m

\\

ATTN:

W. C. Jones, Division Manager j

Production Operations i

1623 Harney Street i

Omaha, Nebraska 68102 Gentlemen:

This letter refers to the March 30 - April 3,1981, routine inspection conduct d by Ms. C. Abigail Evans and Mr. James A. F. Kelly of NRC's Region IV Office.

The activities inspected were those that are authorized under NRC License No. DPR-40.

It further refers to the discussion that they had with you con-

cerning their findings at the conclusion of the inspection.

{

\\

The inspection related to your program and activities designed to protect i

against industrial sabotage and to safeguard special nuclear material. The i

inspection was based on the applicable provisions of Title 10, Part 50, of

\\

the Code of Federal Regulations, entitled, " Licensing of Production and

,

Utilization Facilities," within Part 73 entitled, " Physical Protection of Plants and Materials," and the specific requirements of NRC License No. DPR-40.

The inspection consisted of selective examinations of procedures and records,

,

l personnel interviews, and observations by the inspectors.

l During this inspection it was found that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Enclosure (1).

Consequently, you are required to respond to '.his matter, in writing, in accordance with the provisions of Section 2.201 of th. NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Your response should be based on the specifics contained in the Notice of Violation encicsed with this letter.

The documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility's security procedures are exempt from disclosure. This exemption is covered within Title 10 CFR, Part 2, Section 2.790(d), entitled, " Rules of Practice for Domestic Licensing 10 CFR 2.790 (d) fNFORMATION IS CONTAINED ;N THIS REPORT.

\\\\

)

,

N 9 n.-oe

.

-

.--

-

..

.

'

.

.

Omaha Public Power District-2-Proceedings." Therefore, the inspection report will not be placed in the Public Docuinent Room and distribution will be limited.

If you have any questions concerning this report, we will be pleased to discuss them with you.

Sincerely, Gle

. Brown, Chief Technical Inspection Branch Enclosures:

1.

Notice of Violation 2.

IE Inspection Report No. 50-285/81-08 cc: w/ encl.

S. C. Stevens, Manager Fort Calhoun Station P. O. Box 98 Fort Calhoun, Nebraska 68102 l

.

..

. -..