APPENDIX U.S. NUCLEAR REGULATOR'r.;MMISSION OFFICE OF INSPECTION AND ENFORCMENT
REGION IV
Report No. 50-285/81-26 Docket No. 50-285 License No. OPR-40 Licensee:
Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 Facility Name:
Fort Calhoun Station, Unit 1 Meeting held at:
Omaha Public Power District Offices Omaha, Nebraska Meeting Conducted:
August 17, 1981 A
dees:
d&f0&dd P/27/f/
T. Col lins, Deputy Director Date C'M d4 J' \\ t.. GagItaryo, Director
! Date In0estigationja d Enforcement Staff
/
/1.u e:9 Y L 8 y /
J/ P.(Jatyfon, Reactor Inspector
' Dhte Systems dnd Technical Section f') )); [ y,,*, a f fl99t/g'/
i D. L. Kelley, Reactor Resident Inspector Date A
Fort Calhoun
! ;
Reviewed by:
Mp
-
29/f/
G. L. Madseri, Chief Date Reactor Projects Branch Approved by:
/$10 f $r()osA)
lb 7b/
i John T. Collins, Deputy Director
' Dat'e i
DfjjjpKOS 810902 05000285 G
-
-
-
-
- -
-
-
-
-
-
-
- -
- -
-
...
Meeting Summary:
Meeting on August 17, 1981, (Report No. 50-285/81-2_J6 Scope:
Announced management meeting to discuss the Region's concerns regarding the findings from previous inspection efforts (81-15, 81-16, 81-19, and 81-21).
The meeting involnd ten manhours in corporace offices by four NRC personnel.
Results:
No new violations or deviations were identifie i
-
-
DETAILS 1.
Persons Attending the Meeting a.
Omaha Public Power District R. L. Andrews, Section Manager, Operations G. P. L hle, Area General Manager J. J. Fisicaro, Supervisor, Administrative Services R. L. Jaworski, Section Manager, Technical Services W. C. Jones, Division Manager, Projection Operation W. E. Miller, Assistant General Manager K. J. Morris, Manager, Administrative Services T. L. Patterson, Licensing Administrator S. C. Stevens, Manager, FCS P. M. Surber, Acting Section Manager, G.S.E.
F. A. Thurtell, Division Manager, E&RA D. D. Wittke, Division Manager, Engineering Divisior b.
NRC J. T. Collins, Deputy Director J. E. Gagliardo, Director, IES J. P. Jeudon, Reactor Inspector D. L. Kelley, Reactor Resident Inspector 2.
The NRC personnel and the licensee representatives listed above met to discuss the region's concern regarding the findings identified in inspections 81-15, 81-16, 81-19, and 81-21. The Region IV representati es discussed concerns in the following areas:
a.
Drawing Control (81-15)
b.
Design Change Controls (81-15)
c.
Records / Document Controls (81-16)
d.
Security Control (81-21)
e.
Emergency Drill (81-19)
f.
Health Physics Appraisal
_ _ - _ _
_ _ _ _ __
_ _ _ _ _ _.
_
_ _ _ _ _ _ _ _ _ _ _ _
__
. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ - _ - -
a
-
3.
The licensee representatives expressed disagreement with the findings discussed in the security area and the Region IV representatives agreed to resolve the identified issues with the appropriate Region IV personnel.
The licensee expressed no significant disagreement with any of the other findings discussed during the meeting.
The 1 censee representatives assured the Region IV representatives of their commitment to the safe operation of the Fort Calhoun Station and indicated that action would be taken to correct the discrepancies identified in the inspections and discussed during this meeting.
The details of the licensee's commitment to upgrade the areas discussed during the meeting will be provided in the responses to the respective report identifing that problem.
No new violations or deviations were identified during this meetin.....